DEWITT SH 72 (0270-10-013)

Items: 74

County: DEWITT
Length: N/A
Highway: SH 72
District: YOAKUM
Control Number: 0270-10-013
DBE Goal: N/A
Project: BR 1802(496)
Guaranty: N/A
Time: 0 X
Engineer's Estimate: $15,099,265.00
Date: 08/08/2018 (7 years ago)
Contract Number: N/A
Type: REPLACE BRIDGE AND APPROACHES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$15,099,265.00
$12,717,082.25
Over/Under Est: -15.78% -$2,382,182.75
Over/Under Est: -10.01% -$1,511,566.35
Amt Left: 6.85% $870,616.40
$16,397,597.29
Over/Under Est: 8.6% $1,298,332.29
Amt Left: 28.94% $3,680,515.04
Delta: -20.68% -$2,809,898.64

Bid Items & Bid Tabulations

74 Total 0 of 74
DEWITT  |  SH 72  |  YOAKUM  |  0270-10-013  |  08/08/2018  |  $15,099,265.00  |  BR 1802(496)  |  REPLACE BRIDGE AND APPROACHES  |  0 X
Item Code
Description
Unit
Quantity
Engineer's Estimate
SB CONTRACTORS LLC
CAPITAL EXCAVATION COMPANY
HUNTER INDUSTRIES, LTD.
PREPARING ROW
STA 6.000 $3,000.000 $4,000.000 $13,657.540 $16,650.000
EXCAVATION (ROADWAY)
CY 837.000 $15.000 $8.000 $16.760 $73.260
EXCAVATION (CHANNEL)
CY 5,375.000 $10.000 $15.000 $17.250 $73.260
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 1,035.000 $20.000 $8.000 $50.190 $36.630
BLADING
HR 20.000 $100.000 $65.000 $108.740 $102.600
FURNISHING AND PLACING TOPSOIL (4")
SY 7,106.000 $1.500 $2.000 $3.050 $2.190
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 7,106.000 $2.000 $0.500 $0.350 $0.420
CELL FBR MLCH SEED(TEMP)(WARM)
SY 1,777.000 $1.000 $0.750 $0.500 $0.300
CELL FBR MLCH SEED(TEMP)(COOL)
SY 1,777.000 $1.000 $0.750 $0.500 $0.340
VEGETATIVE WATERING
MG 60.000 $100.000 $45.000 $37.620 $73.260
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
CY 598.000 $75.000 $95.000 $89.370 $79.390
FL BS (RDWY DEL) (TY E GR 1-2)
TON 254.000 $50.000 $32.000 $54.080 $41.700
REWORK BS MTL (TY C) (6") (ORD COMP)
SY 605.000 $5.000 $9.000 $16.840 $3.990
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 33.000 $165.000 $165.000 $186.950 $210.000
LIME TRT (SUBGRADE)(6")
SY 2,862.000 $2.000 $3.500 $16.760 $5.700
PRIME COAT (MC-30)
GAL 620.000 $5.000 $5.000 $5.000 $8.760
AGGR(TY-PB GR-4 SAC-B)
CY 88.000 $100.000 $125.000 $135.000 $193.770
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 3,528.000 $4.000 $4.000 $4.250 $6.480
D-GR HMA TY-B PG70-22
TON 326.000 $100.000 $96.000 $107.000 $118.410
D-GR HMA TY-D SAC-B PG70-22
TON 682.000 $90.000 $96.000 $107.000 $118.410
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 250.000 $75.000 $100.000 $110.000 $161.340
PLANE ASPH CONC PAV(0" TO 2")
SY 1,911.000 $3.000 $4.000 $3.200 $3.330
CEM STABIL BKFL
CY 576.000 $175.000 $135.000 $166.000 $137.770
TEMPORARY SPL SHORING
SF 2,643.000 $15.000 $40.000 $14.300 $29.030
DRILL SHAFT (18 IN)
LF 152.000 $75.000 $45.000 $45.520 $73.080
DRILL SHAFT (42 IN)
LF 959.000 $200.000 $210.000 $213.090 $229.590
DRILL SHAFT (60 IN)
LF 560.000 $400.000 $550.000 $596.250 $688.020
CL C CONC (ABUT)
CY 134.400 $750.000 $700.000 $814.460 $1,010.830
CL C CONC (CAP)
CY 115.200 $800.000 $950.000 $777.180 $1,127.440
CL C CONC (COLUMN)
CY 90.700 $900.000 $850.000 $957.480 $1,078.680
CL C CONC (TIE BEAM)
CY 94.800 $2,500.000 $550.000 $689.470 $880.400
REINF CONC SLAB
SF 36,400.000 $15.000 $14.000 $17.000 $23.940
RIPRAP (CONC)(5 IN)
CY 147.000 $500.000 $375.000 $513.610 $532.540
RIPRAP (STONE PROTECTION)(18 IN)
CY 1,500.000 $150.000 $125.000 $140.500 $110.000
