PREPARING ROW
|
STA
|
12.700
|
$2,000.000
|
$2,500.000
|
$1,750.000
|
$3,500.000
|
$15,000.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
915.000
|
$11.000
|
$10.000
|
$14.000
|
$20.000
|
$25.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
1,409.000
|
$12.000
|
$10.000
|
$18.000
|
$20.000
|
$25.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
25.000
|
$30.000
|
$15.000
|
$40.000
|
$50.000
|
$25.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
1,274.000
|
$30.000
|
$15.000
|
$18.000
|
$20.000
|
$25.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
3,510.000
|
$1.000
|
$0.970
|
$0.670
|
$1.500
|
$0.600
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
1,755.000
|
$1.000
|
$0.830
|
$1.120
|
$1.000
|
$1.100
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
1,755.000
|
$1.000
|
$0.920
|
$1.120
|
$1.000
|
$1.100
|
|
|
VEGETATIVE WATERING
|
MG
|
159.000
|
$13.000
|
$15.000
|
$30.000
|
$1.000
|
$50.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY B)
|
SY
|
2,556.000
|
$2.000
|
$1.290
|
$1.120
|
$2.000
|
$2.300
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY C)
|
SY
|
300.000
|
$2.000
|
$2.340
|
$1.120
|
$2.000
|
$3.500
|
|
|
PROOF ROLLING
|
HR
|
2.000
|
$100.000
|
$150.000
|
$100.000
|
$1.000
|
$150.000
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
1,420.000
|
$48.000
|
$75.000
|
$47.040
|
$70.000
|
$85.000
|
|
|
FL BS (CMP IN PLC)(TY D GR 3)(FNAL POS)
|
CY
|
171.000
|
$120.000
|
$80.000
|
$47.040
|
$70.000
|
$85.000
|
|
|
REWRK BS MTL (TY A)(2"- 4")(ORD COMP)
|
SY
|
882.000
|
$3.000
|
$8.000
|
$3.500
|
$10.000
|
$15.000
|
|
|
PRIME COAT (RC-250)
|
GAL
|
1,212.000
|
$8.000
|
$11.500
|
$12.000
|
$8.000
|
$14.000
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
11,916.000
|
$8.000
|
$5.750
|
$8.000
|
$8.000
|
$6.000
|
|
|
AGGR(TY-B GR-5 SAC-B)
|
CY
|
38.000
|
$600.000
|
$650.000
|
$1,000.000
|
$550.000
|
$750.000
|
|
|
AGGR(TY-PB GR-3 SAC-B)
|
CY
|
55.000
|
$300.000
|
$500.000
|
$1,000.000
|
$550.000
|
$650.000
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
243.000
|
$200.000
|
$132.000
|
$350.000
|
$550.000
|
$170.000
|
|
|
CEM STABIL BKFL
|
CY
|
225.000
|
$115.000
|
$300.000
|
$220.000
|
$250.000
|
$200.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
111.000
|
$31.000
|
$50.000
|
$30.000
|
$75.000
|
$25.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
126.000
|
$105.000
|
$105.000
|
$82.500
|
$100.000
|
$130.000
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
183.000
|
$270.000
|
$195.000
|
$170.500
|
$155.000
|
$240.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
315.000
|
$230.000
|
$225.000
|
$187.000
|
$180.000
|
$300.000
|
|
|
CORE HOLE
|
EA
|
4.000
|
$200.000
|
$300.000
|
$500.000
|
$200.000
|
$500.000
|
|
|
CL C CONC (ABUT)
|
CY
|
94.000
|
$1,330.000
|
$1,050.000
|
$1,150.000
|
$1,200.000
|
$1,700.000
|
|
|
REINF CONC SLAB
|
SF
|
5,060.000
|
$17.000
|
$26.000
|
$24.000
|
$24.000
|
$27.000
|
|
|
REINF CONC SLAB (SLAB BEAM)
|
SF
|
1,300.000
|
$20.000
|
$20.000
|
$20.000
|
$24.000
|
$25.000
|
|
|
APPROACH SLAB
|
CY
|
113.400
|
$440.000
|
$600.000
|
$600.000
|
$600.000
|
$750.000
|
|
|
PRESTR CONC SLAB BEAM (5SB15)
|
LF
|
247.110
|
$250.000
|
$235.000
|
$250.120
|
$220.000
|
$220.000
|
|
|
PRESTR CONC GIRDER (TX46)
|
LF
|
765.990
|
$137.000
|
$240.000
|
$214.690
|
$220.000
|
$220.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
40.000
|
$520.000
|
$550.000
|
$500.000
|
$500.000
|
$550.000
|
|
|
RAIL (TY T223)
|
LF
|
404.000
|
$120.000
|
$125.000
|
$125.000
|
$125.000
|
$140.000
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
97.000
|
$100.000
|
$90.000
|
$112.000
|
$100.000
|
$120.000
|
|
|
GABION MATTRESSES (GALV)(12 IN)
|
SY
|
1,082.000
|
$80.000
|
$85.000
|
$95.000
|
$95.000
|
$180.000
|
|
|
GABIONS (3' X 3')(GALV)
|
CY
|
271.000
|
$200.000
|
$200.000
|
$265.000
|
$300.000
|
$230.000
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
1.000
|
$20,000.000
|
$12,500.000
|
$18,000.000
|
$15,000.000
|
$30,000.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$77,000.000
|
$50,000.000
|
$74,400.000
|
$50,000.000
|
$60,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$137,000.000
|
$155,250.000
|
$238,814.900
|
$180,000.000
|
$220,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
16.000
|
$2,500.000
|
$2,500.000
|
$2,000.000
|
$2,000.000
|
$1,800.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
30.000
|
$33.000
|
$40.000
|
$63.350
|
$1.000
|
$60.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 4)
|
LF
|
30.000
|
$33.000
|
$40.000
