DENTON IH0035W (6465-44-001)

Items: 41

County: DENTON
Length: 0.0100 MILES
Highway: IH0035W
District: DALLAS
Control Number: 6465-44-001
DBE Goal: N/A
Project: RMC - 646544001
Guaranty: $20,000.00
Time: 365 CALENDAR DAYS
Engineer's Estimate: $999,735.50
Date: 09/11/2024 (1 year ago) Changed
Contract Number: 9241801
Type: METAL BEAM GUARD FENCE REPAIR
Project ID: A00208165
Project Description: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
AMANDA MILLER
WAYNE POWELL
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$999,735.50
$796,757.00
Over/Under Est: -20.3% -$202,978.50
Over/Under Est: -18.47% -$184,605.50
Amt Left: 2.31% $18,373.00
Over/Under Est: 11.09% $110,894.50
Amt Left: 39.39% $313,873.00
Delta: -36.25% -$295,500.00
Over/Under Est: 17.4% $173,979.50
Amt Left: 47.31% $376,958.00
Delta: -5.68% -$63,085.00
Over/Under Est: 982.94% $9,826,774.50
Amt Left: 1,258.82% $10,029,753.00
Delta: -822.41% -$9,652,795.00

Bid Items & Bid Tabulations

41 Total 0 of 41
DENTON  |  IH0035W  |  DALLAS  |  6465-44-001  |  09/11/2024  |  $999,735.50  |  RMC - 646544001  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ROSS SA ENTERPRISE LLC
BK FIELD OPERATIONS LLC
B & MS CONSTRUCTION, INC.
FIREMAN EXCAVATING, INC.
MARCOM'S MOWING SERVICE, LLC
MOBILIZATION (CALLOUT)
EA 335.000 $100.000 $1.000 $1.000 $350.000 $1.000 $150.000
TMA (STATIONARY)
DAY 335.000 $400.000 $1.000 $1.000 $290.000 $1.000 $250.000
MTL THRIE-BEAM GD FEN (STEEL POST)
LF 100.000 $50.000 $38.000 $35.000 $80.000 $20.000 $45.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $2,000.000 $1,500.000 $1,500.000 $1,700.000 $2,500.000 $2,180.000
CONNECTOR PLATE FOR THRIE BEAM
EA 2.000 $300.000 $500.000 $500.000 $850.000 $550.000 $500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,375.000 $1,800.000 $3,500.000 $2,850.000 $3,000.000 $4,500.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,500.000 $1,000.000 $1.000 $1,900.000 $750.000 $5,000.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 25.000 $45.000 $1.000 $100.000 $35.000 $30.000 $30.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 25.000 $25.000 $1.000 $100.000 $68.000 $10.000 $30.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 25.000 $25.000 $1.000 $1.000 $60.000 $10.000 $30.000
REPLACE RAIL ELEMENT (W-BEAM)
LF 6,000.000 $12.000 $33.000 $24.000 $31.500 $60.000 $28.000
REPLACE RAIL ELEMENT (THRIE-BEAM)
LF 40.000 $70.000 $25.000 $40.000 $28.000 $100.000 $55.000
REPL RAIL ELMNT(THRIE-BM TRANS TO W-BM)
EA 15.000 $75.000 $25.000 $1.000 $40.000 $100.000 $500.000
REPLACE SHORT RADIUS SYS (TL-2)
EA 150.000 $35.000 $1.000 $1.000 $75.000 $100.000 $28,900.000
REPLACE SHORT RADIUS SYS (TL-3)
EA 150.000 $35.000 $1.000 $1.000 $75.000 $100.000 $34,000.000
REPLACE TIMBER POST W/O CONC FND
EA 675.000 $25.000 $1.000 $1.000 $45.000 $1.000 $65.000
REPLACE STEEL POST W/O CONC FND
EA 75.000 $25.500 $55.000 $60.000 $65.000 $1.000 $90.000
REALIGN POSTS
EA 775.000 $48.000 $50.000 $1.000 $26.000 $1.000 $20.000
REPLACE TERMINAL ANCHOR POSTS
EA 5.000 $105.000 $1.000 $1.000 $165.000 $20.000 $500.000
REM OBSOLETE GET & REPL W/ SGT
EA 150.000 $3,175.000 $2,000.000 $3,000.000 $2,920.000 $4,500.000 $4,500.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 3.000 $500.000 $1,000.000 $500.000 $1,600.000 $1,000.000 $1,100.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 634.000 $32.500 $1.000 $25.000 $30.000 $25.000 $50.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 32.000 $80.000 $180.000 $100.000 $150.000 $20.000 $400.000
REPLACE BLOCKOUT
EA 800.000 $1.000 $0.500 $1.000 $28.000 $2.000 $20.000
REPAIR STEEL POST WITH BASE PLATE
EA 25.000 $100.000 $80.000 $1.000 $125.000 $100.000 $425.000
RESET SGT IMPACT HEAD
EA 3.000 $75.000 $100.000 $50.000 $250.000 $500.000 $150.000
REPLACE SGT OBJECT MARKER
EA 15.000 $40.000 $1.000 $1.000 $6.000 $20.000 $100.000
REPLACE SGT CABLE ANCHOR
EA 2.000 $5.500 $1.000 $1.000 $135.000 $500.000 $100.000
REPLACE SGT CABLE ASSEMBLY
EA 2.000 $5.500 $1.000 $1.000 $140.000 $500.000 $100.000
REPLACE SGT STRUT
EA 2.000 $5.500 $1.000 $1.000 $165.000 $500.000 $100.000
REPLACE DOWNSTREAM ANCHOR TERMINAL
EA 5.000 $625.000 $850.000 $1,100.000 $1,550.000 $2,000.000 $1,920.000
REPLACE POSTS (TL-3)(BRIFEN)
EA 100.000 $300.000 $450.000 $300.000 $195.000 $40.000 $280.000
REPLACE POSTS (TL-4)(GIBRALTAR)
EA 400.000 $300.000 $400.000 $300.000 $155.000 $50.000 $425.000
CABLE SPLICE / TURNBUCKLE (TL-3)
EA 5.000 $100.000 $1.000 $1.000 $220.000 $40.000 $300.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 5.000 $100.000 $1.000 $1.000 $300.000 $40.000 $300.000
REPAIR CONCRETE FOUNDATION (TL-3)
EA 2.000 $400.000 $1.000 $1.000 $110.000 $40.000 $500.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 5.000 $400.000 $1.000 $1.000 $115.000 $40.000 $500.000
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
EA 2.000 $450.000 $1,500.000 $4,000.000 $125.000 $2,000.000 $1,500.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 5.000 $550.000 $500.000 $300.000 $1,500.000 $2,000.000 $1,500.000
CHECK / RE-TENSION CABLE (TL-3)
EA 2.000 $275.000 $2,500.000 $2,000.000 $800.000 $1,000.000 $500.000
CHECK / RE-TENSION CABLE (TL-4)
EA 5.000 $275.000 $1,500.000 $500.000 $850.000 $1,000.000 $500.000
Totals: $999,735.500 $796,757.000 $815,130.000 $1,110,630.000 $1,173,715.000 $10,826,510.000