PREPARING ROW
|
STA
|
12.000
|
$8,000.000
|
$75,000.000
|
$11,000.000
|
$79,166.670
|
$30,000.000
|
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
27.000
|
$20.000
|
$40.000
|
$31.000
|
$26.640
|
$15.000
|
|
|
|
REMOVING STAB BASE & ASPH PAV (8"-10")
|
SY
|
33.000
|
$9.500
|
$31.000
|
$58.400
|
$26.640
|
$15.000
|
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
3,988.000
|
$15.000
|
$14.700
|
$5.590
|
$26.640
|
$20.000
|
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
5,411.000
|
$15.000
|
$12.500
|
$19.500
|
$26.640
|
$20.000
|
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
3,431.000
|
$20.000
|
$14.000
|
$9.000
|
$20.070
|
$20.000
|
|
|
|
BLADING
|
HR
|
32.000
|
$100.000
|
$80.000
|
$104.000
|
$125.400
|
$125.000
|
|
|
|
FURNISHING AND PLACING TOPSOIL
|
CY
|
75.000
|
$25.000
|
$17.700
|
$69.400
|
$73.260
|
$45.000
|
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
9,056.000
|
$0.300
|
$0.140
|
$0.150
|
$0.270
|
$0.300
|
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
2,266.000
|
$0.300
|
$0.180
|
$0.200
|
$0.640
|
$0.650
|
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
2,266.000
|
$0.300
|
$0.180
|
$0.200
|
$0.640
|
$0.650
|
|
|
|
VEGETATIVE WATERING
|
MG
|
27.000
|
$30.000
|
$20.000
|
$28.850
|
$29.970
|
$100.000
|
|
|
|
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
|
CY
|
1,882.000
|
$75.000
|
$97.000
|
$66.000
|
$75.890
|
$90.000
|
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
56.000
|
$225.000
|
$165.000
|
$155.000
|
$210.000
|
$200.000
|
|
|
|
LIME TRT (EXST MATL)(8")
|
SY
|
3,503.000
|
$4.000
|
$7.000
|
$6.000
|
$7.980
|
$8.000
|
|
|
|
CEMENT
|
TON
|
35.000
|
$160.000
|
$180.000
|
$175.000
|
$210.000
|
$200.000
|
|
|
|
CEMENT TREAT(EXIST MATL)(8")
|
SY
|
3,503.000
|
$4.000
|
$4.500
|
$2.300
|
$6.840
|
$8.000
|
|
|
|
PRIME COAT (MC-30)
|
GAL
|
1,285.000
|
$5.000
|
$7.000
|
$4.500
|
$10.950
|
$6.000
|
|
|
|
AGGR(TY-PE GR-3 SAC-B)
|
CY
|
77.000
|
$150.000
|
$220.000
|
$350.000
|
$240.820
|
$350.000
|
|
|
|
AGGR(TY-PE GR-4 SAC-B)
|
CY
|
51.000
|
$150.000
|
$300.000
|
$200.000
|
$254.510
|
$350.000
|
|
|
|
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
|
GAL
|
4,725.000
|
$5.000
|
$5.250
|
$5.000
|
$8.760
|
$5.000
|
|
|
|
CEM STABIL BKFL
|
CY
|
342.400
|
$155.000
|
$175.000
|
$185.000
|
$160.000
|
$200.000
|
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
46.000
|
$7.000
|
$65.000
|
$50.000
|
$15.000
|
$1.000
|
|
|
|
TEMPORARY SPL SHORING (COFFERDAM)
|
SF
|
1,200.000
|
$35.000
|
$40.000
|
$18.050
|
$75.000
|
$70.000
|
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
200.000
|
$75.000
|
$75.000
|
$116.000
|
$100.000
|
$90.000
|
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
1,336.000
|
$250.000
|
$215.000
|
$224.000
|
$210.000
|
$260.000
|
|
|
|
DRILL SHAFT (54 IN)
|
LF
|
1,374.000
|
$465.000
|
$445.000
|
$520.000
|
$500.000
|
$550.000
|
|
|
|
CL C CONC (ABUT)
|
CY
|
73.300
|
$1,020.000
|
$950.000
|
$990.000
|
$1,300.000
|
$2,000.000
|
|
|
|
CL C CONC (CAP)
|
CY
|
147.000
|
$1,100.000
|
$950.000
|
$950.000
|
$1,200.000
|
$2,400.000
|
|
|
|
CL C CONC (COLUMN)
