REMOVING CONC (CURB AND GUTTER)
|
LF
|
413.000
|
$4.000
|
$8.000
|
$6.688
|
$3.450
|
$12.210
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
16,419.000
|
$15.000
|
$11.240
|
$7.073
|
$12.000
|
$17.590
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
6,923.000
|
$15.000
|
$8.060
|
$10.390
|
$4.350
|
$5.100
|
|
|
BLADING
|
HR
|
40.000
|
$150.000
|
$92.110
|
$116.523
|
$237.150
|
$33.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
63,880.000
|
$1.000
|
$0.900
|
$0.867
|
$0.300
|
$2.570
|
|
|
CELL FBR MLCH SEED(PERM)(URBAN)(SANDY)
|
AC
|
13.200
|
$1,500.000
|
$1,279.210
|
$1,241.418
|
$2,100.450
|
$1,863.400
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
AC
|
3.300
|
$500.000
|
$1,078.760
|
$1,046.892
|
$3,113.600
|
$532.400
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
AC
|
3.300
|
$500.000
|
$1,078.760
|
$1,046.892
|
$3,113.600
|
$532.400
|
|
|
VEGETATIVE WATERING
|
MG
|
1,610.000
|
$20.000
|
$20.180
|
$23.394
|
$23.800
|
$13.200
|
|
|
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
|
CY
|
10,144.000
|
$60.000
|
$55.740
|
$52.337
|
$65.250
|
$59.970
|
|
|
PRIME COAT (MC-30)
|
GAL
|
6,513.000
|
$4.000
|
$3.340
|
$3.581
|
$2.950
|
$3.720
|
|
|
AGGR(TY-PE GR-4 SAC-B)
|
CY
|
385.000
|
$90.000
|
$69.410
|
$93.174
|
$149.350
|
$163.750
|
|
|
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
|
GAL
|
16,903.000
|
$2.500
|
$2.600
|
$2.513
|
$3.550
|
$2.660
|
|
|
D-GR HMA TY-B PG70-22
|
TON
|
6,693.000
|
$62.000
|
$61.760
|
$64.938
|
$65.450
|
$95.770
|
|
|
D-GR HMA TY-D SAC-B PG70-22
|
TON
|
4,127.000
|
$62.000
|
$62.640
|
$69.919
|
$70.400
|
$97.110
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
|
SY
|
500.000
|
$90.000
|
$67.150
|
$106.567
|
$67.400
|
$88.410
|
|
|
CEM STABIL BKFL
|
CY
|
135.000
|
$150.000
|
$136.910
|
$115.300
|
$155.150
|
$198.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
2,070.000
|
$30.000
|
$23.620
|
$12.600
|
$5.450
|
$24.200
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
268.700
|
$450.000
|
$516.880
|
$492.200
|
$506.000
|
$555.500
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
51.000
|
$500.000
|
$551.900
|
$481.500
|
$472.000
|
$503.800
|
|
|
RAIL (TY T223)
|
LF
|
63.000
|
$185.000
|
$118.870
|
$143.100
|
$180.000
|
$104.500
|
|
|
RETROFIT RAIL (TY T223)
|
LF
|
66.000
|
$165.000
|
$197.410
|
$271.800
|
$275.000
|
$126.500
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
23.000
|
$60.000
|
$49.880
|
$60.480
|
$87.550
|
$55.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
|
LF
|
67.000
|
$300.000
|
$477.610
|
$322.580
|
$743.000
|
$748.000
|
|
|
CONC BOX CULV (10 FT X 13 FT) (EXTEND)
|
LF
|
7.000
|
$1,000.000
|
$2,122.710
|
$1,516.500
|
$2,776.000
|
$1,314.500
|
|
|
CONC BOX CULV (10 FT X 12 FT) (EXTEND)
|
LF
|
28.000
|
$1,000.000
|
$2,122.710
|
$1,976.810
|
$1,867.000
|
$1,375.000
|
|
|
RC PIPE (CL IV)(18 IN)
|
LF
|
158.000
|
$60.000
|
$47.180
|
$73.940
|
$112.900
|
$88.000
|
|
|
WINGWALL (FW - S) (HW=15 FT)
|
EA
|
1.000
|
$30,000.000
|
$48,716.120
|
$37,211.000
|
$43,350.000
|
$52,800.000
|
|
|
WINGWALL (FW - S) (HW=16 FT)
|
EA
|
1.000
|
$32,000.000
|
$50,653.090
|
$40,837.000
|
$51,100.000
|
$52,800.000
|
|
|
SET (TY I)(S=3 FT)(HW= 4 FT)(3:1)(C)
|
EA
|
2.000
|
$6,000.000
|
$5,895.820
|
$3,957.700
|
$5,570.000
|
$7,150.000
|
|
|
SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)
