EASTLAND CR (0923-09-066)

Items: 44

County: EASTLAND
Length: N/A
Highway: CR
District: BROWNWOOD
Control Number: 0923-09-066
DBE Goal: N/A
Project: BR 2021(573)
Guaranty: N/A
Time: 233 WORKING DAYS
Engineer's Estimate: $1,290,761.60
Date: 12/02/2021 (4 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (5)
E
Engineer's Estimate
$1,290,761.60
Over/Under Est: 2.1% $27,095.70
$1,398,203.57
Over/Under Est: 8.32% $107,441.97
Amt Left: 6.1% $80,346.27
Over/Under Est: 17.44% $225,085.62
Amt Left: 15.02% $197,989.92
Delta: -8.41% -$117,643.65
$1,976,759.00
Over/Under Est: 53.15% $685,997.40
Amt Left: 50% $658,901.70
Delta: -30.41% -$460,911.78
$2,253,109.75
Over/Under Est: 74.56% $962,348.15
Amt Left: 70.97% $935,252.45
Delta: -13.98% -$276,350.75
Subcontractor Percentage Amount
MORRIS COUNTY CONTRACTORS, L.L.C. 5.11% $67,342.51
CONTRACTORS SERVICE, LTD. 1.02% $13,442.14
WOLFE CONSTRUCTION GROUP, INCORPORATED 0.90% $11,860.72
TORO BRAVO CONSTRUCTION, LLC 0.20% $2,635.71
HERMANOS STEEL, LLC 0.14% $1,845.00
Total: 7.37% $97,126.08

