Show Job Controls
Bid Cobra

DEWITT US 87 (0143-08-097)

Items: 90

County: DEWITT
Length: N/A
Highway: US 87
District: YOAKUM
Control Number: 0143-08-097
DBE Goal: N/A
Project: NH 2017(700)
Guaranty: N/A
Time: 148 WORKING DAYS
Engineer's Estimate: $3,203,871.95
Date: 02/03/2017 (9 years ago)
Contract Number: N/A
Type: WIDEN ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$3,203,871.95
$3,015,734.94
Over/Under Est: -5.87% -$188,137.01
Over/Under Est: -4.53% -$145,076.08
Amt Left: 1.43% $43,060.93
Over/Under Est: 3.48% $111,580.75
Amt Left: 9.94% $299,717.76
Delta: -8.39% -$256,656.83
Over/Under Est: 18.99% $608,328.51
Amt Left: 26.41% $796,465.52
Delta: -14.98% -$496,747.76

Bid Items & Bid Tabulations

90 Total 0 of 90
DEWITT  |  US 87  |  YOAKUM  |  0143-08-097  |  02/03/2017  |  $3,203,871.95  |  NH 2017(700)  |  WIDEN ROADWAY  |  148 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HUNTER INDUSTRIES, LTD.
DEAN WORD COMPANY, LTD.
CURRAN CONTRACTING COMPANY
J. CARROLL WEAVER, INC.
REMOVING CONC (CURB AND GUTTER)
LF 413.000 $4.000 $8.000 $6.688 $3.450 $12.210
EXCAVATION (ROADWAY)
CY 16,419.000 $15.000 $11.240 $7.073 $12.000 $17.590
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 6,923.000 $15.000 $8.060 $10.390 $4.350 $5.100
BLADING
HR 40.000 $150.000 $92.110 $116.523 $237.150 $33.000
FURNISHING AND PLACING TOPSOIL (4")
SY 63,880.000 $1.000 $0.900 $0.867 $0.300 $2.570
CELL FBR MLCH SEED(PERM)(URBAN)(SANDY)
AC 13.200 $1,500.000 $1,279.210 $1,241.418 $2,100.450 $1,863.400
CELL FBR MLCH SEED(TEMP)(WARM)
AC 3.300 $500.000 $1,078.760 $1,046.892 $3,113.600 $532.400
CELL FBR MLCH SEED(TEMP)(COOL)
AC 3.300 $500.000 $1,078.760 $1,046.892 $3,113.600 $532.400
VEGETATIVE WATERING
MG 1,610.000 $20.000 $20.180 $23.394 $23.800 $13.200
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
CY 10,144.000 $60.000 $55.740 $52.337 $65.250 $59.970
PRIME COAT (MC-30)
GAL 6,513.000 $4.000 $3.340 $3.581 $2.950 $3.720
AGGR(TY-PE GR-4 SAC-B)
CY 385.000 $90.000 $69.410 $93.174 $149.350 $163.750
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 16,903.000 $2.500 $2.600 $2.513 $3.550 $2.660
D-GR HMA TY-B PG70-22
TON 6,693.000 $62.000 $61.760 $64.938 $65.450 $95.770
D-GR HMA TY-D SAC-B PG70-22
TON 4,127.000 $62.000 $62.640 $69.919 $70.400 $97.110
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 500.000 $90.000 $67.150 $106.567 $67.400 $88.410
CEM STABIL BKFL
CY 135.000 $150.000 $136.910 $115.300 $155.150 $198.000
TEMPORARY SPL SHORING
SF 2,070.000 $30.000 $23.620 $12.600 $5.450 $24.200
RIPRAP (CONC)(5 IN)
CY 268.700 $450.000 $516.880 $492.200 $506.000 $555.500
RIPRAP (MOW STRIP)(4 IN)
CY 51.000 $500.000 $551.900 $481.500 $472.000 $503.800
RAIL (TY T223)
LF 63.000 $185.000 $118.870 $143.100 $180.000 $104.500
RETROFIT RAIL (TY T223)
LF 66.000 $165.000 $197.410 $271.800 $275.000 $126.500
CMP (GAL STL 18 IN)
LF 23.000 $60.000 $49.880 $60.480 $87.550 $55.000
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 67.000 $300.000 $477.610 $322.580 $743.000 $748.000
CONC BOX CULV (10 FT X 13 FT) (EXTEND)
LF 7.000 $1,000.000 $2,122.710 $1,516.500 $2,776.000 $1,314.500