|
EA
|
5.000
|
$6,000.000
|
$5,121.030
|
$4,320.000
|
$5,400.000
|
$8,085.000
|
|
|
SET (TY II) (18 IN) (CMP) (6: 1) (P)
|
EA
|
6.000
|
$1,000.000
|
$1,305.460
|
$861.150
|
$1,100.000
|
$968.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
10.000
|
$1,000.000
|
$1,528.350
|
$1,222.810
|
$765.000
|
$968.000
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (P)
|
EA
|
2.000
|
$1,200.000
|
$1,804.300
|
$1,136.760
|
$1,500.000
|
$7,150.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
4.000
|
$1,000.000
|
$1,087.890
|
$1,070.000
|
$1,363.750
|
$1,650.000
|
|
|
REMOV STR (PIPE)
|
EA
|
1.000
|
$800.000
|
$374.660
|
$588.500
|
$457.200
|
$1,650.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$250,000.000
|
$187,858.010
|
$306,591.648
|
$192,682.790
|
$233,506.550
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$2,500.000
|
$2,599.830
|
$9,379.586
|
$5,137.300
|
$893.070
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
104.000
|
$25.000
|
$26.000
|
$25.235
|
$59.550
|
$52.800
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
104.000
|
$8.000
|
$6.370
|
$6.180
|
$16.350
|
$41.800
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,821.000
|
$2.500
|
$2.390
|
$2.318
|
$5.350
|
$2.480
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,821.000
|
$0.750
|
$0.270
|
$0.258
|
$1.400
|
$2.480
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
540.000
|
$50.000
|
$21.810
|
$15.783
|
$23.800
|
$58.260
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
480.000
|
$10.000
|
$12.520
|
$9.363
|
$15.150
|
$18.620
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
540.000
|
$15.000
|
$19.530
|
$12.840
|
$15.600
|
$27.130
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
412.000
|
$22.000
|
$27.380
|
$21.400
|
$28.900
|
$35.200
|
|
|
INTERSECTIONS (ACP)
|
SY
|
2,205.000
|
$40.000
|
$30.800
|
$49.937
|
$76.650
|
$38.500
|
|
|
DRIVEWAYS (CONC)
|
SY
|
102.000
|
$70.000
|
$66.280
|
$64.200
|
$83.800
|
$33.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
5,013.000
|
$40.000
|
$30.800
|
$24.771
|
$30.300
|
$41.800
|
|
|
TURNOUTS (ACP)
|
SY
|
137.000
|
$50.000
|
$122.690
|
$24.771
|
$66.150
|
$60.500
|
|
|
CURB RAMPS (TY 7)
|
EA
|
2.000
|
$2,500.000
|
$1,363.840
|
$19.260
|
$1,537.450
|
$2,750.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
512.500
|
$20.000
|
$19.640
|
$19.055
|
$19.650
|
$18.430
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,600.000
|
$1,909.240
|
$1,792.586
|
$1,377.900
|
$1,320.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
420.000
|
$1.500
|
$1.590
|
$1.545
|
$1.600
|
$1.380
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$150.000
|
$132.670
|
$128.750
|
$132.600
|
$121.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
6.000
|
$2,200.000
|
$2,458.090
|
$2,385.480
|
$2,456.900
|
$2,007.500
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
2.000
|
$12,000.000
|
$8,098.130
|
$8,085.500
|
$1,135.400
|
$9,350.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$850.000
|
$1,443.440
|
$1,030.000
|
$540.550
|
$1,650.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$500.000
|
$551.900
|
$669.500
|
$274.150
|
$550.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
3.000
|
$400.000
|
$371.470
|
$360.500
|
$406.300
|
$467.500
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
15.000
|
$125.000
|