|
CY
|
53.300
|
$1,200.000
|
$1,150.000
|
$1,230.000
|
$1,400.000
|
$2,400.000
|
|
|
|
REINF CONC SLAB
|
SF
|
37,800.000
|
$18.000
|
$23.000
|
$16.750
|
$20.000
|
$27.000
|
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
1,542.620
|
$165.000
|
$175.000
|
$165.000
|
$155.000
|
$250.000
|
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
26.000
|
$500.000
|
$525.000
|
$580.000
|
$650.000
|
$500.000
|
|
|
|
RIPRAP (STONE PROTECTION)(24 IN)
|
CY
|
17.000
|
$135.000
|
$275.000
|
$215.000
|
$175.000
|
$190.000
|
|
|
|
RIPRAP (STONE PROTECTION)(30 IN)
|
CY
|
1,210.000
|
$250.000
|
$235.000
|
$187.000
|
$150.000
|
$190.000
|
|
|
|
ELASTOMERIC BEARING (EE3)
|
EA
|
5.000
|
$2,570.000
|
$3,150.000
|
$3,090.000
|
$4,000.000
|
$2,500.000
|
|
|
|
ELASTOMERIC BEARING (E7)
|
EA
|
5.000
|
$2,200.000
|
$1,200.000
|
$4,960.000
|
$5,500.000
|
$4,500.000
|
|
|
|
ELASTOMERIC BEARING (F7)
|
EA
|
5.000
|
$2,500.000
|
$2,200.000
|
$5,600.000
|
$6,000.000
|
$4,500.000
|
|
|
|
SLIDING ELASTOMERIC BEARING (ES 3)
|
EA
|
5.000
|
$2,280.000
|
$3,200.000
|
$3,850.000
|
$4,500.000
|
$4,000.000
|
|
|
|
STR STEEL (PLATE GIRDER)
|
LB
|
1,460,474.000
|
$1.750
|
$1.950
|
$2.050
|
$2.110
|
$2.800
|
|
|
|
RAIL (TY SSTR) (W/DRAIN SLOTS)
|
LF
|
1,872.000
|
$85.000
|
$75.000
|
$50.000
|
$66.930
|
$85.000
|
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
82.000
|
$120.000
|
$150.000
|
$152.000
|
$140.000
|
$120.000
|
|
|
|
SEALED EXPANSION JOINT (5 IN) (SEJ - M)
|
LF
|
82.000
|
$130.000
|
$150.000
|
$153.000
|
$145.000
|
$120.000
|
|
|
|
CONC BOX CULV (7 FT X 5 FT)
|
LF
|
215.000
|
$550.000
|
$675.000
|
$810.000
|
$600.000
|
$800.000
|
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
28.000
|
$120.000
|
$130.000
|
$300.000
|
$160.000
|
$150.000
|
|
|
|
SET (TY I)(S= 7 FT)(HW= 6 FT)(3:1) (C)
|
EA
|
8.000
|
$8,500.000
|
$7,400.000
|
$4,210.000
|
$6,000.000
|
$6,000.000
|
|
|
|
SET (TY II) (24 IN) (HDPE) (6: 1) (P)
|
EA
|
4.000
|
$1,200.000
|
$0.000
|
$1,230.000
|
$3,500.000
|
$2,000.000
|
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$2,200.000
|
$2,250.000
|
$1,650.000
|
$4,000.000
|
$3,000.000
|
|
|
|
REMOV STR (BOX CULVERT)
|
EA
|
1.000
|
$15,000.000
|
$25,000.000
|
$7,600.000
|
$5,000.000
|
$25,000.000
|
|
|
|
REMOV STR (BRIDGE 500 - 999 FT LENGTH)
|
EA
|
1.000
|
$100,000.000
|
$500,000.000
|
$339,000.000
|
$360,000.000
|
$750,000.000
|
|
|
|
REMOV STR (SMALL)
|
EA
|
2.000
|
$1,000.000
|
$1,000.000
|
$1,990.000
|
$2,500.000
|
$2,000.000
|
|
|
|
REMOV STR (SMALL FENCE)
|
LF
|
420.000
|
$3.000
|
$5.000
|
$4.000
|
$9.000
|
$5.000
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$920,000.000
|
$745,000.000
|
$670,000.000
|
$950,000.000
|
$1,200,000.000
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
15.000
|
$2,500.000
|
$3,000.000
|
$580.000
|
$2,345.170
|
$1,400.000
|
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
50.000
|
$30.000
|
$39.250
|
$39.200
|
$41.940
|
$45.000
|
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
50.000
|
$10.000
|
$13.750
|
$13.800
|
$14.770
|
$16.000
|
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,346.000
