Job Info for 0132-01-055

County: DICKENS Highway: US 82 Date: 12/05/2023 (11 months ago) Engineer's Estimate: $9,731,074 Control Number: 0132-01-055
Project: C 132-1-55 District: CHILDRESS Time: 99 WORKING DAYS Type: OVERLAY
Bidder's List
Informational:
Email All | Notice
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $9,731,074.43
A. L. HELMCAMP, INC.   $11,319,017.73 1
16.32% | $1,587,943.30
DUININCK, INC.   $11,454,345.55 2
17.71% | $1,723,271.12
1.2% | $135,327.82
J. LEE MILLIGAN, INC.   $11,799,347.40 3
21.25% | $2,068,272.97
4.24% | $480,329.67
3.01% | $345,001.85
GILVIN-TERRILL, LTD.   $12,147,264.45 4
24.83% | $2,416,190.02
7.32% | $828,246.72
2.95% | $347,917.05
KIEWIT INFRASTRUCTURE SOUTH CO.   $12,702,579.20 5
30.54% | $2,971,504.77
12.22% | $1,383,561.47
4.57% | $555,314.75
Subcontractor Percentage Amount
W. S. CONSTRUCTION COMPANY 1.90% $215,061.34
DUSTIN ALLEN, INC. 1.86% $210,533.73
FLAT LINE, INC. 1.16% $131,300.61
WOLFE CONSTRUCTION GROUP, INCORPORATED 0.24% $27,165.64
SURFACE PREPARATION TECHNOLOGIES, LLC 0.23% $26,033.74
FC TRAFFIC CONTROL, INC. 0.22% $24,901.84
Total: 5.61% $634,996.90

