Show Job Controls
Bid Cobra

ECTOR BI 20-E (0005-01-107)

Items: 79

County: ECTOR
Length: N/A
Highway: BI 20-E
District: ODESSA
Control Number: 0005-01-107
DBE Goal: N/A
Project: NH 2018(618)
Guaranty: N/A
Time: 201 WORKING DAYS
Engineer's Estimate: $11,389,746.31
Date: 03/07/2018 (8 years ago)
Contract Number: N/A
Type: ROADWAY REHABILITATION
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$11,389,746.31
Over/Under Est: -1.77% -$202,057.27
$11,248,878.99
Over/Under Est: -1.24% -$140,867.32
Amt Left: 0.55% $61,189.95
$15,656,638.38
Over/Under Est: 37.46% $4,266,892.07
Amt Left: 39.95% $4,468,949.34
Delta: -39.18% -$4,407,759.39

Bid Items & Bid Tabulations

79 Total 0 of 79
ECTOR  |  BI 20-E  |  ODESSA  |  0005-01-107  |  03/07/2018  |  $11,389,746.31  |  NH 2018(618)  |  ROADWAY REHAB  |  201 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JONES BROS. DIRT & PAVING CONTRACTORS, INC.
REECE ALBERT, INC.
RK HALL, LLC
REMOVING CONC (RIPRAP)
SY 22.000 $15.000 $12.600 $24.600 $57.450
REMOVING CONC (CURB AND GUTTER)
LF 1,534.000 $4.000 $6.640 $5.150 $16.270
REMOVING CONC (PAVERS)
SY 324.000 $25.000 $15.750 $36.750 $30.220
REMOVING STAB BASE AND ASPH PAV(8")
SY 4,996.000 $7.000 $4.470 $5.500 $6.460
SUBGRADE WIDENING (ORD COMP)
STA 18.000 $330.000 $1,600.000 $687.000 $524.690
BACKFILL (TY B)
STA 1,175.000 $100.000 $160.000 $42.400 $71.430
BLADING
HR 220.000 $130.000 $250.000 $297.000 $153.660
PROOF ROLLING
HR 192.000 $75.000 $125.000 $82.000 $105.080
REWORK BS MTL (TY C) (6") (DENS CONT)
STA 11.000 $2,500.000 $1,340.000 $514.200 $6,183.270
PRIME COAT (AE-P)
GAL 13,208.000 $3.500 $3.200 $3.600 $5.790
SUPERPAVE MIXTURES SP-B PG70-22
TON 78,812.000 $68.000 $68.000 $68.000 $103.140
TOM-C (AGGREGATE) SAC-A
TON 27,186.000 $55.000 $57.500 $114.600 $87.060
TOM (ASPHALT) PG 70-22
TON 2,198.000 $550.000 $537.000 $88.700 $749.770
PLANE ASPH CONC PAV(0" TO 1")
SY 7,608.000 $1.250 $1.750 $2.420 $1.830
PLANE ASPH CONC PAV (1")
SY 73,182.000 $1.000 $1.450 $1.300 $1.220
PLANE ASPH CONC PAV (4")
SY 348,060.000 $3.000 $2.270 $1.130 $2.980
DRILL SHAFT (SIGN MTS) (12 IN)
LF 16.000 $110.000 $105.000 $105.000 $110.000
DRILL SHAFT (SIGN MTS) (24 IN)
LF 48.000 $140.000 $131.250 $131.250 $137.500
RIPRAP (CONC) (CL B) (4")
CY 63.000 $430.000 $588.000 $328.350 $660.000
MOBILIZATION
LS 1.000 $562,000.000 $369,400.000 $136,623.380 $250,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $8,000.000 $6,500.000 $18,865.120 $6,765.630
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 8,580.000 $5.000 $5.130 $3.300 $7.460
BIODEG EROSN CONT LOGS (REMOVE)
LF 8,580.000 $1.000 $0.930 $0.500 $0.750
CONC CURB & GUTTER (TY I)
LF 2,616.000 $12.000 $27.830 $23.750 $33.000
CONC CURB & GUTTER (TY II)
LF 196.000 $20.000 $27.830 $25.100 $38.500
RUMBLE STRIPS (SHOULDER)
LF 225,632.000 $0.130 $0.120 $0.100 $0.120
MTL W-BEAM GD FEN (STEEL POST)
LF 2,905.000 $23.000 $23.360 $23.370 $24.480
SHORT RADIUS
LF 79.000 $30.700 $26.780 $26.250 $28.050
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 9.000 $1,500.000 $1,050.000 $1,023.750 $1,100.000
REMOVE METAL BEAM GUARD FENCE
LF 2,634.000 $4.000 $3.680 $5.250 $3.850
REMOVE TERMINAL ANCHOR SECTION
EA 8.000 $210.000 $210.000 $262.500 $220.000
GUARDRAIL END TREATMENT (INSTALL)
EA 9.000 $2,400.000 $2,520.000 $2,940.000 $2,640.000
GUARDRAIL END TREATMENT (REMOVE)
EA 8.000 $250.000 $210.000 $262.500 $220.000
ALUMINUM SIGNS (TY G)
SF 449.000 $25.000 $24.150 $24.150 $25.300
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 169.000 $500.000 $798.000 $798.000 $836.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 2.000 $540.000 $919.800 $919.800 $963.600
