PREPARING ROW
|
STA
|
1.500
|
$25,600.000
|
$80,000.000
|
$80,000.000
|
$375,000.000
|
|
|
REMOV CONC (PAV)
|
SY
|
984.000
|
$45.000
|
$80.000
|
$25.000
|
$94.960
|
|
|
REMOV CONC (DRIVEWAYS)
|
SY
|
75.000
|
$61.500
|
$200.000
|
$25.000
|
$102.180
|
|
|
REMOV CONC (SIDEWALK, RAMP OR SUP)
|
SY
|
181.000
|
$54.430
|
$150.000
|
$25.000
|
$102.710
|
|
|
REMOV CONC (CURB & GUTTER)
|
LF
|
300.000
|
$33.000
|
$40.000
|
$20.000
|
$61.850
|
|
|
EXCAV (ROADWAY)
|
CY
|
935.000
|
$43.300
|
$100.000
|
$30.000
|
$93.700
|
|
|
EXCAV (CHANNEL)
|
CY
|
1,443.000
|
$40.000
|
$80.000
|
$25.000
|
$93.700
|
|
|
EMBANK (FNL)(OC)(TY A)
|
CY
|
2.000
|
$70.200
|
$1,000.000
|
$150.000
|
$148.510
|
|
|
PROOF ROLLING
|
HR
|
1.000
|
$170.000
|
$20.000
|
$150.000
|
$742.550
|
|
|
CEMENT
|
TON
|
37.000
|
$312.500
|
$450.000
|
$500.000
|
$424.320
|
|
|
CEMENT TRT (SUBGRADE)(12")
|
SY
|
914.000
|
$10.750
|
$95.000
|
$45.000
|
$14.850
|
|
|
D-GR HMA TY-D PG 70-28 (EXEMPT)
|
TON
|
99.000
|
$133.000
|
$300.000
|
$400.000
|
$424.320
|
|
|
CONC PVMT (CRCP) (13")
|
SY
|
831.000
|
$120.000
|
$550.000
|
$250.000
|
$155.810
|
|
|
CEM STABIL BKFL
|
CY
|
457.000
|
$275.000
|
$300.000
|
$450.000
|
$608.540
|
|
|
TEMPORARY SPL SHORING
|
SF
|
4,970.000
|
$55.000
|
$80.000
|
$40.000
|
$67.010
|
|
|
DRILL SHAFT (30 IN)
|
LF
|
352.000
|
$243.000
|
$700.000
|
$800.000
|
$2,815.840
|
|
|
CL S CONC (CULV)
|
CY
|
369.000
|
$3,000.000
|
$1,070.000
|
$4,300.000
|
$2,049.970
|
|
|
BRIDGE SIDEWALK
|
SF
|
390.000
|
$55.000
|
$80.000
|
$20.000
|
$38.000
|
|
|
RETAINING WALL (SPREAD FOOTING)
|
SF
|
238.000
|
$125.000
|
$150.000
|
$165.000
|
$129.220
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
197.000
|
$800.000
|
$800.000
|
$800.000
|
$1,074.030
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
17.000
|
$857.000
|
$800.000
|
$800.000
|
$1,520.470
|
|
|
RAIL (TY C411)
|
LF
|
100.000
|
$285.000
|
$800.000
|
$450.000
|
$408.160
|
|
|
RAIL (HANDRAIL)(TY B)
|
LF
|
55.000
|
$217.000
|
$800.000
|
$200.000
|
$308.590
|
|
|
TYPE A JOINT
|
LF
|
154.000
|
$89.500
|
$150.000
|
$50.000
|
$56.580
|
|
|
WINGWALL (PW - 1) (HW=10 FT)
|
EA
|
1.000
|
$82,000.000
|
$80,000.000
|
$65,000.000
|
$114,547.690
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
1.000
|
$150,000.000
|
$530,000.000
|
$250,000.000
|
$162,654.740
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$207,464.000
|
$360,000.000
|
$400,000.000
|
$507,525.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
19.000
|
$9,000.000
|
$18,000.000
|
$9,000.000
|
$9,054.840
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$15,900.000
|
$40,000.000
|
$18,000.000
|
$40,310.090
|
|
|
TMA (STATIONARY)
|
DAY
|
30.000
|
$350.000
|
$300.000
|
$350.000
|
$506.820
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
50.000
|
$97.000
|
$50.000
|
$65.000
|
$353.600
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 4)
|
LF
|
22.000
|
$58.650
|
$1.000
|
$95.000
|
$282.880
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
22.000
|
$22.000
|
$1.000
|
$20.000
|
$70.720
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
312.000
|
$5.400
|
$1.000
|
$10.000
|
$8.490
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
312.000
|
$1.900
|
$1.000
|
$2.000
|
$2.830
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
40.000
|
$8.900
|
$1.000
|
$20.000
|
$141.440
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
40.000
|
$3.750
|
$1.000
|
$2.000
|
$28.290
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
580.000
|
$94.000
|
$100.000
|
$125.000
|
$77.790
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$109.000
|
$100.000
|
$125.000
|
$77.790
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
660.000
|
$35.000
|
$50.000
|
$20.000
|
$41.020
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$30.000
|
$50.000
|
$20.000
|
$41.020
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