CONC BOX CULV (10 FT X 12 FT) (EXTEND)
LF 28.000 $1,000.000 $2,122.710 $1,976.810 $1,867.000 $1,375.000
RC PIPE (CL IV)(18 IN)
LF 158.000 $60.000 $47.180 $73.940 $112.900 $88.000
WINGWALL (FW - S) (HW=15 FT)
EA 1.000 $30,000.000 $48,716.120 $37,211.000 $43,350.000 $52,800.000
WINGWALL (FW - S) (HW=16 FT)
EA 1.000 $32,000.000 $50,653.090 $40,837.000 $51,100.000 $52,800.000
SET (TY I)(S=3 FT)(HW= 4 FT)(3:1)(C)
EA 2.000 $6,000.000 $5,895.820 $3,957.700 $5,570.000 $7,150.000
SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)
EA 5.000 $6,000.000 $5,121.030 $4,320.000 $5,400.000 $8,085.000
SET (TY II) (18 IN) (CMP) (6: 1) (P)
EA 6.000 $1,000.000 $1,305.460 $861.150 $1,100.000 $968.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 10.000 $1,000.000 $1,528.350 $1,222.810 $765.000 $968.000
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 2.000 $1,200.000 $1,804.300 $1,136.760 $1,500.000 $7,150.000
CLEAN EXIST CULVERTS
EA 4.000 $1,000.000 $1,087.890 $1,070.000 $1,363.750 $1,650.000
REMOV STR (PIPE)
EA 1.000 $800.000 $374.660 $588.500 $457.200 $1,650.000
MOBILIZATION
LS 1.000 $250,000.000 $187,858.010 $306,591.648 $192,682.790 $233,506.550
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $2,500.000 $2,599.830 $9,379.586 $5,137.300 $893.070
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 104.000 $25.000 $26.000 $25.235 $59.550 $52.800
ROCK FILTER DAMS (REMOVE)
LF 104.000 $8.000 $6.370 $6.180 $16.350 $41.800
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,821.000 $2.500 $2.390 $2.318 $5.350 $2.480
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,821.000 $0.750 $0.270 $0.258 $1.400 $2.480
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 540.000 $50.000 $21.810 $15.783 $23.800 $58.260
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 480.000 $10.000 $12.520 $9.363 $15.150 $18.620
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 540.000 $15.000 $19.530 $12.840 $15.600 $27.130
CONC CURB & GUTTER (TY II)
LF 412.000 $22.000 $27.380 $21.400 $28.900 $35.200
INTERSECTIONS (ACP)
SY 2,205.000 $40.000 $30.800 $49.937 $76.650 $38.500
DRIVEWAYS (CONC)
SY 102.000 $70.000 $66.280 $64.200 $83.800 $33.000
DRIVEWAYS (ACP)
SY 5,013.000 $40.000 $30.800 $24.771 $30.300 $41.800
TURNOUTS (ACP)
SY 137.000 $50.000 $122.690 $24.771 $66.150 $60.500
CURB RAMPS (TY 7)
EA 2.000 $2,500.000 $1,363.840 $19.260 $1,537.450 $2,750.000
MTL W-BEAM GD FEN (TIM POST)
LF 512.500 $20.000 $19.640 $19.055 $19.650 $18.430
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,600.000 $1,909.240 $1,792.586 $1,377.900 $1,320.000
REMOVE METAL BEAM GUARD FENCE
LF 420.000 $1.500 $1.590 $1.545 $1.600 $1.380
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $150.000 $132.670 $128.750 $132.600 $121.000
GUARDRAIL END TREATMENT (INSTALL)
EA 6.000 $2,200.000 $2,458.090 $2,385.480 $2,456.900 $2,007.500
CRASH CUSH ATTEN (INSTL)
EA 2.000 $12,000.000 $8,098.130 $8,085.500 $1,135.400 $9,350.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $850.000 $1,443.440 $1,030.000 $540.550 $1,650.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $500.000 $551.900 $669.500 $274.150 $550.000
