Show Job Controls
Bid Cobra

DIMMIT FM 2688 (2660-01-011)

Items: 79

County: DIMMIT
Length: N/A
Highway: FM 2688
District: LAREDO
Control Number: 2660-01-011
DBE Goal: N/A
Project: C 2660-1-11
Guaranty: N/A
Time: 305 WORKING DAYS
Engineer's Estimate: $11,357,045.23
Date: 07/01/2021 (4 years ago)
Contract Number: N/A
Type: BASE, ACP, GRAD, STR, PAV MRKS, SIGNS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (5)
E
Engineer's Estimate
$11,357,045.23
$10,393,728.82
Over/Under Est: -8.48% -$963,316.41
Over/Under Est: -5.83% -$662,512.33
Amt Left: 2.89% $300,804.08
$10,993,445.40
Over/Under Est: -3.2% -$363,599.83
Amt Left: 5.77% $599,716.58
Delta: -2.80% -$298,912.50
$11,116,335.23
Over/Under Est: -2.12% -$240,710.00
Amt Left: 6.95% $722,606.41
Delta: -1.12% -$122,889.83
$11,964,162.34
Over/Under Est: 5.35% $607,117.11
Amt Left: 15.11% $1,570,433.52
Delta: -7.63% -$847,827.11

Bid Items & Bid Tabulations

79 Total 0 of 79
DIMMIT  |  FM 2688  |  LAREDO  |  2660-01-011  |  07/01/2021  |  $11,357,045.23  |  C 2660-1-11  |  BASE, ACP, GRAD, STR, PAV MRKS, SIGN...  |  305 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ANDERSON COLUMBIA CO., INC.
ANGEL BROTHERS HOLDINGS CORP.
CK NEWBERRY, LLC
HUNTER INDUSTRIES, LTD.
FARIS INDUSTRIES, INC.
PREPARING ROW
STA 230.000 $1,500.000 $350.000 $500.000 $225.000 $566.280 $910.780
REMOVING CONC (RIPRAP)
SY 113.000 $9.000 $8.000 $18.000 $15.000 $16.650 $8.680
REMOVING CONC (DRIVEWAYS)
SY 1,602.000 $14.000 $14.000 $17.000 $10.000 $17.790 $8.680
REMOVING STAB BASE AND ASPH PAV(15")
SY 66,252.000 $8.000 $4.200 $7.500 $5.750 $5.920 $7.100
EXCAVATION (ROADWAY)
CY 19,705.000 $10.000 $11.000 $10.250 $11.000 $11.130 $11.940
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 12,320.000 $11.000 $14.000 $8.500 $10.500 $11.130 $12.670
BACKFILL (TY A OR B)
STA 230.000 $155.000 $100.000 $250.000 $75.000 $94.650 $75.950
DRILL SEEDING (PERM)(WARM OR COOL)
SY 122,306.000 $1.000 $0.180 $0.160 $0.150 $0.210 $0.150
PROOF ROLLING
HR 100.000 $90.000 $86.000 $80.000 $50.000 $79.800 $65.100
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 41,128.000 $70.000 $65.000 $65.000 $65.000 $59.010 $66.490
PRIME COAT (RC-250)
GAL 17,344.000 $4.000 $4.000 $4.000 $4.000 $3.950 $3.990
AGGR (TY-PE OR PL)(GR-5)(SAC-B)
CY 626.000 $130.000 $120.000 $100.000 $115.000 $82.560 $85.890
CEM STABIL BKFL
CY 338.000 $89.000 $65.000 $175.000 $125.000 $200.000 $215.000
TRENCH EXCAVATION PROTECTION
LF 120.000 $5.000 $40.000 $20.000 $10.000 $12.500 $15.000
RIPRAP (CONC)(5 IN)
CY 311.000 $455.000 $450.000 $470.000 $400.000 $400.000 $736.400
CONC BOX CULV (7 FT X 3 FT)
LF 150.000 $449.000 $500.000 $600.000 $475.000 $600.000 $868.000
RC PIPE (CL III)(24 IN)
LF 1,429.000 $70.000 $50.000 $80.000 $52.000 $70.000 $82.000
RC PIPE (CL IV)(30 IN)
LF 1,052.000 $107.000 $80.000 $120.000 $90.000 $150.000 $125.000
RC PIPE (CL IV)(36 IN)
LF 174.000 $134.000 $110.000 $160.000 $120.000 $170.000 $151.620
RC PIPE (CL V)(24 IN)
LF 304.000 $92.000 $65.000 $105.000 $75.000 $190.000 $109.060
HEADWALL (CH - PW - 0) (DIA= 30 IN)
