DIMMIT FM 186 (0301-04-020)

Items: 114

County: DIMMIT
Length: N/A
Highway: FM 186
District: LAREDO
Control Number: 0301-04-020
DBE Goal: N/A
Project: C 301-4-20
Guaranty: N/A
Time: 200 WORKING DAYS
Engineer's Estimate: $13,823,743.42
Date: 08/07/2018 (7 years ago)
Contract Number: N/A
Type: BASE, ACP, GRAD, STR, PAV MRK
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$13,823,743.42
$12,607,041.21
Over/Under Est: -8.8% -$1,216,702.21
Over/Under Est: -8.28% -$1,145,201.32
Amt Left: 0.57% $71,500.89
$13,170,572.74
Over/Under Est: -4.72% -$653,170.68
Amt Left: 4.47% $563,531.53
Delta: -3.88% -$492,030.64
$13,605,656.63
Over/Under Est: -1.58% -$218,086.79
Amt Left: 7.92% $998,615.42
Delta: -3.30% -$435,083.89
Over/Under Est: -1.34% -$185,589.74
Amt Left: 8.18% $1,031,112.47
Delta: -0.24% -$32,497.05

Bid Items & Bid Tabulations

114 Total 0 of 114
DIMMIT  |  FM 186  |  LAREDO  |  0301-04-020  |  08/07/2018  |  $13,823,743.42  |  C 301-4-20  |  BASE, ACP, GRAD, STR, PAV MRK  |  200 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
J. CARROLL WEAVER, INC.
ANDERSON COLUMBIA CO., INC.
HUNTER INDUSTRIES, LTD.
RAY FARIS, INC.
ANGEL BROTHERS HOLDINGS CORP.
PREPARING ROW
STA 458.000 $580.460 $165.000 $250.000 $333.750 $387.900 $200.000
REMOVING STAB BASE & ASPH PAV (0-2")
SY 719.000 $1.540 $5.500 $2.000 $2.560 $4.000 $6.000
EXCAVATION (ROADWAY)
CY 51,602.000 $8.500 $8.580 $17.000 $11.220 $12.290 $8.000
EMBANKMENT (FINAL)(DENS CONT)(TY A)
CY 23,839.000 $2.900 $5.010 $9.000 $7.800 $10.220 $5.000
FURNISHING AND PLACING TOPSOIL (4")
SY 153,083.000 $0.750 $1.310 $1.200 $0.990 $1.360 $0.900
DRILL SEEDING (TEMP) (WARM)
SY 153,083.000 $0.190 $0.100 $0.100 $0.150 $0.150 $0.150
CEM TRT(PLNT MX) (CL N)(TYE)(GR 4)(12")
SY 178,103.000 $25.000 $20.930 $22.000 $23.360 $21.950 $26.000
SALV, HAUL & STKPL RCL APH PV (2 TO 4")
SY 145,292.000 $1.960 $2.230 $1.000 $1.710 $1.480 $2.250
ASPH (RC-250)
GAL 35,621.000 $2.800 $3.720 $4.000 $5.110 $4.390 $3.650
AGGR(TY-PB GR-5 SAC-B)
CY 1,370.000 $80.000 $64.860 $100.000 $92.230 $76.050 $75.000
SUPERPAVE MIXTURES SP-C SAC-A PG76-22
TON 17,912.000 $92.000 $105.600 $96.000 $93.660 $96.000 $105.000
SUPERPAVE MIXTURES SP- B SAC-B PG70-22
TON 27,708.000 $90.000 $82.500 $75.000 $78.960 $75.000 $83.000
CEM STABIL BKFL
CY 626.000 $95.000 $183.100 $163.000 $172.000 $100.000 $80.000
CUT & RESTORE ASPH PAVING
SY 733.000 $93.620 $27.500 $57.000 $100.000 $150.000 $85.000
TRENCH EXCAVATION PROTECTION
LF 483.000 $11.600 $8.050 $8.000 $15.000 $12.000 $10.000
TEMPORARY SPL SHORING
SF 1,188.000 $36.000 $16.610 $15.000 $28.000 $45.000 $22.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 32.000 $185.000 $440.000 $225.000 $225.000 $225.000 $240.000
RIPRAP (CONC)(5 IN)
CY 207.000 $442.140 $410.590 $366.000 $440.000 $550.000 $455.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 542.000 $96.540 $135.220 $121.000 $128.790 $225.000 $125.000
RIPRAP (MOW STRIP)(4 IN)
CY 107.300 $441.950 $503.430 $449.000 $490.000 $550.000 $550.000
CMP (GAL STL 18 IN)
LF 704.000 $64.760 $51.770 $47.000 $70.000 $43.000 $55.000
CMP (GAL STL 24 IN)
LF 179.000 $79.300 $56.250 $51.000 $81.000 $60.000 $75.000
