PREPARING ROW (TREE) (36" TO 48" DIA)
|
EA
|
1.000
|
$1,800.000
|
$2,300.000
|
$4,200.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
629.000
|
$7.500
|
$30.000
|
$22.500
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
7.200
|
$20.000
|
$148.000
|
$42.000
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
89.000
|
$20.000
|
$13.500
|
$23.500
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
76.000
|
$25.000
|
$31.000
|
$42.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
4,036.000
|
$3.500
|
$3.000
|
$7.350
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
175.000
|
$25.000
|
$4.000
|
$8.500
|
|
|
REMOVING CONC (WHEELCHAIR RAMP)
|
SY
|
17.000
|
$27.000
|
$33.500
|
$42.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (2")
|
SY
|
531.000
|
$15.000
|
$13.000
|
$12.000
|
|
|
REMOVING STAB BASE & ASPH PAV (9")
|
SY
|
7,094.000
|
$7.100
|
$6.000
|
$7.600
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
28,767.000
|
$9.500
|
$9.500
|
$15.500
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
2,419.100
|
$15.000
|
$9.100
|
$18.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
1,258.600
|
$20.000
|
$18.000
|
$15.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
2,394.000
|
$20.000
|
$20.000
|
$9.750
|
|
|
BLADING
|
HR
|
17.000
|
$150.000
|
$350.000
|
$375.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
AC
|
28.000
|
$450.000
|
$315.000
|
$315.000
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
AC
|
14.000
|
$450.000
|
$210.000
|
$210.000
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
AC
|
14.000
|
$450.000
|
$280.000
|
$280.000
|
|
|
VEGETATIVE WATERING
|
MG
|
1,092.000
|
$22.000
|
$20.000
|
$31.500
|
|
|
PROOF ROLLING
|
HR
|
37.000
|
$135.000
|
$240.000
|
$155.000
|
|
|
REWORK BS MTL (TY B)(12")(DENS CONT)
|
SY
|
3,659.000
|
$14.000
|
$5.950
|
$11.500
|
|
|
CEMENT
|
TON
|
563.170
|
$160.000
|
$160.000
|
$165.000
|
|
|
CEMENT TREAT (EXIST MATL) (6")
|
SY
|
51,937.000
|
$2.500
|
$2.300
|
$3.250
|
|
|
CEMENT TREAT (SUBGRADE)(9")
|
SY
|
6,233.000
|
$5.500
|
$5.000
|
$6.050
|
|
|
CEMENT TREAT (EXIST MATL)(DC)(6")
|
SY
|
1,392.000
|
$5.000
|
$8.350
|
$13.500
|
|
|
PRIME COAT (MC-30)
|
GAL
|
12,561.000
|
$3.500
|
$3.450
|
$4.500
|
|
|
EMULS ASPH (EROSN CONT)(CSS-1H)
|
GAL
|
25,066.000
|
$2.500
|
$3.200
|
$3.200
|
|
|
D-GR HMA(SQ) TY-B PG70-22
|
TON
|
2,743.000
|
$115.000
|
$93.000
|
$130.000
|
|
|
D-GR HMA(SQ) TY-D SAC-A PG70-28
|
TON
|
7,682.000
|
$115.000
|
$102.000
|
$125.000
|
|
|
PLANE ASPH CONC PAV (8")
|
SY
|
6,233.000
|
$2.650
|
$5.250
|
$5.400
|
|
|
PLANE ASPH CONC PAV (3")
|
SY
|
7,094.000
|
$2.400
|
$2.300
|
$2.950
|
|
|
PLANE ASPH CONC PAV (5")
|
SY
|
55,247.000
|
$2.250
|
$2.800
|
$3.450
|
|
|
CONC PVMT (CONT REINF - CRCP) (10")
|
SY
|
1,392.000
|
$60.000
|
$97.300
|
$145.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (11")
|
SY
|
51,937.000
|
$60.000
|
$71.350
|
$68.750
|
|
|
FLOWABLE BACKFILL
|
CY
|
7.000
|
$410.000
|
$265.000
|
$265.000
|
|
|
DRILL SHAFT (30 IN)
|
LF
|
96.000
|
$250.000
|
$342.500
|
$340.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
140.000
|
$650.000
|
$527.000
|
$525.000
|
|
|
CMP (GAL STL 12 IN)
|
LF
|
1,100.000
|
$32.000
|
$52.700
|
$52.500
|
|
|
CMP 36" SPECIAL,CLASS 1(SHAPE 1)GUAGE 8
|
LF
|
80.000
|
$120.000
|
$60.000
|
$265.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
|
LF
|
3.000
|