EA 7.000 $5,911.000 $7,000.000 $6,700.000 $10,500.000 $11,000.000 $9,940.000
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 2.000 $6,500.000 $7,500.000 $7,150.000 $12,500.000 $12,000.000 $9,940.000
WINGWALL (PW - 2) (HW=4 FT)
EA 1.000 $10,000.000 $10,000.000 $9,650.000 $14,000.000 $10,000.000 $10,045.000
WINGWALL (SW - 0) (HW=4 FT)
EA 1.000 $8,500.000 $9,000.000 $10,700.000 $13,500.000 $11,000.000 $8,365.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 6.000 $984.000 $1,200.000 $1,450.000 $1,550.000 $1,900.000 $1,435.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 6.000 $1,338.000 $1,400.000 $1,600.000 $1,750.000 $2,200.000 $1,435.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 50.000 $1,200.000 $1,400.000 $1,675.000 $1,750.000 $3,000.000 $1,435.000
SET (TY II) (30 IN) (RCP) (3: 1) (C)
EA 2.000 $1,507.000 $1,700.000 $1,825.000 $2,600.000 $2,400.000 $1,568.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 14.000 $1,875.000 $1,800.000 $1,850.000 $2,200.000 $2,800.000 $1,568.000
JACK BOR OR TUN PIPE(30 IN)(RC)(CL III)
LF 160.000 $762.000 $1,000.000 $500.000 $250.000 $1,200.000 $448.000
REMOV STR (SET)
EA 46.000 $496.000 $55.000 $750.000 $500.000 $350.000 $950.000
REMOV STR (PIPE)
LF 1,086.000 $9.000 $9.000 $14.000 $10.000 $20.000 $8.000
REMOV STR (PIPE)
EA 22.000 $380.000 $300.000 $1,375.000 $500.000 $1,000.000 $950.000
REMOVE STR (CONC)
EA 2.000 $177.000 $1,600.000 $950.000 $1,500.000 $1,500.000 $2,500.000
MOBILIZATION
LS 1.000 $729,291.740 $585,000.000 $725,000.000 $525,000.000 $983,069.920 $1,316,065.730
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 16.000 $2,500.000 $1,500.000 $10,000.000 $3,000.000 $2,939.050 $2,171.460
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 150.000 $41.000 $28.000 $40.000 $40.000 $28.000 $47.020
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 20.000 $50.000 $85.000 $55.000 $55.000 $85.000 $129.870
ROCK FILTER DAMS (REMOVE)
LF 170.000 $17.000 $15.000 $20.000 $17.000 $15.000 $16.870
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 134.000 $18.000 $20.000 $38.000 $15.000 $20.000 $50.320
CONSTRUCTION EXITS (REMOVE)
SY 134.000 $6.000 $2.000 $10.000 $5.000 $2.000 $12.330
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,688.000 $3.000 $2.500 $3.750 $2.000 $2.250 $4.100
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,688.000 $2.000 $1.000 $0.750 $1.000 $1.000 $0.630
CONSTRUCTING DETOURS
SY 12,258.000 $57.000 $38.000 $43.250 $50.000 $36.200 $52.040
ONE-WAY TRAF CONT (PILOT CAR)
HR 250.000 $80.000 $130.000 $90.000 $100.000 $102.600 $86.800
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 16.000 $6,000.000 $5,500.000 $750.000 $2,250.000 $2,220.560 $2,400.000
PTB (FRN&INSTL)(SGL SLP)(TY 1) OR (STL)
LF 11,850.000 $26.000 $30.000 $30.000 $41.500 $44.100 $49.000
PTB (MOVE)(SGL SLP)(TY 1) OR (STL)
LF 41,430.000 $5.000 $5.000 $4.000 $6.750 $8.690 $5.000
PTB (REMOVE)(SGL SLP)(TY 1) OR (STL)
LF 11,850.000 $15.000 $12.000 $10.000 $4.000 $18.160 $16.000
DRIVEWAYS (CONC)