$159.200
|
$154.500
|
$189.900
|
$159.500
|
|
|
MAILBOX INSTALL-D (WC-POST) TY 3
|
EA
|
1.000
|
$175.000
|
$185.740
|
$180.250
|
$219.600
|
$192.500
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
20.000
|
$400.000
|
$480.850
|
$466.642
|
$493.300
|
$385.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$500.000
|
$515.760
|
$500.529
|
$580.300
|
$467.500
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
1.000
|
$500.000
|
$771.870
|
$749.068
|
$663.050
|
$495.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
|
EA
|
6.000
|
$600.000
|
$737.380
|
$715.593
|
$758.500
|
$660.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
1.000
|
$800.000
|
$716.410
|
$695.250
|
$864.600
|
$907.500
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
3.000
|
$300.000
|
$482.920
|
$468.650
|
$440.250
|
$302.500
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
31.000
|
$60.000
|
$79.600
|
$77.250
|
$68.950
|
$49.500
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
12.000
|
$40.000
|
$55.900
|
$54.250
|
$55.850
|
$29.700
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
13.000
|
$30.000
|
$20.920
|
$20.301
|
$20.900
|
$27.500
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
36,532.000
|
$0.500
|
$0.500
|
$0.484
|
$0.550
|
$0.520
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
480.000
|
$8.000
|
$6.370
|
$6.180
|
$10.500
|
$6.600
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
36,532.000
|
$0.500
|
$0.500
|
$0.484
|
$0.550
|
$0.520
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
920.000
|
$1.200
|
$1.680
|
$1.430
|
$1.250
|
$0.720
|
|
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
|
LF
|
136.000
|
$1.500
|
$6.370
|
$6.180
|
$6.600
|
$6.600
|
|
REFL PAV MRK TY I (Y)8"(SLD)(090MIL)
|
LF
|
150.000
|
$1.000
|
$0.740
|
$0.721
|
$0.650
|
$0.770
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
40.000
|
$0.350
|
$0.380
|
$0.371
|
$0.400
|
$0.400
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
17,106.000
|
$0.350
|
$0.300
|
$0.288
|
$0.400
|
$0.310
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
3,970.000
|
$0.350
|
$0.340
|
$0.330
|
$0.400
|
$0.350
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
16,656.000
|
$0.350
|
$0.300
|
$0.288
|
$0.400
|
$0.310
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
34.000
|
$10.000
|
$12.740
|
$12.360
|
$15.900
|
$13.200
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
5.000
|
$300.000
|
$212.270
|
$206.000
|
$302.350
|
$220.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
1.000
|
$300.000
|
$318.410
|
$309.000
|
$397.800
|
$330.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
417.000
|
$3.500
|
$4.250
|
$4.120
|
$6.150
|
$4.400
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
18,266.000
|
$0.250
|
$0.500
|
$0.484
|
$1.050
|
$0.520
|
|
|
TREE TRIMMING / BRUSH REMOVAL
|
MI
|
0.460
|
$20,000.000
|
$16,012.800
|
$34,093.000
|
$13,385.750
|
$36,410.000
|
|
|
TREE REMOVAL (24" - 30" DIA)
|
EA
|
19.000
|
$1,500.000
|
$3,170.010
|
$447.020
|
$3,076.450
|
$477.400
|
|
|
TREE REMOVAL (36" - 42" DIA)
|
EA
|
2.000
|
$4,000.000
|
$4,125.220
|
$5,807.140
|
$4,031.200
|
$6,201.800
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$8,171.270
|
$8,560.000
|
$5,766.250
|
$16,500.000
|
|
Totals: |
$3,203,871.950
|
$3,015,734.972
|
$3,058,796.036
|
$3,315,452.710
|
$3,812,200.465
|