DONLEY US 287 (0042-08-058)

Items: 35

County: DONLEY
Length: N/A
Highway: US 287
District: CHILDRESS
Control Number: 0042-08-058
DBE Goal: N/A
Project: NH 2021(092)
Guaranty: N/A
Time: 98 WORKING DAYS
Engineer's Estimate: $3,773,333.20
Date: 10/02/2020 (5 years ago)
Contract Number: N/A
Type: OVERLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$3,773,333.20
$3,770,387.84
Over/Under Est: -0.08% -$2,945.36
$3,807,365.61
Over/Under Est: 0.9% $34,032.41
Amt Left: 0.98% $36,977.77
$3,895,013.58
Over/Under Est: 3.22% $121,680.38
Amt Left: 3.31% $124,625.74
Delta: -2.30% -$87,647.97

Bid Items & Bid Tabulations

35 Total 0 of 35
DONLEY  |  US 287  |  CHILDRESS  |  0042-08-058  |  10/02/2020  |  $3,773,333.20  |  NH 2021(092)  |  OVERLAY  |  98 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
J. LEE MILLIGAN, INC.
GILVIN-TERRILL, LTD.
DUININCK, INC.
REMOVING STAB BASE & ASPH PAV (18")
SY 2,384.000 $15.000 $18.850 $9.000 $9.000
BACKFILL (TY A OR B)
STA 518.000 $220.000 $122.000 $330.000 $435.000
BLADING
HR 15.000 $140.000 $390.000 $350.000 $395.000
DRILL SEEDING (PERM) (RURAL) (SANDY)
AC 23.800 $320.000 $360.000 $325.000 $355.000
VEGETATIVE WATERING
MG 929.000 $25.000 $12.000 $30.000 $25.000
PLANE ASPH CONC PAV(0" TO 2")
SY 5,722.000 $3.000 $3.500 $4.000 $2.700
PLANE ASPH CONC PAV (2")
SY 1,716.000 $3.750 $5.150 $6.000 $8.700
RIPRAP (MOW STRIP)(4 IN)
CY 286.000 $520.000 $721.000 $550.000 $705.000
REMOV STR (SET)
EA 8.000 $650.000 $780.000 $1,000.000 $435.000
REMOV STR (PIPE)
LF 180.000 $20.000 $93.000 $50.000 $16.500
REMOV STR (SMALL FENCE)
LF 150.000 $2.000 $7.250 $20.000 $11.000
MOBILIZATION
LS 1.000 $313,022.700 $375,000.000 $375,000.000 $380,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $18,000.000 $20,500.000 $5,450.000 $13,500.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 500.000 $6.000 $10.000 $7.000 $5.200
RUMBLE STRIPS (SHOULDER)
LF 93,470.000 $0.120 $0.300 $0.160 $0.140
MTL W-BEAM GD FEN (STEEL POST)
LF 5,888.000 $27.000 $25.000 $21.000 $23.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $1,300.000 $1,250.000 $1,025.000 $1,100.000
REMOVE METAL BEAM GUARD FENCE
LF 5,888.000 $3.000 $3.350 $3.000 $3.250
REMOVE TERMINAL ANCHOR SECTION
EA 5.000 $350.000 $335.000 $300.000 $325.000
GUARDRAIL END TREATMENT (INSTALL)
EA 5.000 $3,500.000 $2,525.000 $2,590.000 $2,800.000
GUARDRAIL END TREATMENT (REMOVE)
EA 5.000 $350.000 $280.000 $300.000 $325.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 72.000 $30.000 $25.000 $34.000 $37.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 4,077.000 $1.000 $1.150 $1.000 $1.100
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 824.000 $0.900 $0.930 $0.840 $1.050
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 5,398.000 $0.550 $0.930 $0.840 $1.050
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 360.000 $21.000 $55.450 $50.000 $27.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 13,590.000 $0.400 $0.470 $0.420 $0.430
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 52,145.000 $0.400 $0.470 $0.420 $0.320
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 52,944.000 $0.400 $0.470 $0.420 $0.320
REFL PAV MRKR TY I-C
EA 36.000 $4.500 $4.150 $3.750 $5.450
REFL PAV MRKR TY II-C-R
EA 617.000 $4.000 $4.150 $3.750 $4.350
D-GR HMA TY-D SAC-A PG70-28
TON 25,606.000 $101.000 $95.500 $101.000 $99.500
TACK COAT
GAL 23,279.000 $3.000 $3.350 $3.000 $2.950
TMA (STATIONARY)
DAY 98.000 $390.000 $375.000 $300.000 $270.000
TMA (MOBILE OPERATION)
HR 80.000 $100.000 $85.000 $95.000 $98.000
Totals: $3,773,333.200 $3,770,387.840 $3,807,365.610 $3,895,013.580