Show Job Controls
Bid Cobra

EASTLAND FM 570 (1027-01-023)

Items: 69

County: EASTLAND
Length: N/A
Highway: FM 570
District: BROWNWOOD
Control Number: 1027-01-023
DBE Goal: N/A
Project: STP 2B23(176)HES
Guaranty: N/A
Time: 50 WORKING DAYS
Engineer's Estimate: $1,195,184.30
Date: 09/06/2023 (2 years ago)
Contract Number: N/A
Type: WIDEN ROAD - ADD LANES AND SHOULDERS
Mail/Deliver Bids To: N/A
JORDAN PERRY
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$1,195,184.30
Over/Under Est: 5.23% $62,499.39
$1,621,702.17
Over/Under Est: 35.69% $426,517.87
Amt Left: 28.94% $364,018.48
Subcontractor Percentage Amount
NORTHEASTERN PAVERS, LLC 20.60% $292,481.35
F & W ELECTRICAL CONTRACTORS, INC. 8.95% $127,073.21
MARCOMS CONSTRUCTION LLC 5.10% $72,410.43
D. I. J. CONSTRUCTION, INC. 2.78% $39,470.78
J. H. ODEN CONTRACTING COMPANY 1.07% $15,191.99
WEST TEXAS ROCK RESOURCES, LLC 0.46% $6,531.14
Total: 38.96% $553,158.90

