EASTLAND IH 20 (0007-06-267)

Items: 57

County: EASTLAND
Length: N/A
Highway: IH 20
District: BROWNWOOD
Control Number: 0007-06-267
DBE Goal: 0.0%
Project: C 7-6-267
Guaranty: N/A
Time: 119 WORKING DAYS
Engineer's Estimate: $3,278,045.10
Date: 08/02/2024 (1 year ago)
Contract Number: N/A
Type: SURFACING/ROADWAY RESTORATION
Mail/Deliver Bids To: N/A
JORDAN PERRY
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (1)
E
Engineer's Estimate
$3,278,045.10
$4,787,222.92
Over/Under Est: 46.04% $1,509,177.82

Bid Items & Bid Tabulations

57 Total 0 of 57
EASTLAND  |  IH 20  |  BROWNWOOD  |  0007-06-267  |  08/02/2024  |  $3,278,045.10  |  C 7-6-267  |  SURF/ROADWAY RESTOR  |  119 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HJC FARMS, INC.
REMOVING CONCRETE(MOW STRIP)
LF 4,300.000 $10.000 $20.000
EXCAVATION (ROADWAY)
CY 1,846.000 $35.000 $60.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 3,042.000 $25.000 $60.000
BLADING
STA 75.000 $130.000 $575.000
PROOF ROLLING
HR 6.000 $200.000 $60.000
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 636.000 $92.000 $60.000
PLANE ASPH CONC PAV (1.5")
SY 30,956.000 $4.000 $11.500
CL C CONC (RAIL FOUNDATION)
CY 421.000 $900.000 $995.000
RIPRAP (MOW STRIP)(4 IN)
CY 121.500 $650.000 $700.000
CLEANING AND SEALING EXIST JOINTS(CL3)
LF 376.000 $45.000 $75.000
RAIL (TY SSTR) (W/DRAIN SLOTS)
LF 3,008.000 $95.000 $180.000
MOBILIZATION
LS 1.000 $241,265.000 $500,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $12,000.000 $900.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 500.000 $5.000 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 500.000 $1.500 $1.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,658.000 $6.750 $8.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,658.000 $1.750 $1.000
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 1,100.000 $20.000 $20.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 1,000.000 $15.000 $15.000
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 1,100.000 $20.000 $20.000
PERM CTB (SGL SLOPE) (TY 1) (54 )
LF 3,817.000 $175.000 $25.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 15,596.000 $0.300 $0.300
MTL W-BEAM GD FEN (STEEL POST)
LF 2,464.500 $35.000 $31.250
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $3,570.000 $2,675.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,500.000 $1,450.000
REMOVE METAL BEAM GUARD FENCE
LF 4,030.000 $3.250 $2.000
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $250.000 $200.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 2.000 $225.000 $200.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 6.000 $250.000 $200.000
CABLE BARRIER TERMINAL SECTION (TL-3)
EA 1.000 $6,500.000 $5,000.000
REMOVE CABLE BARRIER
LF 2,639.000 $5.500 $4.000
REMOVE CABLE BARRIER TERMINAL SECTION
EA 3.000 $775.000 $1,250.000
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $3,625.000 $3,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 5.000 $300.000 $200.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 4.000 $2,000.000 $2,500.000
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $1,000.000 $1,500.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 5.000 $9,500.000 $7,500.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 31.000 $25.000 $19.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 40.000 $22.250 $19.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 15.000 $25.000 $15.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 25.000 $25.000 $25.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 5,240.000 $2.000 $2.500
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 932.000 $1.500 $2.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,604.000 $1.750 $0.250
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 600.000 $6.500 $5.000
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 3,920.000 $0.900 $1.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 15,596.000 $0.900 $1.000
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 15,596.000 $0.900 $1.000
REFL PAV MRKR TY II-C-R
EA 392.000 $6.000 $5.000
HIGH FRICTION SURFACE COURSE
SY 1,564.000 $40.000 $61.000
D-GR HMA TY-B SAC-B PG64-22
TON 1,330.000 $125.000 $230.000
TACK COAT
GAL 665.000 $4.000 $9.500
PFC-C PG76-22 SAC-A
TON 2,487.000 $200.000 $575.000
BONDING COURSE
GAL 7,468.000 $5.000 $9.250
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 206.000 $110.000 $200.000
TMA (STATIONARY)
DAY 104.000 $200.000 $300.000
TMA (MOBILE OPERATION)
DAY 15.000 $300.000 $600.000
Totals: $3,278,045.100 $4,787,222.925