$350.000
|
$475.000
|
$475.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
|
LF
|
6.000
|
$460.000
|
$555.000
|
$555.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
|
LF
|
12.000
|
$500.000
|
$790.000
|
$790.000
|
|
|
WINGWALL (PW - 1) (HW=3 FT)
|
EA
|
2.000
|
$6,000.000
|
$10,550.000
|
$10,500.000
|
|
|
WINGWALL (PW - 1) (HW=4 FT)
|
EA
|
1.000
|
$9,275.000
|
$20,550.000
|
$20,500.000
|
|
|
SET (TY II) (12 IN) (CMP) (6: 1) (P)
|
EA
|
2.000
|
$850.000
|
$1,320.000
|
$1,300.000
|
|
|
SET (TY II) (36 IN) (CMP) (4: 1) (C)
|
EA
|
4.000
|
$2,000.000
|
$4,750.000
|
$4,700.000
|
|
|
JAC BOR OR TUN 36" CMP SPECIAL
|
LF
|
80.000
|
$1,100.000
|
$655.000
|
$1,100.000
|
|
|
REMOV STR (PIPE)
|
LF
|
1,150.000
|
$25.000
|
$24.100
|
$16.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$501,917.000
|
$790,000.000
|
$790,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
9.000
|
$7,500.000
|
$15,000.000
|
$29,500.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
500.000
|
$35.000
|
$42.100
|
$42.500
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,000.000
|
$12.000
|
$6.100
|
$8.550
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
1,000.000
|
$4.500
|
$7.650
|
$6.350
|
|
|
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
|
LF
|
2,400.000
|
$15.000
|
$12.550
|
$16.500
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
2,400.000
|
$12.000
|
$7.050
|
$7.950
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
2,400.000
|
$10.000
|
$12.550
|
$15.000
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
1,236.000
|
$8.800
|
$7.350
|
$4.550
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
208.000
|
$45.000
|
$35.100
|
$37.000
|
|
|
INTERSECTIONS (CONC)
|
SY
|
1,564.000
|
$90.000
|
$80.000
|
$95.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
385.000
|
$90.000
|
$95.650
|
$92.500
|
|
|
CONC SIDEWALKS (4")
|
SY
|
119.000
|
$90.000
|
$84.350
|
$68.500
|
|
|
CRASH CUSH ATTEN (DES SOURCE)
|
EA
|
2.000
|
$3,000.000
|
$4,215.000
|
$3,200.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$2,400.000
|
$2,100.000
|
$2,600.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,000.000
|
$2,100.000
|
$1,100.000
|
|
|
RELOCATE RD IL ASM (TRANS-BASE)
|
EA
|
12.000
|
$650.000
|
$527.000
|
$525.000
|
|
|
REPLACE LUMINAIRE W/LED (400W EQ)
|
EA
|
26.000
|
$1,100.000
|
$1,055.000
|
$1,100.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
2,615.000
|
$7.500
|
$6.600
|
$6.600
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
330.000
|
$35.000
|
$19.000
|
$19.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
2,945.000
|
$1.800
|
$1.050
|
$1.050
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
5,890.000
|
$2.000
|
$1.050
|
$1.050
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
10.000
|
$1,200.000
|
$895.000
|
$895.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
17.000
|
$700.000
|
$475.000
|
$630.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
2.000
|
$450.000
|
$550.000
|
$630.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
2.000
|
$120.000
|
$95.500
|
$105.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
10.000
|
$140.000
|
$71.250
|
$95.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
10.000
|
$15.000
|
$30.000
|
$21.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
EA
|
2,300.000
|
$3.500
|
$3.160
|
$3.150
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