|
$109.540
|
$1.000
|
$120.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
60.000
|
$17.000
|
$10.000
|
$14.320
|
$1.000
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,780.000
|
$5.000
|
$3.000
|
$3.140
|
$1.000
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,780.000
|
$1.000
|
$0.750
|
$0.840
|
$1.000
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
45.000
|
$10.000
|
$8.000
|
$32.350
|
$10.000
|
$7.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
45.000
|
$1.000
|
$3.000
|
$2.240
|
$1.000
|
$1.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
12.000
|
$4,500.000
|
$5,200.000
|
$2,800.000
|
$2,500.000
|
$6,000.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
570.000
|
$64.500
|
$75.000
|
$89.600
|
$100.000
|
$85.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
570.000
|
$18.000
|
$11.000
|
$16.800
|
$10.000
|
$25.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
570.000
|
$19.000
|
$19.000
|
$19.040
|
$30.000
|
$15.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
102.000
|
$25.000
|
$50.000
|
$30.000
|
$60.000
|
$65.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
450.000
|
$23.000
|
$31.000
|
$29.150
|
$26.000
|
$35.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,795.000
|
$1,850.000
|
$1,925.000
|
$1,800.000
|
$2,000.000
|
|
|
MTL BEAM GD FEN TRANS (TL2)
|
EA
|
4.000
|
$1,200.000
|
$1,225.000
|
$1,265.000
|
$1,200.000
|
$1,400.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
650.000
|
$4.000
|
$2.700
|
$2.750
|
$1.000
|
$3.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
8.000
|
$2,495.000
|
$2,750.000
|
$2,915.000
|
$2,800.000
|
$3,000.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$300.000
|
$225.000
|
$225.000
|
$500.000
|
$500.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$2,000.000
|
$2,650.000
|
$2,750.000
|
$2,000.000
|
$2,500.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,000.000
|
$1,086.000
|
$1,100.000
|
$1,000.000
|
$1,500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$10,000.000
|
$9,700.000
|
$10,147.500
|
$12,500.000
|
$10,000.000
|
|
|
WIRE FENCE (TY C)
|
LF
|
270.000
|
$16.000
|
$15.000
|
$24.000
|
$20.000
|
$20.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
1.000
|
$225.000
|
$500.000
|
$392.000
|
$500.000
|
$250.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
4.000
|
$575.000
|
$750.000
|
$952.000
|
$800.000
|
$650.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
1.000
|
$87.000
|
$100.000
|
$112.000
|
$100.000
|
$200.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
12.000
|
$24.000
|
$21.000
|
$16.500
|
$30.000
|
$15.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
18.000
|
$21.000
|
$19.000
|
$16.500
|
$5.000
|
$1.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
30.000
|
$38.000
|
$28.000
|
$27.500
|
$30.000
|
$25.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
2,070.000
|
$0.400
|
$2.100
|
$1.120
|
$1.000
|
$3.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
10,800.000
|
$0.400
|
$1.580
|
$0.784
|
$0.800
|
$1.800
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
270.000
|
$5.000
|
$4.400
|
$4.480
|
$5.000
|
$5.000
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
24.000
|
$8.000
|
$13.000
|
$8.960
|
$10.000
|
$12.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
1,800.000
|
$1.000
|
$1.090
|
$1.480
|
$2.000
|
$1.200
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
1,470.000
|
$1.000
|
$1.100
|
$1.520
|
$2.000
|
$1.200
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
4,310.000
|
$1.000
|
$1.070
|
$1.230
|
$1.250
|
$1.200
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
131.000
|
$5.000
|
$4.750
|
$4.480
|
$5.000
|
$5.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
7,090.000
|
$0.350
|
$0.380
|
$1.000
|
$1.000
|
$0.500
|
|
|
ELIM EXT PV MRK & MRKS (RUMBLE STRIP)
|
LF
|
32.000
|
$13.500
|
$7.450
|
$8.960
|
$10.000
|
$6.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
440.000
|
$1.000
|
$1.210
|
$0.560
|
$0.500
|
$1.200
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
90.000
|
$60.000
|
$34.000
|
$67.000
|
$120.000
|
$85.000
|
|
|
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
|
LF
|
160.000
|
$14.000
|
$16.000
|
$16.500
|
$50.000
|
$20.000
|
|
|
TMA (STATIONARY)
|
DAY
|
5.000
|
$350.000
|
$225.080
|
$300.000
|
$500.000
|
$450.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
24.000
|
$50.000
|
$76.000
|
$500.000
|
$20.000
|
$30.000
|
|
Totals: |
$1,747,468.630
|
$1,898,889.990
|
$2,060,592.796
|
$2,069,701.500
|
$2,492,188.800
|