Bid Items & Bid Tabulations

69 Total 0 of 69
EASTLAND  |  FM 570  |  BROWNWOOD  |  1027-01-023  |  09/06/2023  |  $1,195,184.30  |  STP 2B23(176)HES  |  WIDEN ROAD - ADD LANES AND SHOULDERS  |  50 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JAY MILLS CONTRACTING, INCORPORATED
A. L. HELMCAMP, INC.
EXCAVATION (ROADWAY)
CY 2,347.000 $30.000 $40.000 $80.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 1,806.000 $30.000 $40.000 $62.000
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 9,061.000 $0.500 $0.560 $0.400
BROADCAST SEED (TEMP) (WARM)
SY 4,530.500 $0.500 $0.450 $0.500
BROADCAST SEED (TEMP) (COOL)
SY 4,530.500 $0.500 $0.450 $0.500
VEGETATIVE WATERING
MG 182.000 $20.000 $30.000 $45.000
PROOF ROLLING
HR 1.000 $600.000 $500.000 $300.000
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 2,192.000 $75.000 $80.000 $110.000
PRIME COAT (MC-30)
GAL 1,518.000 $7.500 $10.000 $13.000
ASPH (AC-20-5TR)
GAL 3,391.000 $7.000 $8.000 $9.500
AGGR(TY-PB GR-3 SAC-B)
CY 96.000 $225.000 $300.000 $380.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 40.000 $600.000 $900.000 $700.000
RIPRAP (CONC) (CL B) (4")
CY 1.400 $2,000.000 $2,500.000 $6,000.000
CMP AR (GAL STL DES 3)
LF 103.000 $70.000 $100.000 $180.000
SET (TY II) (DES 3) (CMP) (4: 1) (C)
EA 6.000 $2,500.000 $1,900.000 $3,000.000
SET (TY II) (DES 3) (CMP) (6: 1) (P)
EA 2.000 $2,500.000 $3,000.000 $3,800.000
REMOV STR (PIPE)
LF 65.000 $15.000 $25.000 $165.000
MOBILIZATION
LS 1.000 $110,000.000 $120,000.000 $150,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $10,000.000 $8,500.000 $19,500.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 250.000 $7.000 $6.700 $11.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 250.000 $2.000 $2.250 $1.700
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 336.000 $10.000 $11.500 $5.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 336.000 $2.000 $6.000 $1.100
CONC CURB (MOD) (TYPE I)
LF 121.000 $35.000 $80.000 $110.000
INTERSECTIONS (ACP)
SY 426.000 $100.000 $85.000 $93.000
DRIVEWAYS (SURF TREAT)
SY 340.000 $75.000 $40.000 $93.000
RUMBLE STRIPS (SHOULDER)
LF 3,880.000 $1.200 $0.450 $0.880
RUMBLE STRIPS (CENTERLINE)
LF 7,969.000 $1.500 $0.450 $0.880
RELOCATE RD IL ASM (TRANS-BASE)
EA 2.000 $8,000.000 $3,200.000 $7,500.000
IN RD IL (TY SA) 50T-12 (400W EQ) LED
EA 2.000 $7,000.000 $7,800.000 $11,000.000
CONDT (PVC) (SCH 80) (2")
LF 956.000 $30.000 $32.000 $22.000
ELEC CONDR (NO.8) BARE
LF 1,192.000 $3.000 $2.920 $2.200
ELEC CONDR (NO.8) INSULATED
LF 2,400.000 $3.500 $3.150 $2.500
GROUND BOX TY A (122311)W/APRON
EA 2.000 $6,000.000 $3,150.000 $2,500.000
ALUMINUM SIGNS (TY A)
SF 32.000 $42.000 $35.000 $28.000
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 24.000 $45.000 $35.000 $72.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 2.000 $1,500.000 $1,105.000 $1,200.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 1.000 $1,750.000 $1,105.000 $1,400.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 21.000 $900.000 $280.000 $720.000
RELOCATE SM RD SN SUP&AM TY S80
EA 1.000 $3,000.000 $880.000 $1,200.000
REMOVE SM RD SN SUP&AM
EA 13.000 $125.000 $115.000 $120.000
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
EA 2.000 $150.000 $85.000 $150.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 6,418.000 $0.500 $0.810 $0.800
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 6,418.000 $0.500 $0.810 $0.800
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 80.000 $10.000 $11.130 $6.500
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 648.000 $2.000 $3.000 $1.000
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 76.000 $2.500 $1.110 $2.500
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 2,226.000 $1.500 $1.110 $1.300
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
LF 2,302.000 $1.200 $0.670 $2.300
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 32.000 $20.000 $17.000 $9.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 1,578.000 $1.200 $0.950 $0.950
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 7,969.000 $1.200 $0.770 $0.950
PREFAB PAV MRK TY C (W) (ARROW)
EA 4.000 $500.000 $250.000 $290.000
PREFAB PAV MRK TY C (W) (WORD)
EA 4.000 $500.000 $335.000 $360.000
REFL PAV MRKR TY I-C
EA 120.000 $7.000 $5.570 $5.400
REFL PAV MRKR TY II-A-A
EA 644.000 $5.000 $5.570 $5.400
ELIM EXT PAV MRK & MRKS (4")
LF 14,136.000 $1.000 $0.850 $0.850
ELIM EXT PAV MRK & MRKS (8")
LF 200.000 $1.500 $1.800 $0.900
VEH SIG SEC (12")LED(YEL)
EA 2.000 $425.000 $755.000 $800.000
VEH SIG SEC (12")LED(RED)
EA 2.000 $425.000 $800.000 $800.000
INSTALL RDSD FLASH BEACON ASSEMBLY
EA 1.000 $10,000.000 $9,400.000 $13,000.000
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
EA 1.000 $12,000.000 $12,750.000 $17,500.000
SP MIXES SP-D SAC-B PG76-22
TON 1,455.000 $170.000 $212.000 $182.000
BONDING COURSE
GAL 1,747.000 $6.000 $0.010 $6.800
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 80.000 $25.000 $23.000 $11.500
TMA (STATIONARY)
DAY 51.000 $325.000 $210.000 $250.000
TMA (MOBILE OPERATION)
HR 32.000 $150.000 $25.000 $100.000
LEAD LED CHEVRON
EA 2.000 $3,000.000 $4,960.000 $5,300.000
LED CHEVRON
EA 24.000 $3,000.000 $2,400.000 $3,900.000
Totals: $1,195,184.300 $1,257,683.700 $1,621,702.170