CONC BOX CULV (5 FT X 2 FT)
LF 174.000 $313.230 $289.960 $258.000 $350.000 $375.000 $350.000
CONC BOX CULV (5 FT X 3 FT)
LF 144.000 $315.120 $310.440 $276.000 $360.000 $390.000 $360.000
CONC BOX CULV (6 FT X 3 FT)
LF 96.000 $265.440 $365.670 $325.000 $450.000 $450.000 $435.000
CONC BOX CULV (8 FT X 4 FT)
LF 106.000 $313.200 $711.150 $632.000 $610.000 $650.000 $600.000
CONC BOX CULV (8 FT X 8 FT)
LF 116.000 $638.380 $702.320 $624.000 $800.000 $850.000 $750.000
CONC BOX CULV (10 FT X 7 FT)(EXTEND)
LF 132.000 $535.470 $1,533.510 $1,367.000 $1,010.000 $1,000.000 $3,000.000
RC PIPE (CL V)(24 IN)
LF 514.000 $165.000 $63.140 $57.000 $91.000 $130.000 $120.000
RC PIPE (CL V)(36 IN)
LF 463.000 $161.490 $163.640 $146.000 $118.000 $250.000 $190.000
RC PIPE (CL V)(30 IN)
LF 398.000 $145.530 $121.130 $108.000 $160.000 $200.000 $150.000
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 6.000 $7,100.200 $9,908.170 $8,832.000 $2,600.000 $4,000.000 $6,000.000
HEADWALL (CH - PW - 0) (DIA= 30 IN)
EA 4.000 $5,152.310 $10,302.600 $9,200.000 $3,700.000 $5,500.000 $8,000.000
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 7.000 $5,998.440 $12,232.810 $10,900.000 $5,400.000 $7,500.000 $12,000.000
WINGWALL (FW - S) (HW=9 FT)
EA 2.000 $25,650.000 $56,210.320 $50,100.000 $32,000.000 $34,000.000 $40,000.000
WINGWALL (PW - 1) (HW=3 FT)
EA 2.000 $4,838.270 $11,516.760 $10,700.000 $4,700.000 $5,000.000 $4,600.000
WINGWALL (PW - 1) (HW=4 FT)
EA 2.000 $17,116.110 $10,789.550 $10,000.000 $7,200.000 $7,500.000 $7,000.000
WINGWALL (PW - 1) (HW=5 FT)
EA 4.000 $11,007.540 $11,789.490 $11,000.000 $9,500.000 $9,000.000 $9,500.000
WINGWALL (PW - 1) (HW=9 FT)
EA 2.000 $25,127.120 $39,147.900 $36,600.000 $25,000.000 $26,000.000 $30,000.000
SET (TY II) (18 IN) (CMP) (6: 1) (P)
EA 26.000 $953.230 $1,268.360 $1,180.000 $1,600.000 $850.000 $1,200.000
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 8.000 $1,135.910 $1,323.850 $1,230.000 $1,900.000 $950.000 $1,500.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 8.000 $974.460 $1,381.410 $1,300.000 $1,300.000 $800.000 $1,500.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 4.000 $1,556.270 $1,443.990 $1,350.000 $1,700.000 $900.000 $1,600.000
SET (TY II) (30 IN) (RCP) (3: 1) (C)
EA 3.000 $1,275.900 $1,628.480 $1,500.000 $2,100.000 $2,000.000 $2,000.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 5.000 $1,732.660 $1,666.030 $1,560.000 $2,300.000 $2,500.000 $2,250.000
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 3.000 $2,446.730 $2,247.190 $2,100.000 $3,100.000 $3,000.000 $3,250.000
REMOV STR (BOX CULVERT)
EA 1.000 $7,713.130 $5,500.000 $5,200.000 $3,400.000 $5,500.000 $3,800.000
REMOV STR (HEADWALL)
EA 2.000 $1,428.110 $1,485.000 $1,400.000 $3,400.000 $2,000.000 $3,700.000
REMOV STR (PIPE)
EA 31.000 $409.080 $1,045.000 $1,000.000 $1,400.000 $850.000 $1,300.000
REMOV STR (SMALL FENCE)
LF 250.000 $3.500 $16.500 $3.000 $8.000 $4.000 $5.000
MOBILIZATION
