Show Job Controls
Bid Cobra

DONLEY US 287 (0042-07-067)

Items: 115

County: DONLEY
Length: N/A
Highway: US 287
District: CHILDRESS
Control Number: 0042-07-067
DBE Goal: N/A
Project: C 42-7-67
Guaranty: N/A
Time: 162 WORKING DAYS
Engineer's Estimate: $7,155,198.10
Date: 06/06/2018 (7 years ago)
Contract Number: N/A
Type: REHABILITATION OF EXISTING ROAD
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$7,155,198.10
$7,991,425.56
Over/Under Est: 11.69% $836,227.46
$8,765,221.26
Over/Under Est: 22.5% $1,610,023.16
Amt Left: 9.68% $773,795.70

Bid Items & Bid Tabulations

115 Total 0 of 115
DONLEY  |  US 287  |  CHILDRESS  |  0042-07-067  |  06/06/2018  |  $7,155,198.10  |  C 42-7-67  |  REHAB OF EXIST ROAD  |  162 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
J. LEE MILLIGAN, INC.
DUININCK, INC.
PREPARING ROW (TREE) (36" TO 48" DIA)
EA 1.000 $1,800.000 $2,300.000 $4,200.000
REMOVING CONC (PAV)
SY 629.000 $7.500 $30.000 $22.500
REMOVING CONC (RIPRAP)
SY 7.200 $20.000 $148.000 $42.000
REMOVING CONC (SIDEWALKS)
SY 89.000 $20.000 $13.500 $23.500
REMOVING CONC (DRIVEWAYS)
SY 76.000 $25.000 $31.000 $42.000
REMOVING CONC (CURB)
LF 4,036.000 $3.500 $3.000 $7.350
REMOVING CONC (CURB AND GUTTER)
LF 175.000 $25.000 $4.000 $8.500
REMOVING CONC (WHEELCHAIR RAMP)
SY 17.000 $27.000 $33.500 $42.000
REMOVING STAB BASE AND ASPH PAV (2")
SY 531.000 $15.000 $13.000 $12.000
REMOVING STAB BASE & ASPH PAV (9")
SY 7,094.000 $7.100 $6.000 $7.600
EXCAVATION (ROADWAY)
CY 28,767.000 $9.500 $9.500 $15.500
EXCAVATION (CHANNEL)
CY 2,419.100 $15.000 $9.100 $18.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 1,258.600 $20.000 $18.000 $15.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 2,394.000 $20.000 $20.000 $9.750
BLADING
HR 17.000 $150.000 $350.000 $375.000
DRILL SEEDING (PERM) (RURAL) (SANDY)
AC 28.000 $450.000 $315.000 $315.000
DRILL SEEDING (TEMP) (WARM)
AC 14.000 $450.000 $210.000 $210.000
DRILL SEEDING (TEMP) (COOL)
AC 14.000 $450.000 $280.000 $280.000
VEGETATIVE WATERING
MG 1,092.000 $22.000 $20.000 $31.500
PROOF ROLLING
HR 37.000 $135.000 $240.000 $155.000
REWORK BS MTL (TY B)(12")(DENS CONT)
SY 3,659.000 $14.000 $5.950 $11.500
CEMENT
TON 563.170 $160.000 $160.000 $165.000
CEMENT TREAT (EXIST MATL) (6")
SY 51,937.000 $2.500 $2.300 $3.250
CEMENT TREAT (SUBGRADE)(9")
SY 6,233.000 $5.500 $5.000 $6.050
CEMENT TREAT (EXIST MATL)(DC)(6")
SY 1,392.000 $5.000 $8.350 $13.500
PRIME COAT (MC-30)
GAL 12,561.000 $3.500 $3.450 $4.500
EMULS ASPH (EROSN CONT)(CSS-1H)
GAL 25,066.000 $2.500 $3.200 $3.200
D-GR HMA(SQ) TY-B PG70-22
TON 2,743.000 $115.000 $93.000 $130.000
D-GR HMA(SQ) TY-D SAC-A PG70-28
TON 7,682.000 $115.000 $102.000 $125.000
PLANE ASPH CONC PAV (8")
SY 6,233.000 $2.650 $5.250 $5.400
PLANE ASPH CONC PAV (3")
SY 7,094.000 $2.400 $2.300 $2.950
PLANE ASPH CONC PAV (5")
SY 55,247.000 $2.250 $2.800 $3.450
CONC PVMT (CONT REINF - CRCP) (10")
SY 1,392.000 $60.000 $97.300 $145.000
