Job Info for 0922-23-010

County: DUVAL Highway: TO Date: 08/01/2024 (3 months ago) Engineer's Estimate: $2,644,774 Control Number: 0922-23-010
Project: BR 2B23(173) District: LAREDO Time: 148 WORKING DAYS Type: BRIDGE REPLACEMENT
Bidder's List
Informational:

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $2,644,774.19
CK NEWBERRY, LLC   $2,301,233.00 1
-12.99% | -$343,541.19
ACEE CONSTRUCTION LLC.   $2,415,890.30 2
-8.65% | -$228,883.89
4.98% | $114,657.30
E-Z BEL CONSTRUCTION, LLC   $2,688,859.00 3
1.67% | $44,084.81
16.84% | $387,626.00
11.30% | $272,968.70
DELGADO'S CONTRACTORS, LLC   $2,867,543.00 4
8.42% | $222,768.81
24.61% | $566,310.00
6.65% | $178,684.00
STX CIVIL   $2,954,725.50 5
11.72% | $309,951.31
28.4% | $653,492.50
3.04% | $87,182.50
J. CARROLL WEAVER, INC.   $3,000,816.83 6
13.46% | $356,042.64
30.4% | $699,583.83
1.56% | $46,091.33
JAMES CONSTRUCTION GROUP, LLC   $3,010,523.53 7
13.83% | $365,749.34
30.82% | $709,290.53
0.32% | $9,706.70
Subcontractor Percentage Amount
GREGORY PILE DRIVING, INC. 7.50% $172,592.48
J. R. (JOE) RAMON & SONS, INC. 3.69% $84,915.50
SOIL TECH ADVANCE INC. 3.05% $70,187.61
TORO BRAVO CONSTRUCTION, LLC 1.93% $44,413.80
HIGHWAY BARRICADES AND SERVICES, LLC 1.15% $26,464.18
DEPENDABLE FENCE 0.33% $7,594.07
PENHALL COMPANY 0.27% $6,213.33
Total: 17.92% $412,380.97