LS 1.000 $1,428,772.800 $638,673.750 $595,000.000 $1,067,762.090 $1,462,659.360 $700,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $3,590.340 $3,850.000 $10,100.000 $5,961.160 $6,145.000 $2,500.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 2,780.000 $33.980 $35.010 $24.000 $22.500 $22.500 $20.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 255.000 $39.000 $39.840 $27.000 $26.250 $26.250 $25.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 255.000 $43.520 $124.010 $80.000 $76.600 $76.600 $60.000
ROCK FILTER DAMS (REMOVE)
LF 3,290.000 $12.890 $11.000 $7.000 $6.700 $6.700 $7.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 311.000 $25.400 $47.090 $20.000 $18.400 $18.400 $25.000
CONSTRUCTION EXITS (REMOVE)
SY 311.000 $8.420 $12.600 $7.000 $6.270 $6.270 $5.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 23,804.000 $1.970 $2.230 $2.500 $2.350 $2.350 $2.750
TEMP SEDMT CONT FENCE (REMOVE)
LF 23,804.000 $0.610 $0.830 $0.400 $0.350 $0.350 $0.450
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 1,100.000 $65.240 $28.020 $24.000 $20.000 $78.000 $40.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 300.000 $0.660 $14.330 $14.000 $9.000 $12.000 $6.500
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 1,100.000 $10.720 $28.020 $18.000 $13.000 $18.000 $15.000
DRIVEWAYS (SURF TREAT)
SY 639.000 $26.130 $16.500 $40.000 $21.900 $24.160 $45.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,350.000 $21.190 $25.300 $24.000 $23.060 $23.060 $24.000
MTL W-BEAM GD FEN (STEEL POST)
LF 150.000 $46.920 $55.000 $75.000 $72.000 $72.000 $48.000
SHORT RADIUS
LF 12.500 $29.670 $36.300 $32.000 $32.200 $32.200 $37.000
DRIVEWAY TERMINAL ANCHOR SECTION
EA 1.000 $851.630 $770.000 $780.000 $745.000 $745.000 $935.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 12.000 $988.270 $1,056.000 $1,030.000 $986.000 $986.000 $1,275.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 6.000 $700.000 $1,259.500 $1,250.000 $1,210.000 $1,210.000 $1,250.000
REMOVE METAL BEAM GUARD FENCE
LF 500.000 $1.060 $3.300 $1.000 $1.000 $1.000 $1.350
GUARDRAIL END TREATMENT (INSTALL)
EA 11.000 $2,222.610 $2,997.500 $2,700.000 $2,636.000 $2,636.000 $2,700.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $140.820 $330.000 $120.000 $114.000 $114.000 $105.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $618.130 $2,365.000 $4,000.000 $1,800.000 $1,800.000 $1,700.000
CRASH CUSH ATTEN (REMOVE)
EA 6.000 $390.520 $1,347.500 $520.000 $500.000 $500.000 $530.000
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
EA 6.000 $15,022.430 $4,713.990 $9,500.000 $7,000.000 $7,000.000 $16,000.000
WIRE FENCE (TY C)
LF 250.000 $20.000 $38.500 $17.000 $17.000 $17.000 $32.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 3.000 $230.000 $247.500 $280.000 $190.000 $190.000 $500.000
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 4.000 $2,664.800 $5,445.000 $4,200.000 $4,000.000 $4,000.000 $4,500.000
CONDT (PVC) (SCH 40) (2")
LF 550.000 $13.220 $33.000 $21.000 $20.000 $20.000 $21.000
CONDT (PVC) (SCH 40) (2") (BORE)
LF 55.000 $53.870 $110.000 $63.000 $60.000 $60.000 $65.000
TRAY CABLE (4 CONDR) (8 AWG)
LF 825.000 $1.750 $5.390 $6.000 $6.000 $6.000 $6.350
GROUND BOX TY C (162911)W/APRON