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 3.000 $400.000 $371.470 $360.500 $406.300 $467.500
MAILBOX INSTALL-S (WC-POST) TY 3
EA 15.000 $125.000 $159.200 $154.500 $189.900 $159.500
MAILBOX INSTALL-D (WC-POST) TY 3
EA 1.000 $175.000 $185.740 $180.250 $219.600 $192.500
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 20.000 $400.000 $480.850 $466.642 $493.300 $385.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $500.000 $515.760 $500.529 $580.300 $467.500
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 1.000 $500.000 $771.870 $749.068 $663.050 $495.000
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
EA 6.000 $600.000 $737.380 $715.593 $758.500 $660.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 1.000 $800.000 $716.410 $695.250 $864.600 $907.500
RELOCATE SM RD SN SUP&AM TY S80
EA 3.000 $300.000 $482.920 $468.650 $440.250 $302.500
REMOVE SM RD SN SUP&AM
EA 31.000 $60.000 $79.600 $77.250 $68.950 $49.500
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 12.000 $40.000 $55.900 $54.250 $55.850 $29.700
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 13.000 $30.000 $20.920 $20.301 $20.900 $27.500
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 36,532.000 $0.500 $0.500 $0.484 $0.550 $0.520
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 480.000 $8.000 $6.370 $6.180 $10.500 $6.600
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 36,532.000 $0.500 $0.500 $0.484 $0.550 $0.520
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 920.000 $1.200 $1.680 $1.430 $1.250 $0.720
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
LF 136.000 $1.500 $6.370 $6.180 $6.600 $6.600
REFL PAV MRK TY I (Y)8"(SLD)(090MIL)
LF 150.000 $1.000 $0.740 $0.721 $0.650 $0.770
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 40.000 $0.350 $0.380 $0.371 $0.400 $0.400
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 17,106.000 $0.350 $0.300 $0.288 $0.400 $0.310
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 3,970.000 $0.350 $0.340 $0.330 $0.400 $0.350
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 16,656.000 $0.350 $0.300 $0.288 $0.400 $0.310
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 34.000 $10.000 $12.740 $12.360 $15.900 $13.200
PREFAB PAV MRK TY C (W) (ARROW)
EA 5.000 $300.000 $212.270 $206.000 $302.350 $220.000
PREFAB PAV MRK TY C (W) (WORD)
EA 1.000 $300.000 $318.410 $309.000 $397.800 $330.000
REFL PAV MRKR TY II-A-A
EA 417.000 $3.500 $4.250 $4.120 $6.150 $4.400
ELIM EXT PAV MRK & MRKS (4")
LF 18,266.000 $0.250 $0.500 $0.484 $1.050 $0.520
TREE TRIMMING / BRUSH REMOVAL
MI 0.460 $20,000.000 $16,012.800 $34,093.000 $13,385.750 $36,410.000
TREE REMOVAL (24" - 30" DIA)
EA 19.000 $1,500.000 $3,170.010 $447.020 $3,076.450 $477.400
TREE REMOVAL (36" - 42" DIA)
EA 2.000 $4,000.000 $4,125.220 $5,807.140 $4,031.200 $6,201.800
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $8,171.270 $8,560.000 $5,766.250 $16,500.000
Totals: $3,203,871.950 $3,015,734.972 $3,058,796.036 $3,315,452.710 $3,812,200.465