SY 1,602.000 $77.000 $95.000 $104.000 $130.000 $90.000 $83.680
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 45,864.000 $0.250 $0.140 $0.300 $0.200 $0.180 $0.140
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 22,932.000 $0.350 $0.140 $0.450 $0.200 $0.160 $0.140
CRASH CUSH ATTEN (MOVE & RESET)
EA 62.000 $800.000 $625.000 $1,500.000 $750.000 $1,450.000 $500.000
CRASH CUSH ATTEN (REMOVE)
EA 26.000 $632.000 $525.000 $1,200.000 $550.000 $850.000 $300.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 26.000 $7,327.000 $7,500.000 $4,000.000 $8,000.000 $6,000.000 $6,500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 9.000 $526.000 $675.000 $550.000 $750.000 $675.000 $675.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 3.000 $710.000 $950.000 $705.000 $1,000.000 $950.000 $950.000
REMOVE SM RD SN SUP&AM
EA 8.000 $73.000 $80.000 $92.000 $100.000 $80.000 $80.000
RELOCATE SM RD SN SUP & AM TY TEMP
EA 12.000 $91.000 $125.000 $375.000 $150.000 $125.000 $125.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 32.000 $80.000 $85.000 $72.000 $90.000 $85.000 $85.000
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 1,200.000 $3.000 $4.000 $4.000 $4.500 $4.000 $4.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 178,000.000 $0.700 $0.500 $0.420 $0.500 $0.450 $0.450
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 66.000 $8.000 $14.000 $10.000 $15.000 $14.000 $14.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 21,000.000 $0.660 $0.500 $0.540 $0.500 $0.480 $0.480
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 9,200.000 $1.450 $1.500 $0.800 $1.000 $1.410 $1.100
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 45,864.000 $0.400 $0.500 $0.380 $0.550 $0.480 $0.480
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 5,733.000 $0.380 $0.500 $0.400 $0.550 $0.500 $0.500
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 6,569.000 $0.350 $0.500 $0.400 $0.550 $0.500 $0.500
REFL PAV MRKR TY II-A-A
EA 375.000 $3.000 $4.000 $4.000 $4.500 $4.000 $4.000
ELIM EXT PAV MRK & MRKS (4")
LF 91,999.000 $0.500 $0.500 $0.530 $1.000 $0.500 $0.500
ELIM EXT PV MRK & MRKS (RUMBLE STRIP)
LF 1,280.000 $9.000 $2.000 $3.000 $2.250 $2.000 $2.000
SP MIXES SP-B SAC-B PG70-22
TON 25,621.000 $78.500 $82.000 $79.000 $95.000 $77.960 $79.770
SP MIXES SP-C SAC-A PG76-22
TON 9,707.000 $94.000 $110.000 $103.000 $110.000 $92.790 $102.020
BONDING COURSE
GAL 5,901.000 $4.000 $3.400 $3.000 $3.000 $3.060 $2.720
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $8,000.000 $17,000.000 $10,000.000 $10,000.000 $7,572.400 $25,000.000
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 1,280.000 $15.000 $10.000 $14.000 $11.000 $10.000 $10.000
TMA (STATIONARY)
DAY 150.000 $265.000 $175.000 $200.000 $250.000 $302.900 $150.000
TMA (MOBILE OPERATION)
HR 100.000 $70.000 $60.000 $100.000 $25.000 $100.970 $40.000
DRIVEWAY ASSISTANCE DEVICE SYSTEM
MO 16.000 $5,300.000 $5,500.000 $750.000 $5,000.000 $5,273.820 $3,800.000
Totals: $11,357,045.230 $10,393,728.820 $10,694,532.900 $10,993,445.400 $11,116,335.230 $11,964,162.340