EA 3.000 $1,034.260 $1,760.000 $1,000.000 $950.000 $950.000 $1,000.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 12.000 $634.020 $616.000 $600.000 $510.000 $510.000 $750.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 16.000 $784.870 $797.500 $790.000 $620.000 $620.000 $765.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 2.000 $730.880 $946.000 $1,150.000 $660.000 $660.000 $800.000
RELOCATE SM RD SN SUP&AM TY S80
EA 20.000 $459.000 $616.000 $500.000 $405.000 $405.000 $500.000
REMOVE SM RD SN SUP&AM
EA 31.000 $74.890 $93.500 $210.000 $50.000 $50.000 $90.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 17.000 $77.810 $55.000 $75.000 $62.000 $62.000 $80.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 62.000 $26.510 $35.200 $31.000 $28.000 $28.000 $30.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 92,842.000 $0.310 $0.260 $0.250 $0.240 $0.240 $0.250
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 92,842.000 $0.310 $0.260 $0.250 $0.240 $0.240 $0.250
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 92,842.000 $0.290 $0.260 $0.250 $0.240 $0.240 $0.250
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 9,285.000 $3.190 $2.750 $3.000 $2.500 $2.500 $2.650
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 93,842.000 $0.700 $0.530 $0.500 $0.480 $0.480 $0.500
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 48.000 $6.060 $11.000 $11.000 $10.000 $10.000 $10.600
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 93,842.000 $0.710 $0.530 $0.500 $0.480 $0.480 $0.500
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 9,284.000 $0.370 $0.830 $1.500 $1.250 $1.290 $0.800
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 6,963.000 $1.190 $0.830 $1.500 $1.250 $1.290 $0.800
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 24.000 $6.690 $6.600 $11.000 $10.000 $10.000 $10.600
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 1.000 $51.970 $275.000 $260.000 $250.000 $250.000 $265.000
PAVEMENT SEALER 24"
LF 24.000 $1.960 $6.600 $6.000 $6.000 $6.000 $6.350
PAVEMENT SEALER (YLD TRI)
EA 1.000 $14.130 $110.000 $105.000 $100.000 $100.000 $106.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 93,776.000 $0.320 $0.400 $0.400 $0.360 $0.360 $0.380
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 8,440.000 $0.310 $0.400 $0.400 $0.360 $0.360 $0.380
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 42,930.000 $0.320 $0.400 $0.400 $0.360 $0.360 $0.380
REFL PAV MRKR TY II-A-A
EA 1,009.000 $2.750 $3.660 $3.500 $3.330 $3.330 $3.600
ELIM EXT PAV MRK & MRKS (4")
LF 2,000.000 $0.500 $1.100 $1.050 $1.000 $1.000 $1.050
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
EA 2.000 $5,322.380 $9,845.000 $10,500.000 $5,500.000 $5,500.000 $6,000.000
STEEL FENCE (REMOVE)
LF 200.000 $10.000 $11.000 $10.000 $15.000 $15.000 $16.000
STEEL FENCE (INSTALL)
LF 200.000 $160.000 $60.500 $52.000 $100.000 $230.000 $50.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $7,584.260 $10,450.000 $10,700.000 $7,036.250 $7,000.000 $8,000.000
TMA (STATIONARY)
DAY 224.000 $250.000 $60.500 $225.000 $270.620 $250.000 $200.000
TMA (MOBILE OPERATION)
HR 378.000 $45.000 $40.700 $24.000 $81.190 $37.000 $30.000
Totals: $13,823,743.420 $12,607,041.219 $12,678,542.100 $13,170,572.740 $13,605,656.630 $13,638,153.680