580.000
|
$35.000
|
$40.000
|
$15.000
|
$77.790
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$30.000
|
$40.000
|
$15.000
|
$77.790
|
|
|
COLORED TEXTURED CONC (4")
|
SY
|
15.000
|
$163.820
|
$80.000
|
$250.000
|
$242.800
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
249.000
|
$60.000
|
$90.000
|
$65.000
|
$86.240
|
|
|
CONC CURB (TY F1)
|
LF
|
55.000
|
$100.000
|
$90.000
|
$250.000
|
$249.290
|
|
|
DRIVEWAYS (CONC)
|
SY
|
63.000
|
$162.000
|
$90.000
|
$150.000
|
$172.800
|
|
|
CONC SIDEWALKS (4")
|
SY
|
125.000
|
$175.000
|
$90.000
|
$130.000
|
$161.200
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
381.000
|
$35.000
|
$45.000
|
$50.000
|
$84.860
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
225.000
|
$21.390
|
$30.000
|
$35.000
|
$28.640
|
|
|
GROUND BOX TY A (122311)
|
EA
|
4.000
|
$1,100.000
|
$10,000.000
|
$500.000
|
$1,859.040
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
1.000
|
$871.000
|
$2,000.000
|
$1,500.000
|
$1,606.140
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
1.000
|
$922.000
|
$2,000.000
|
$1,500.000
|
$1,842.570
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
800.000
|
$0.400
|
$1.200
|
$1.200
|
$1.560
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
2,897.000
|
$0.400
|
$1.200
|
$1.200
|
$1.560
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
15,794.000
|
$0.500
|
$1.200
|
$1.200
|
$1.560
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
160.000
|
$1.950
|
$2.500
|
$3.000
|
$3.250
|
|
ALL-WTHER PM TY I (W)6"(SLD)(100MIL)
|
LF
|
494.000
|
$1.800
|
$2.500
|
$3.000
|
$2.970
|
|
ALL-WTHER PM TY I (W)6"(BRK)(100MIL)
|
LF
|
1,220.000
|
$2.200
|
$2.500
|
$3.000
|
$2.970
|
|
ALL-WTHER PM TY I (Y)6"(SLD)(100MIL)
|
LF
|
3,654.000
|
$1.350
|
$2.500
|
$3.000
|
$2.970
|
|
ALL-WTHER PM TY I (Y)6"(BRK)(100MIL)
|
LF
|
1,060.000
|
$1.700
|
$2.500
|
$3.000
|
$2.970
|
|
|
PAVEMENT SLER 6"
|
LF
|
6,428.000
|
$0.500
|
$1.000
|
$1.200
|
$1.410
|
|
|
PAVEMENT SLER 8"
|
LF
|
160.000
|
$0.500
|
$2.000
|
$2.500
|
$2.830
|
|
PREFAB PM TY C (W)(24")(SLD)
|
LF
|
184.000
|
$2.500
|
$20.000
|
$22.000
|
$24.750
|
|
PREFAB PM TY C (W)(ARROW)
|
EA
|
4.000
|
$352.000
|
$300.000
|
$400.000
|
$424.320
|
|
PREFAB PM TY C (W)(WORD)
|
EA
|
2.000
|
$435.000
|
$400.000
|
$500.000
|
$565.760
|
|
REFL PAV MRKR TY I-C
|
EA
|
57.000
|
$8.100
|
$10.000
|
$12.000
|
$14.140
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
88.000
|
$11.000
|
$10.000
|
$12.000
|
$14.140
|
|
|
ELIM EXT PM & MRKS (4")
|
LF
|
27,288.000
|
$1.250
|
$1.000
|
$1.200
|
$1.200
|
|
|
ELIM EXT PM & MRKS (8")
|
LF
|
404.000
|
$2.200
|
$1.000
|
$1.200
|
$1.410
|
|
|
ELIM EXT PM & MRKS (24")
|
LF
|
70.000
|
$6.000
|
$5.000
|
$6.000
|
$7.070
|
|
|
ELIM EXT PM & MRKS (ARROW)
|
EA
|
4.000
|
$100.000
|
$125.000
|
$150.000
|
$176.800
|
|
|
ELIM EXT PM & MRKS (WORD)
|
EA
|
2.000
|
$109.000
|
$200.000
|
$230.000
|
$282.880
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
6,428.000
|
$0.660
|
$1.000
|
$1.200
|
$1.410
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
160.000
|
$0.560
|
$1.000
|
$1.200
|
$1.410
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
184.000
|
$22.000
|
$5.000
|
$6.000
|
$7.070
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
4.000
|
$80.000
|
$100.000
|
$120.000
|
$141.440
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
2.000
|
$98.000
|
$150.000
|
$200.000
|
$212.160
|
|
|
MANHOLE (SAN SWR)(4 FT DIA)
|
EA
|
1.000
|
$18,000.000
|
$15,000.000
|
$25,000.000
|
$35,359.730
|
|
|
SAN SWR (TELEVISION INSPECTION)
|
LF
|
125.000
|
$40.000
|
$160.000
|
$150.000
|
$282.880
|
|
|
BYPASS PUMPING
|
LS
|
1.000
|
$18,500.000
|
$20,000.000
|
$20,000.000
|
$134,366.960
|
|
|
PIPE BURST SAN SWR (8” HDPE)
|
LF
|
125.000
|
$148.000
|
$400.000
|
$800.000
|
$1,414.390
|
|
Totals: |
$3,194,304.660
|
$4,458,100.200
|
$4,492,693.800
|
$5,672,082.200
|