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 110.000 $560.000 $939.750 $939.750 $984.500
IN SM RD SN SUP&AM TY10BWG(1)SA(T-EXAL)
EA 4.000 $850.000 $1,023.750 $1,023.750 $1,072.500
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 16.000 $800.000 $1,076.250 $1,076.250 $1,127.500
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 2.000 $600.000 $918.750 $918.750 $962.500
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 18.000 $700.000 $971.250 $971.250 $1,017.500
IN SM RD SN SUP&AM TYS80(1)SA(T-EXAL)
EA 2.000 $950.000 $1,139.250 $1,139.250 $1,193.500
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $900.000 $1,338.750 $1,338.750 $1,402.500
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 4.000 $1,000.000 $1,365.000 $1,365.000 $1,430.000
IN SM RD SN SUP&AM TYS80(1)SA(U-EXAL)
EA 5.000 $1,250.000 $1,391.250 $1,391.250 $1,457.500
REMOVE SM RD SN SUP&AM
EA 323.000 $86.000 $25.000 $105.000 $110.000
REMOVE BRDG MNT CLEARANCE SIGN ASSM
EA 4.000 $250.000 $630.000 $630.000 $660.000
INSTALL LRSS (STRUCT STEEL)
LB 2,584.100 $6.000 $5.250 $5.250 $5.500
REMOVE LRSA
EA 6.000 $500.000 $997.500 $997.500 $1,045.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
EA 29.000 $80.000 $141.750 $141.750 $148.500
INSTL DEL ASSM (D-SW)SZ 2(WC)GND
EA 62.000 $55.000 $141.750 $141.750 $148.500
INSTL DEL ASSM (D-SW)SZ 2(WC)GND(BI)
EA 38.000 $20.000 $141.750 $141.750 $148.500
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 176.000 $25.000 $31.500 $15.750 $33.000
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
EA 206.000 $20.000 $31.500 $15.750 $33.000
INSTL DEL ASSM (D-DY)SZ 2(WC)GND
EA 46.000 $8.000 $141.750 $141.750 $16.500
INSTL OM ASSM (OM-2Y)(WC)GND
EA 130.000 $60.000 $157.500 $157.500 $16.500
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
EA 20.000 $85.000 $141.750 $141.750 $148.500
REMOVE DELIN & OBJECT MARKER ASSMS
EA 567.000 $22.000 $15.000 $21.000 $165.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 317,712.000 $0.130 $0.120 $0.120 $0.120
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 1,270,812.000 $0.120 $0.110 $0.110 $0.110
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 847,208.000 $0.120 $0.110 $0.110 $0.110
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 99,327.000 $1.000 $1.000 $1.500 $1.760
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 72.000 $1.000 $1.260 $1.260 $1.320
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 26,007.000 $0.650 $0.680 $0.690 $0.720
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 31,562.000 $0.360 $0.280 $0.290 $0.300
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 132,193.000 $0.310 $0.280 $0.290 $0.300
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 131,857.000 $0.250 $0.280 $0.290 $0.300
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 1,410.000 $14.000 $12.600 $12.600 $13.200
PREFAB PAV MRK TY C (W) (ARROW)
EA 114.000 $195.000 $189.000 $189.000 $198.000
PREFAB PAV MRK TY C (W) (RR XING)
EA 2.000 $500.000 $472.500 $472.500 $495.000
PREFAB PAV MRK TY C (W) (18")(YLD TRI)
EA 105.000 $30.000 $18.900 $18.900 $19.800
REFL PAV MRKR TY I-C
EA 88.000 $3.200 $3.150 $3.150 $3.300
REFL PAV MRKR TY II-A-A
EA 95.000 $2.400 $3.150 $3.150 $3.300
REFL PAV MRKR TY II-C-R
EA 2,841.000 $3.500 $2.630 $2.630 $2.750
TRAFFIC BUTTON TY W
EA 100.000 $2.100 $8.400 $8.400 $8.800
PAV SURF PREP FOR MRK (4")
LF 30,202.000 $0.120 $0.070 $0.080 $0.080
PORTABLE CHANGEABLE MESSAGE SIGN
EA 8.000 $15,000.000 $8,250.000 $14,670.000 $14,096.650
TMSP RADAR SPEED CONTROL MONITOR
EA 2.000 $8,000.000 $5,500.000 $6,520.000 $10,994.930
TMA (STATIONARY)
EA 2.000 $5,000.000 $9,350.000 $35,960.000 $34,983.540
Totals: $11,389,746.310 $11,187,689.045 $11,248,878.995 $15,656,638.380