Bid Items

Items: 48, 0 filtered
DUVAL TO  |  LAREDO  |  0922-23-010  |  08/01/2024  |  $2,644,774  |  BR 2B23(173)  |  BRIDGE REPL  |  148 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate CK NEWBERRY, LLC ACEE CONSTRUCTION LLC. E-Z BEL CONSTRUCTION, LLC DELGADO'S CONTRACTORS, LLC STX CIVIL J. CARROLL WEAVER, INC. JAMES CONSTRUCTION GROUP, LLC
100 6002 PREPARING ROW STA 4.200 $11,683.000 $10,000.000 $5,750.000 $25,000.000 $3,000.000 $5,500.000 $11,713.420 $71,428.000
104 6015 REMOVING CONC (SIDEWALKS) SY 80.000 $28.000 $25.000 $15.000 $23.000 $15.000 $12.000 $17.190 $19.530
104 6022 REMOVING CONC (CURB AND GUTTER) LF 138.000 $18.000 $15.000 $15.000 $8.000 $20.000 $10.000 $9.970 $3.680
105 6062 REMOVING STAB BASE AND ASPH PAV(4"-16") SY 334.000 $8.000 $20.000 $7.500 $18.000 $25.000 $15.000 $21.270 $14.000
216 6001 PROOF ROLLING HR 2.000 $102.050 $80.000 $57.050 $150.000 $100.000 $195.000 $84.000 $116.710
247 6041 FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS) CY 63.000 $125.000 $275.000 $185.000 $188.000 $175.000 $150.000 $136.320 $189.760
310 6009 PRIME COAT (MC-30) GAL 45.000 $10.000 $40.000 $10.000 $6.000 $50.000 $85.000 $35.560 $16.780
316 6015 ASPH (AC-15P) GAL 170.000 $20.000 $15.000 $10.000 $25.000 $40.000 $30.000 $12.560 $16.780
316 6238 AGGR(TY-PD GR-3 SAC-B) CY 3.000 $1,500.000 $1,400.000 $305.000 $5,000.000 $1,500.000 $3,500.000 $4,216.400 $1,258.470
316 6240 AGGR(TY-PD GR-4 SAC-B) CY 2.000 $1,500.000 $2,000.000 $425.000 $5,000.000 $1,500.000 $4,500.000 $4,215.780 $1,258.480
400 6005 CEM STABIL BKFL CY 171.600 $180.000 $175.000 $140.000 $263.000 $275.000 $250.000 $156.800 $178.380
416 6004 DRILL SHAFT (36 IN) LF 850.000 $280.000 $250.000 $370.000 $240.000 $410.000 $400.000 $261.820 $320.970
420 6013 CL C CONC (ABUT) CY 51.800 $1,330.000 $1,500.000 $1,100.000 $2,000.000 $1,800.000 $1,450.000 $1,484.000 $1,500.000
420 6029 CL C CONC (CAP) CY 121.100 $1,500.000 $1,000.000 $1,250.000 $1,400.000 $2,100.000 $1,450.000 $1,489.600 $1,800.000
420 6037 CL C CONC (COLUMN) CY 77.200 $1,850.000 $1,500.000 $1,000.000 $2,380.000 $1,250.000 $2,300.000 $1,680.000 $2,000.000
422 6001 REINF CONC SLAB SF 15,400.000 $27.000 $23.000 $22.500 $25.000 $30.000 $26.000 $29.450 $27.470
422 6013 BRIDGE SIDEWALK SF 4,550.000 $32.970 $15.000 $15.500 $15.000 $30.000 $30.000 $18.480 $16.820
422 6015 APPROACH SLAB CY 71.000 $640.000 $850.000 $950.000 $1,050.000 $1,300.000 $70.000 $896.000 $764.030
425 6035 PRESTR CONC GIRDER (TX28) LF 2,082.100 $220.000 $200.000 $205.000 $250.000 $210.000 $280.000 $250.880 $250.000
432 6031 RIPRAP (STONE PROTECTION)(12 IN) CY 436.500 $225.000 $225.000 $197.500 $200.000 $220.000 $325.000 $168.000 $285.270
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 7.000 $650.000 $850.000 $550.000 $990.000 $650.000 $600.000 $689.920 $693.550
442 6007 STR STEEL (MISC NON - BRIDGE) LB 530.800 $25.000 $35.000 $40.000 $29.000 $20.000 $40.000 $32.480 $21.330
450 6032 RAIL (TY C223) LF 748.000 $230.000 $125.000 $165.000 $210.000 $180.000 $190.000 $224.000 $132.900
454 6018 SEALED EXPANSION JOINT (4 IN) (SEJ - M) LF 132.000 $222.000 $250.000 $250.000 $295.000 $275.000 $315.000 $304.640 $245.120
496 6010 REMOV STR (BRIDGE 100 - 499 FT LENGTH) EA 1.000 $41,980.000 $100,000.000 $95,000.000 $85,000.000 $100,000.000 $105,000.000 $301,252.500 $130,000.000
500 6001 MOBILIZATION LS 1.000 $234,140.090 $225,000.000 $200,000.000 $245,000.000 $200,000.000 $250,000.000 $343,846.540 $299,300.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 8.000 $7,500.000 $2,500.000 $3,500.000 $4,000.000 $2,500.000 $5,000.000 $7,280.000 $1,993.090
506 6003 ROCK FILTER DAMS (INSTALL) (TY 3) LF 394.000 $80.000 $150.000 $166.950 $46.000 $75.000 $85.000 $50.400 $100.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 394.000 $10.000 $30.000 $31.500 $17.000 $15.000 $15.000 $11.200 $18.000
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 223.000 $40.000 $25.000 $62.550 $17.000 $35.000 $70.000 $28.000 $27.000
506 6024 CONSTRUCTION EXITS (REMOVE) SY 223.000 $11.100 $10.000 $26.250 $8.000 $15.000 $10.000 $11.200 $10.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 420.000 $5.000 $10.000 $8.400 $2.000 $7.000 $5.000 $8.960 $3.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 420.000 $1.000 $5.000 $6.300 $2.000 $1.000 $1.000 $0.560 $1.000
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 88.000 $8.800 $10.000 $10.500 $11.000 $10.000 $15.000 $61.600 $6.170
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 88.000 $2.150 $5.000 $10.500 $1.000 $2.000 $1.000 $17.920 $1.050
512 6089 PTB(FRN&INSTL)(SSCB OR CSB)(TY1)OR(STL) LF 60.000 $52.000 $100.000 $27.500 $107.000 $100.000 $120.000 $69.510 $84.340
512 6091 PTB(REMOVE)(SSCB OR CSB)(TY1)OR(STL) LF 60.000 $25.000 $50.000 $12.000 $58.000 $25.000 $30.000 $69.510 $8.990
529 6008 CONC CURB & GUTTER (TY II) LF 141.000 $52.000 $70.000 $45.000 $29.000 $50.000 $50.000 $49.280 $51.100
531 6003 CONC SIDEWALKS (6") SY 94.000 $150.000 $150.000 $80.000 $93.000 $100.000 $90.000 $145.600 $86.860
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 45.000 $32.000 $75.000 $134.000 $75.000 $35.000 $90.000 $85.120 $50.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 1.000 $3,700.000 $4,300.000 $4,250.000 $4,315.000 $3,800.000 $5,100.000 $4,928.000 $5,000.000
666 6174 REFL PAV MRK TY II (W) 6" (SLD) LF 843.000 $0.200 $2.000 $2.000 $2.000 $3.500 $3.000 $2.240 $1.900
666 6210 REFL PAV MRK TY II (Y) 6" (SLD) LF 842.000 $0.200 $2.000 $2.000 $2.000 $3.500 $3.000 $2.240 $1.900
666 6309 RE PM W/RET REQ TY I (W)6"(SLD)(100MIL) LF 843.000 $0.200 $3.000 $3.300 $3.000 $6.000 $5.000 $3.530 $3.150
666 6321 RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL) LF 842.000 $1.400 $3.000 $3.300 $3.000 $6.000 $5.000 $3.530 $3.150
678 6002 PAV SURF PREP FOR MRK (6") LF 1,685.000 $0.060 $0.500 $0.550 $1.000 $4.500 $1.000 $0.560 $0.500
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 4.000 $15,000.000 $7,000.000 $16,000.000 $4,000.000 $15,000.000 $10,000.000 $7,280.000 $5,460.530
6185 6002 TMA (STATIONARY) DAY 180.000 $225.000 $20.000 $210.000 $120.000 $450.000 $300.000 $112.000 $109.210
Totals: $2,644,774.19 $2,301,233.00 $2,415,890.30 $2,688,859.00 $2,867,543.00 $2,954,725.50 $3,000,816.85 $3,010,523.55