Bid Items & Bid Tabulations

44 Total 0 of 44
EASTLAND  |  CR  |  BROWNWOOD  |  0923-09-066  |  12/02/2021  |  $1,290,761.60  |  BR 2021(573)  |  BRIDGE REPL  |  233 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HODGES AND SON CONSTRUCTION COMPANY, INC.
PIERCE R & B LLC
COPPELL CONSTRUCTION CO., INC.
IBCTX, LLC
FNF CONSTRUCTION, INC.
PREPARING ROW
STA 11.500 $2,500.000 $5,200.000 $3,000.000 $2,900.000 $9,000.000 $5,000.000
EXCAVATION (ROADWAY)
CY 461.000 $20.000 $20.000 $15.000 $22.000 $55.000 $20.000
EXCAVATION (CHANNEL)
CY 817.000 $20.000 $20.000 $15.000 $23.000 $85.000 $45.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 345.000 $30.000 $30.000 $25.000 $35.000 $85.000 $50.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 1,815.000 $2.000 $3.000 $2.200 $2.000 $3.000 $2.750
BROADCAST SEED (TEMP) (WARM)
SY 908.000 $1.000 $2.000 $2.200 $2.000 $3.000 $4.000
BROADCAST SEED (TEMP) (COOL)
SY 907.000 $1.000 $2.000 $2.200 $2.000 $3.000 $4.000
SOIL RETENTION BLANKETS (CL 2) (TY G)
SY 1,815.000 $6.500 $3.000 $2.800 $2.500 $4.000 $6.500
FL BS (CMP IN PLC)(TY D GR 3)(FNAL POS)
CY 533.000 $70.000 $90.000 $119.000 $100.000 $90.000 $80.000
CEM STABIL BKFL
CY 138.000 $250.000 $250.000 $325.000 $350.000 $275.000 $275.000
TRENCH EXCAVATION PROTECTION
LF 218.000 $15.000 $5.000 $5.000 $3.000 $1.000 $6.000
DRILL SHAFT (24 IN)
LF 87.000 $275.000 $250.000 $340.000 $331.000 $325.000 $475.000
DRILL SHAFT (36 IN)
LF 282.000 $325.000 $260.000 $310.000 $344.000 $400.000 $550.000
CORE HOLE
EA 6.000 $200.000 $200.000 $225.000 $500.000 $250.000 $200.000
CL C CONC (ABUT)
CY 88.000 $1,200.000 $1,200.000 $1,250.000 $1,450.000 $2,200.000 $2,250.000
REINF CONC SLAB
SF 3,770.000 $23.000 $28.000 $33.000 $37.000 $45.000 $65.000
REINF CONC SLAB (SLAB BEAM)
SF 1,300.000 $30.000 $25.000 $33.000 $32.000 $40.000 $75.000
PRESTR CONC SLAB BEAM (5SB15)
LF 247.500 $230.000 $250.000 $270.000 $275.000 $300.000 $500.000
PRESTR CONC GIRDER (TX28)
LF 575.860 $210.000 $205.000 $212.000 $277.000 $250.000 $450.000
RAIL (TY T223)
LF 478.000 $125.000 $130.000 $134.000 $154.000 $180.000 $165.000
ARMOR JOINT (SEALED)
LF 108.000 $150.000 $100.000 $132.000 $155.000 $130.000 $220.000
GABION MATTRESSES (GALV)(12 IN)
SY 632.000 $150.000 $125.000 $154.000 $171.000 $110.000 $110.000
GABIONS (3' X 3')(GALV)
CY 398.000 $250.000 $250.000 $255.000 $300.000 $350.000 $350.000
GABION (1.5' X 3')(GALV)
CY 47.000 $275.000 $250.000 $290.000 $425.000 $450.000 $350.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 3.000 $15,000.000 $25,000.000 $15,000.000 $20,000.000 $30,000.000 $40,000.000
MOBILIZATION
LS 1.000 $136,000.000 $120,000.000 $134,000.000 $131,000.000 $197,600.000 $230,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 14.000 $2,500.000 $2,000.000 $2,000.000 $1,025.000 $7,500.000 $5,000.000
ROCK FILTER DAMS (REMOVE)
LF 50.000 $15.000 $1.000 $10.000 $10.000 $22.000 $7.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,943.000 $3.500 $1.000 $3.400 $3.000 $5.000 $4.250
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,943.000 $1.000 $1.000 $1.100 $1.000 $2.000 $1.500
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 335.000 $6.000 $8.000 $5.200 $5.000 $6.000 $11.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 335.000 $2.000 $1.000 $1.250 $1.000 $2.000 $4.250
ROCK FILTER DAMS (INSTALL) (TY 2) (6:1)
LF 50.000 $55.000 $5.000 $40.000 $50.000 $80.000 $150.000
CONSTRUCTING DETOURS
SY 106.000 $250.000 $250.000 $270.000 $175.000 $250.000 $250.000
DRIVEWAYS (BASE)
SY 72.000 $30.000 $50.000 $88.000 $45.000 $110.000 $50.000
MTL W-BEAM GD FEN (STEEL POST)
LF 350.000 $32.000 $35.000 $39.000 $35.000 $40.000 $45.000
MTL BEAM GD FEN TRANS (TL2)
EA 12.000 $1,400.000 $1,400.000 $1,325.000 $1,400.000 $1,500.000 $1,700.000
GUARDRAIL END TREATMENT (INSTALL)
EA 12.000 $2,500.000 $3,200.000 $3,375.000 $3,600.000 $3,500.000 $4,000.000
WIRE FENCE (TY A)
LF 100.000 $20.000 $30.000 $20.000 $30.000 $66.000 $50.000
WIRE FENCE (TY D)
LF 50.000 $20.000 $60.000 $20.000 $70.000 $66.000 $100.000
GATE (TY 2)
EA 1.000 $1,000.000 $2,000.000 $1,000.000 $2,500.000 $2,750.000 $4,000.000
WIRE FENCE (WATER GAP)
LF 73.000 $20.000 $50.000 $100.000 $30.000 $33.000 $45.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 18.000 $30.000 $30.000 $20.000 $17.000 $20.000 $30.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 36.000 $30.000 $30.000 $30.000 $25.000 $26.000 $35.000
Totals: $1,290,761.600 $1,317,857.300 $1,398,203.570 $1,515,847.220 $1,976,759.000 $2,253,109.750