Bid Items

Items: 40, 0 filtered
DICKENS US 82  |  CHILDRESS  |  0132-01-055  |  12/05/2023  |  $9,731,074  |  C 132-1-55  |  OVERLAY  |  99 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate A. L. HELMCAMP, INC. DUININCK, INC. J. LEE MILLIGAN, INC. GILVIN-TERRILL, LTD. KIEWIT INFRASTRUCTURE SOUTH CO.
132 6003 EMBANKMENT (FINAL)(ORD COMP)(TY B) CY 122.000 $50.000 $100.000 $130.000 $50.000 $10.000 $171.980
134 6001 BACKFILL (TY A) STA 935.000 $240.000 $200.000 $450.000 $410.000 $200.000 $400.000
164 6034 DRILL SEEDING (PERM) (RURAL) (SANDY) AC 43.000 $800.000 $500.000 $505.000 $480.000 $500.000 $923.480
168 6001 VEGETATIVE WATERING MG 1,677.000 $44.000 $1.000 $28.000 $57.000 $40.000 $73.680
314 6013 EMULS ASPH (EROSN CONT)(CSS-1H) GAL 41,268.000 $4.250 $5.000 $3.900 $5.000 $5.000 $4.150
351 6019 FLEXIBLE PAVEMENT STRUCTURE REPAIR(3") SY 1,000.000 $50.000 $85.000 $77.500 $60.000 $100.000 $86.640
354 6021 PLANE ASPH CONC PAV(0" TO 2") SY 8,446.000 $9.000 $11.000 $8.850 $8.000 $10.000 $7.810
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 244.000 $560.000 $970.000 $675.000 $650.000 $650.000 $707.130
500 6001 MOBILIZATION LS 1.000 $878,097.680 $1,100,000.000 $1,000,000.000 $1,171,465.000 $1,200,000.000 $1,291,725.320
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 6.000 $12,000.000 $20,000.000 $32,000.000 $50,000.000 $50,000.000 $35,097.860
506 6042 BIODEG EROSN CONT LOGS (INSTL) (18") LF 1,600.000 $6.000 $5.450 $5.500 $10.000 $5.000 $10.100
533 6001 RUMBLE STRIPS (SHOULDER) LF 183,225.000 $0.270 $0.170 $0.120 $0.250 $0.250 $0.160
540 6002 MTL W-BEAM GD FEN (STEEL POST) LF 4,075.000 $25.000 $31.460 $34.000 $32.250 $32.500 $35.360
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 6.000 $2,700.000 $2,684.930 $2,900.000 $2,735.000 $2,600.000 $3,002.420
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 9.000 $2,000.000 $1,572.760 $1,700.000 $1,600.000 $1,550.000 $1,756.240
540 6018 MTL BM GD FEN TRANS (NON - SYM) EA 6.000 $1,200.000 $1,235.740 $1,300.000 $1,215.000 $1,150.000 $1,333.120
540 6037 MTL BM GD FEN TRANS (ANCHOR PLATE) EA 6.000 $800.000 $1,112.170 $1,300.000 $1,255.000 $1,200.000 $1,379.490
542 6001 REMOVE METAL BEAM GUARD FENCE LF 4,375.000 $2.600 $4.490 $3.300 $3.200 $3.000 $3.480
542 6002 REMOVE TERMINAL ANCHOR SECTION EA 9.000 $350.000 $449.360 $275.000 $264.000 $250.000 $289.810
542 6004 RM MTL BM GD FENCE TRANS (THRIE-BEAM) EA 6.000 $300.000 $449.360 $275.000 $264.000 $250.000 $289.810
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 9.000 $3,800.000 $3,594.880 $3,800.000 $3,800.000 $3,450.000 $3,958.790
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 9.000 $300.000 $449.360 $275.000 $264.000 $250.000 $289.810
658 6061 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2 EA 48.000 $37.000 $34.830 $44.500 $42.250 $40.000 $46.370
658 6064 INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2 EA 18.000 $23.000 $34.830 $44.500 $42.250 $40.000 $46.370
662 6109 WK ZN PAV MRK SHT TERM (TAB)TY W EA 7,142.000 $3.000 $0.720 $1.600 $1.700 $1.500 $2.320
666 6018 REFL PAV MRK TY I (W)6"(DOT)(100MIL) LF 164.000 $1.150 $2.300 $1.400 $1.350 $1.000 $1.160
666 6042 REFL PAV MRK TY I (W)12"(SLD)(100MIL) LF 220.000 $4.500 $3.450 $8.850 $8.450 $7.500 $8.690
666 6081 REFL PAV MRK TY I(W)(ENTR GORE)(100MIL) EA 1.000 $2,000.000 $1,150.370 $1,700.000 $1,585.000 $1,000.000 $1,159.240
666 6084 REFL PAV MRK TY I(W)(EXIT GORE)(100MIL) EA 1.000 $2,000.000 $1,035.330 $1,700.000 $1,585.000 $500.000 $579.620
666 6102 REF PAV MRK TY I(W)36"(YLD TRI)(100MIL) EA 456.000 $57.000 $41.410 $24.500 $23.250 $45.000 $52.170
666 6306 RE PM W/RET REQ TY I (W)6"(BRK)(100MIL) LF 23,380.000 $0.530 $0.700 $0.580 $0.550 $0.700 $0.810
666 6309 RE PM W/RET REQ TY I (W)6"(SLD)(100MIL) LF 93,524.000 $0.650 $0.690 $0.580 $0.550 $0.640 $0.740
666 6321 RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL) LF 97,236.000 $0.650 $0.690 $0.580 $0.550 $0.690 $0.800
672 6010 REFL PAV MRKR TY II-C-R EA 1,231.000 $5.000 $4.210 $4.700 $4.500 $4.500 $5.220
677 6001 ELIM EXT PAV MRK & MRKS (4") LF 180.000 $4.000 $2.300 $1.100 $1.050 $5.000 $5.800
3076 6045 D-GR HMA TY-D SAC-A PG70-28 TON 47,117.000 $135.000 $155.000 $157.250 $157.800 $167.000 $171.950
3076 6047 D-GR HMA TY-D PG70-28 (LEVEL-UP) TON 7,221.000 $135.000 $175.000 $170.000 $160.000 $167.000 $174.000
3076 6066 TACK COAT GAL 40,724.000 $4.500 $5.000 $4.450 $6.000 $6.000 $5.180
6185 6002 TMA (STATIONARY) DAY 93.000 $260.000 $250.000 $220.000 $450.000 $355.000 $556.500
6185 6005 TMA (MOBILE OPERATION) DAY 6.000 $460.000 $600.000 $1,100.000 $900.000 $375.000 $1,090.610
Totals: $9,731,074.43 $11,319,017.73 $11,454,345.55 $11,799,347.40 $12,147,264.45 $12,702,579.20