ELASTOMERIC BEARING (E5)
EA 8.000 $2,000.000 $1,600.000 $3,477.190 $2,652.960
ELASTOMERIC BEARING (F5)
EA 8.000 $2,000.000 $1,600.000 $3,477.190 $2,523.210
SLIDING ELASTOMERIC BEARING (ES 4)
EA 16.000 $1,900.000 $1,700.000 $2,846.300 $2,204.470
STR STEEL (PLATE GIRDER)
LB 1,546,000.000 $1.850 $1.600 $1.360 $1.820
RAIL (TY T223)
LF 1,116.000 $90.000 $95.000 $94.040 $132.200
SEALED EXPANSION JOINT (5 IN) (SEJ - A)
LF 139.000 $120.000 $90.000 $113.890 $113.620
RC PIPE (CL III)(18 IN)
LF 132.000 $85.000 $65.000 $142.770 $92.070
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 4.000 $1,200.000 $1,000.000 $1,379.710 $1,688.490
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $100,000.000 $220,000.000 $400,000.000 $171,041.860
REMOV STR (SMALL)
EA 3.000 $500.000 $1,000.000 $1,966.830 $1,142.950
MOBILIZATION
LS 1.000 $500,000.000 $610,000.000 $722,000.000 $1,538,326.690
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 18.000 $3,500.000 $3,000.000 $1,000.000 $1,419.920
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 50.000 $50.000 $60.000 $56.410 $30.000
ROCK FILTER DAMS (REMOVE)
LF 50.000 $10.000 $35.000 $35.900 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,320.000 $3.000 $4.000 $3.590 $2.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,320.000 $1.000 $1.200 $1.230 $0.600
DRIVEWAYS (ACP)
SY 130.000 $60.000 $55.000 $47.930 $35.040
RUMBLE STRIPS (SHOULDER)
LF 1,660.000 $1.000 $3.600 $10.650 $0.970
RUMBLE STRIPS (CENTERLINE)
LF 830.000 $2.000 $4.000 $10.650 $0.970
MTL W-BEAM GD FEN (TIM POST)
LF 275.000 $30.000 $27.850 $25.490 $22.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,500.000 $1,860.000 $1,600.000 $1,800.000
REMOVE METAL BEAM GUARD FENCE
LF 325.000 $5.000 $5.000 $1.540 $1.500
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $250.000 $200.000 $128.210 $200.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $200.000 $250.000 $153.850 $250.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,400.000 $2,940.000 $2,805.130 $2,300.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 1.000 $350.000 $200.000 $194.360 $200.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 4.000 $450.000 $450.000 $371.900 $300.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 2.000 $500.000 $525.000 $489.390 $300.000
RELOCATE SM RD SN SUP&AM TY TWT
EA 5.000 $450.000 $450.000 $348.210 $200.000
REMOVE SM RD SN SUP&AM
EA 3.000 $250.000 $250.000 $102.560 $75.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 22.000 $15.000 $17.000 $10.260 $5.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 12.000 $50.000 $21.000 $14.100 $10.000
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 2,700.000 $0.500 $1.500 $2.320 $0.750
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 100.000 $2.000 $2.500 $3.870 $0.750
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 2,308.000 $0.500 $1.500 $2.320 $0.750
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 18.000 $24.000 $50.000 $77.310 $15.000
REFL PAV MRKR TY II-A-A
EA 34.000 $25.000 $50.000 $77.310 $10.000
NO. OF WORKING DAYS
$/D 20,000.000 $430.000 $330.000 $370.000 $350.000
TEMP CONSTRUCTION ACCESS
LS 1.000 $400,000.000 $235,000.000 $50,000.000 $1,260,517.300
PORTABLE CHANGEABLE MESSAGE SIGN
EA 5.000 $8,000.000 $18,000.000 $8,602.170 $6,500.000
Totals: $15,099,265.000 $12,717,082.250 $13,587,698.672 $16,397,597.306