REMOVING CONCRETE(MOW STRIP)
|
LF
|
4,300.000
|
$10.000
|
$20.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
1,846.000
|
$35.000
|
$60.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
3,042.000
|
$25.000
|
$60.000
|
|
|
BLADING
|
STA
|
75.000
|
$130.000
|
$575.000
|
|
|
PROOF ROLLING
|
HR
|
6.000
|
$200.000
|
$60.000
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
636.000
|
$92.000
|
$60.000
|
|
|
PLANE ASPH CONC PAV (1.5")
|
SY
|
30,956.000
|
$4.000
|
$11.500
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
421.000
|
$900.000
|
$995.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
121.500
|
$650.000
|
$700.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL3)
|
LF
|
376.000
|
$45.000
|
$75.000
|
|
|
RAIL (TY SSTR) (W/DRAIN SLOTS)
|
LF
|
3,008.000
|
$95.000
|
$180.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$241,265.000
|
$500,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
7.000
|
$12,000.000
|
$900.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
500.000
|
$5.000
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
500.000
|
$1.500
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
1,658.000
|
$6.750
|
$8.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,658.000
|
$1.750
|
$1.000
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
1,100.000
|
$20.000
|
$20.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
1,000.000
|
$15.000
|
$15.000
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
1,100.000
|
$20.000
|
$20.000
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (54 )
|
LF
|
3,817.000
|
$175.000
|
$25.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
15,596.000
|
$0.300
|
$0.300
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
2,464.500
|
$35.000
|
$31.250
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$3,570.000
|
$2,675.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$1,500.000
|
$1,450.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
4,030.000
|
$3.250
|
$2.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$250.000
|
$200.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
2.000
|
$225.000
|
$200.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
6.000
|
$250.000
|
$200.000
|
|
|
CABLE BARRIER TERMINAL SECTION (TL-3)
|
EA
|
1.000
|
$6,500.000
|
$5,000.000
|
|
|
REMOVE CABLE BARRIER
|
LF
|
2,639.000
|
$5.500
|
$4.000
|
|
|
REMOVE CABLE BARRIER TERMINAL SECTION
|
EA
|
3.000
|
$775.000
|
$1,250.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
1.000
|
$3,625.000
|
$3,000.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
5.000
|
$300.000
|
$200.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
4.000
|
$2,000.000
|
$2,500.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
1.000
|
$1,000.000
|
$1,500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
5.000
|
$9,500.000
|
$7,500.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
31.000
|
$25.000
|
$19.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
40.000
|
$22.250
|
$19.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
15.000
|
$25.000
|
$15.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
25.000
|
$25.000
|
$25.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
5,240.000
|
$2.000
|
$2.500
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
932.000
|
$1.500
|
$2.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,604.000
|
$1.750
|
$0.250
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
600.000
|
$6.500
|
$5.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
3,920.000
|
$0.900
|
$1.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
15,596.000
|
$0.900
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
15,596.000
|
$0.900
|
$1.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
392.000
|
$6.000
|
$5.000
|
|
|
HIGH FRICTION SURFACE COURSE
|
SY
|
1,564.000
|
$40.000
|
$61.000
|
|
|
D-GR HMA TY-B SAC-B PG64-22
|
TON
|
1,330.000
|
$125.000
|
$230.000
|
|
|
TACK COAT
|
GAL
|
665.000
|
$4.000
|
$9.500
|
|
|
PFC-C PG76-22 SAC-A
|
TON
|
2,487.000
|
$200.000
|
$575.000
|
|
|
BONDING COURSE
|
GAL
|
7,468.000
|
$5.000
|
$9.250
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
206.000
|
$110.000
|
$200.000
|
|
|
TMA (STATIONARY)
|
DAY
|
104.000
|
$200.000
|
$300.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
15.000
|
$300.000
|
$600.000
|
|
Totals: |
$3,278,045.100
|
$4,787,222.925
|