CONC PVMT (CONT REINF - CRCP) (11")
SY 51,937.000 $60.000 $71.350 $68.750
FLOWABLE BACKFILL
CY 7.000 $410.000 $265.000 $265.000
DRILL SHAFT (30 IN)
LF 96.000 $250.000 $342.500 $340.000
RIPRAP (CONC)(4 IN)
CY 140.000 $650.000 $527.000 $525.000
CMP (GAL STL 12 IN)
LF 1,100.000 $32.000 $52.700 $52.500
CMP 36" SPECIAL,CLASS 1(SHAPE 1)GUAGE 8
LF 80.000 $120.000 $60.000 $265.000
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 3.000 $350.000 $475.000 $475.000
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
LF 6.000 $460.000 $555.000 $555.000
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
LF 12.000 $500.000 $790.000 $790.000
WINGWALL (PW - 1) (HW=3 FT)
EA 2.000 $6,000.000 $10,550.000 $10,500.000
WINGWALL (PW - 1) (HW=4 FT)
EA 1.000 $9,275.000 $20,550.000 $20,500.000
SET (TY II) (12 IN) (CMP) (6: 1) (P)
EA 2.000 $850.000 $1,320.000 $1,300.000
SET (TY II) (36 IN) (CMP) (4: 1) (C)
EA 4.000 $2,000.000 $4,750.000 $4,700.000
JAC BOR OR TUN 36" CMP SPECIAL
LF 80.000 $1,100.000 $655.000 $1,100.000
REMOV STR (PIPE)
LF 1,150.000 $25.000 $24.100 $16.000
MOBILIZATION
LS 1.000 $501,917.000 $790,000.000 $790,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $7,500.000 $15,000.000 $29,500.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 500.000 $35.000 $42.100 $42.500
CONSTRUCTION EXITS (REMOVE)
SY 1,000.000 $12.000 $6.100 $8.550
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 1,000.000 $4.500 $7.650 $6.350
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
LF 2,400.000 $15.000 $12.550 $16.500
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 2,400.000 $12.000 $7.050 $7.950
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 2,400.000 $10.000 $12.550 $15.000
CONC CURB (MONO) (TY II)
LF 1,236.000 $8.800 $7.350 $4.550
CONC CURB & GUTTER (TY II)
LF 208.000 $45.000 $35.100 $37.000
INTERSECTIONS (CONC)
SY 1,564.000 $90.000 $80.000 $95.000
DRIVEWAYS (CONC)
SY 385.000 $90.000 $95.650 $92.500
CONC SIDEWALKS (4")
SY 119.000 $90.000 $84.350 $68.500
CRASH CUSH ATTEN (DES SOURCE)
EA 2.000 $3,000.000 $4,215.000 $3,200.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $2,400.000 $2,100.000 $2,600.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,000.000 $2,100.000 $1,100.000
RELOCATE RD IL ASM (TRANS-BASE)
EA 12.000 $650.000 $527.000 $525.000
REPLACE LUMINAIRE W/LED (400W EQ)
EA 26.000 $1,100.000 $1,055.000 $1,100.000
CONDT (PVC) (SCH 40) (2")
LF 2,615.000 $7.500 $6.600 $6.600
CONDT (PVC) (SCH 80) (2") (BORE)
LF 330.000 $35.000 $19.000 $19.000
ELEC CONDR (NO.8) BARE
LF 2,945.000 $1.800 $1.050 $1.050
ELEC CONDR (NO.8) INSULATED
LF 5,890.000 $2.000 $1.050 $1.050
GROUND BOX TY A (122311)W/APRON
EA 10.000 $1,200.000 $895.000 $895.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 17.000 $700.000 $475.000 $630.000
RELOCATE SM RD SN SUP&AM TY S80
EA 2.000 $450.000 $550.000 $630.000
REMOVE SM RD SN SUP&AM