|
$3.000
|
$2.750
|
$3.000
|
$3.210
|
$3.200
|
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,346.000
|
$1.000
|
$0.750
|
$0.500
|
$0.540
|
$0.600
|
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
60.000
|
$9.000
|
$46.000
|
$103.000
|
$27.270
|
$25.000
|
|
|
|
DRIVEWAYS (CONC)
|
SY
|
34.000
|
$90.000
|
$165.000
|
$130.000
|
$192.230
|
$85.000
|
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
37.000
|
$45.000
|
$58.000
|
$78.000
|
$39.420
|
$70.000
|
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
425.000
|
$25.000
|
$27.000
|
$27.450
|
$27.820
|
$26.000
|
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,900.000
|
$2,250.000
|
$1,860.000
|
$1,872.500
|
$1,900.000
|
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
15.000
|
$2.000
|
$1.000
|
$33.600
|
$2.760
|
$2.400
|
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,800.000
|
$31.000
|
$3,150.000
|
$2,728.500
|
$2,900.000
|
|
|
|
WIRE FENCE (TY A)
|
LF
|
238.000
|
$16.000
|
$16.500
|
$15.000
|
$18.340
|
$15.000
|
|
|
|
WIRE FENCE (WATER GAP)
|
LF
|
50.000
|
$50.000
|
$65.000
|
$60.000
|
$66.870
|
$45.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$600.000
|
$725.000
|
$800.000
|
$802.500
|
$780.000
|
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
6.000
|
$400.000
|
$425.000
|
$510.000
|
$481.500
|
$500.000
|
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
2.000
|
$450.000
|
$435.000
|
$590.000
|
$615.250
|
$530.000
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
5.000
|
$95.000
|
$115.000
|
$103.000
|
$97.780
|
$25.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
76.000
|
$25.000
|
$21.000
|
$16.600
|
$19.260
|
$22.000
|
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
4.000
|
$70.000
|
$21.000
|
$66.400
|
$48.150
|
$50.000
|
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
12.000
|
$40.000
|
$2.150
|
$14.550
|
$47.600
|
$2.400
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
29.000
|
$35.000
|
$24.000
|
$25.150
|
$24.080
|
$32.000
|
|
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
4,670.000
|
$1.000
|
$0.850
|
$0.800
|
$0.860
|
$1.000
|
|
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
4,670.000
|
$1.000
|
$0.850
|
$0.800
|
$0.860
|
$1.000
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
60.000
|
$6.000
|
$31.000
|
$30.000
|
$32.100
|
$14.000
|
|
|
|
NO. OF DAYS MILESTONE 1
|
$/D
|
1,350.000
|
$45.000
|
$45.000
|
$45.000
|
$45.000
|
$45.000
|
|
|
|
NO. OF DAYS MILESTONE 2
|
$/D
|
16,000.000
|
$290.000
|
$200.000
|
$290.000
|
$290.000
|
$290.000
|
|
|
|
THERMO PIPE(24")(HDPE)(TY S)(CSB)
|
LF
|
88.000
|
$75.000
|
$0.000
|
$33.450
|
$134.800
|
$85.000
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$5,000.000
|
$10,100.000
|
$8,261.300
|
$20,000.000
|
|
1
|
|
CMP (GAL STL 24 IN)
|
LF
|
88.000
|
$75.000
|
$85.000
|
$0.000
|
$0.000
|
$0.000
|
|
1
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (P)
|
EA
|
4.000
|
$1,200.000
|
$1,700.000
|
$0.000
|
$0.000
|
$0.000
|
|
Totals: |
$12,060,782.700
|
$12,073,105.550
|
$12,338,458.770
|
$13,967,093.710
|
$15,918,053.400
|