2,300.000
|
$3.300
|
$3.160
|
$3.150
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
EA
|
7,360.000
|
$2.500
|
$3.160
|
$3.150
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
LF
|
3,866.000
|
$2.500
|
$0.950
|
$0.950
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
EA
|
7,360.000
|
$2.500
|
$3.160
|
$3.150
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
LF
|
1,680.000
|
$2.500
|
$0.950
|
$0.950
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
4,180.000
|
$1.000
|
$0.840
|
$0.840
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
124.000
|
$5.000
|
$6.320
|
$6.300
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
10.000
|
$115.000
|
$110.650
|
$110.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
11.000
|
$160.000
|
$237.100
|
$235.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
38,473.000
|
$0.100
|
$0.260
|
$0.260
|
|
|
PAVEMENT SEALER 8"
|
LF
|
4,180.000
|
$0.300
|
$0.530
|
$0.530
|
|
|
PAVEMENT SEALER 24"
|
LF
|
124.000
|
$3.500
|
$1.580
|
$1.600
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
10.000
|
$50.000
|
$10.550
|
$10.500
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
11.000
|
$40.000
|
$15.800
|
$16.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
7,432.000
|
$0.400
|
$0.420
|
$0.420
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
22,996.000
|
$0.400
|
$0.420
|
$0.420
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
6,773.000
|
$0.400
|
$0.420
|
$0.420
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
26,861.000
|
$0.400
|
$0.420
|
$0.420
|
|
PLOWABLE REFL PAV MRKR TY II-A-A
|
EA
|
24.000
|
$67.000
|
$63.250
|
$63.000
|
|
PLOWABLE REFL PAV MRKR TY II-C-R
|
EA
|
6.000
|
$80.000
|
$63.250
|
$63.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
55,312.000
|
$0.400
|
$1.050
|
$1.050
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
730.000
|
$1.100
|
$2.110
|
$2.100
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
76.000
|
$15.000
|
$6.320
|
$6.300
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
6.000
|
$50.000
|
$52.700
|
$52.500
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
9.000
|
$90.000
|
$79.000
|
$79.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
29,066.000
|
$0.750
|
$0.790
|
$0.790
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
4,050.000
|
$1.500
|
$1.580
|
$1.600
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
48.000
|
$6.000
|
$4.740
|
$4.750
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
6.000
|
$40.000
|
$39.000
|
$39.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
3.000
|
$55.000
|
$64.300
|
$64.000
|
|
|
REMOVE TRAFFIC SIGNAL
|
EA
|
4.000
|
$3,500.000
|
$1,580.000
|
$1,600.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$8,000.000
|
$22,300.000
|
$12,500.000
|
|
|
MODULAR GLARE SCREENS (FURN & INSTALL)
|
LF
|
2,400.000
|
$20.000
|
$14.000
|
$17.000
|
|
|
MODULAR GLARE SCREENS (REMOVE)
|
LF
|
2,400.000
|
$2.500
|
$2.000
|
$2.100
|
|
|
MODULAR GLARE SCREENS (MOVE)
|
LF
|
2,400.000
|
$5.000
|
$3.250
|
$6.850
|
|
|
TMA (STATIONARY)
|
DAY
|
60.000
|
$600.000
|
$420.000
|
$630.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
9.000
|
$600.000
|
$615.000
|
$840.000
|
|
|
SOLAR POWERED LED ROADSIDE SIGN
|
EA
|
2.000
|
$5,250.000
|
$5,800.000
|
$5,800.000
|
|
Totals: |
$7,155,198.100
|
$7,991,425.560
|
$8,765,221.260
|