EA 2.000 $120.000 $95.500 $105.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 10.000 $140.000 $71.250 $95.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 10.000 $15.000 $30.000 $21.000
WK ZN PAV MRK REMOV (REFL) TY I-C
EA 2,300.000 $3.500 $3.160 $3.150
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 2,300.000 $3.300 $3.160 $3.150
WK ZN PAV MRK REMOV (TRAF BTN) TY W
EA 7,360.000 $2.500 $3.160 $3.150
WK ZN PAV MRK REMOV (TRAF BTN) TY W
LF 3,866.000 $2.500 $0.950 $0.950
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
EA 7,360.000 $2.500 $3.160 $3.150
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
LF 1,680.000 $2.500 $0.950 $0.950
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 4,180.000 $1.000 $0.840 $0.840
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 124.000 $5.000 $6.320 $6.300
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 10.000 $115.000 $110.650 $110.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 11.000 $160.000 $237.100 $235.000
PAVEMENT SEALER 4"
LF 38,473.000 $0.100 $0.260 $0.260
PAVEMENT SEALER 8"
LF 4,180.000 $0.300 $0.530 $0.530
PAVEMENT SEALER 24"
LF 124.000 $3.500 $1.580 $1.600
PAVEMENT SEALER (ARROW)
EA 10.000 $50.000 $10.550 $10.500
PAVEMENT SEALER (WORD)
EA 11.000 $40.000 $15.800 $16.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 7,432.000 $0.400 $0.420 $0.420
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 22,996.000 $0.400 $0.420 $0.420
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 6,773.000 $0.400 $0.420 $0.420
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 26,861.000 $0.400 $0.420 $0.420
PLOWABLE REFL PAV MRKR TY II-A-A
EA 24.000 $67.000 $63.250 $63.000
PLOWABLE REFL PAV MRKR TY II-C-R
EA 6.000 $80.000 $63.250 $63.000
ELIM EXT PAV MRK & MRKS (4")
LF 55,312.000 $0.400 $1.050 $1.050
ELIM EXT PAV MRK & MRKS (8")
LF 730.000 $1.100 $2.110 $2.100
ELIM EXT PAV MRK & MRKS (24")
LF 76.000 $15.000 $6.320 $6.300
ELIM EXT PAV MRK & MRKS (ARROW)
EA 6.000 $50.000 $52.700 $52.500
ELIM EXT PAV MRK & MRKS (WORD)
EA 9.000 $90.000 $79.000 $79.000
PAV SURF PREP FOR MRK (4")
LF 29,066.000 $0.750 $0.790 $0.790
PAV SURF PREP FOR MRK (8")
LF 4,050.000 $1.500 $1.580 $1.600
PAV SURF PREP FOR MRK (24")
LF 48.000 $6.000 $4.740 $4.750
PAV SURF PREP FOR MRK (ARROW)
EA 6.000 $40.000 $39.000 $39.000
PAV SURF PREP FOR MRK (WORD)
EA 3.000 $55.000 $64.300 $64.000
REMOVE TRAFFIC SIGNAL
EA 4.000 $3,500.000 $1,580.000 $1,600.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $8,000.000 $22,300.000 $12,500.000
MODULAR GLARE SCREENS (FURN & INSTALL)
LF 2,400.000 $20.000 $14.000 $17.000
MODULAR GLARE SCREENS (REMOVE)
LF 2,400.000 $2.500 $2.000 $2.100
MODULAR GLARE SCREENS (MOVE)
LF 2,400.000 $5.000 $3.250 $6.850
TMA (STATIONARY)
DAY 60.000 $600.000 $420.000 $630.000
TMA (MOBILE OPERATION)
DAY 9.000 $600.000 $615.000 $840.000
SOLAR POWERED LED ROADSIDE SIGN
EA 2.000 $5,250.000 $5,800.000 $5,800.000
Totals: $7,155,198.100 $7,991,425.560 $8,765,221.260