County: DENTON Highway: IH0035W Date: 12/02/2021 (2 years ago) Engineer's Estimate: $4,741,990 Control Number: 6384-04-001
Project: RMC - 638404001 District: DALLAS Time: 730 CALENDAR DAYS Type: GUARDRAIL AND CABLE BARRIER REPAIR
HCS
Pay Estimates: 1 | 2 | 3

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $4,741,990.00
FIREMAN EXCAVATING, INC.   $2,774,420.00 1
-41.49% | -$1,967,570.00
SOUTHEAST HIGHWAY GUARDRAIL & ATTENUATORS, LLC   $3,964,110.00 2
-16.4% | -$777,880.00
42.88% | $1,189,690.00
SHORT-LINE CORPORATION   $4,140,712.00 3
-12.68% | -$601,278.00
49.25% | $1,366,292.00
4.46% | $176,602.00
ELITE CASTLE RESOURCES LLC   $4,202,282.50 4
-11.38% | -$539,707.50
51.47% | $1,427,862.50
1.49% | $61,570.50
MARCOM'S MOWING SERVICE, LLC   $6,287,625.00 5
32.59% | $1,545,635.00
126.63% | $3,513,205.00
49.62% | $2,085,342.50
ROY JORGENSEN ASSOCIATES, INC.   $7,150,285.00 6
50.79% | $2,408,295.00
157.72% | $4,375,865.00
13.72% | $862,660.00

Bid Items

Items: 33, 0 filtered
DENTON IH0035W  |  DALLAS  |  6384-04-001  |  12/02/2021  |  $4,741,990  |  RMC - 638404001  |  GUARDRAIL AND CABLE BARRIER REPAIR  |  730 CALENDAR DAYS
Item code Description Unit Quantity Engineer's Estimate FIREMAN EXCAVATING, INC. SOUTHEAST HIGHWAY GUARDRAIL & ATTENUATORS, LLC SHORT-LINE CORPORATION ELITE CASTLE RESOURCES LLC MARCOM'S MOWING SERVICE, LLC ROY JORGENSEN ASSOCIATES, INC.
500 6033 MOBILIZATION (CALLOUT) EA 100.000 $500.000 $1.000 $1.000 $1.000 $5.000 $1.000 $4,000.000
540 6014 SHORT RADIUS LF 100.000 $20.000 $20.000 $33.000 $1.000 $34.000 $1,000.000 $30.000
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 40.000 $950.000 $150.000 $1,300.000 $1,200.000 $1,074.000 $1,380.000 $1,750.000
770 6001 REPAIR RAIL ELEMENT (W - BEAM) LF 40,000.000 $20.000 $1.000 $28.000 $45.000 $33.250 $30.000 $40.000
770 6002 REPAIR RAIL ELEMENT (THRIE - BEAM) LF 150.000 $25.000 $150.000 $17.000 $75.000 $51.000 $55.000 $27.000
770 6003 REP RAIL ELMNT(THRIE-BM TRANS TO W -BM) LF 100.000 $20.000 $150.000 $16.000 $75.000 $51.000 $55.000 $27.000
770 6004 REPAIR RAIL ELEMENT (CURVED RAIL) LF 600.000 $22.000 $30.000 $37.000 $25.000 $31.000 $60.000 $40.000
770 6009 REPAIR RAIL ELEMENT (T4S) LF 25.000 $30.000 $300.000 $300.000 $30.000 $23.400 $225.000 $25.000
770 6012 REM / REPL TIMBER POST W / O CONC FND EA 1,500.000 $37.000 $250.000 $40.000 $40.000 $31.200 $48.000 $37.000
770 6013 REM / REPL STEEL POST W / O CONC FND EA 200.000 $50.000 $350.000 $90.000 $60.000 $59.800 $80.000 $72.000
770 6014 REM / REPL TIMBER POST W / CONC FND EA 400.000 $125.000 $500.000 $100.000 $100.000 $31.550 $150.000 $42.000
770 6015 REM / REPL STEEL POST W / CONC FND EA 50.000 $70.000 $200.000 $68.000 $50.000 $60.250 $68.000 $100.000
770 6017 REALIGN POSTS EA 1,000.000 $10.000 $150.000 $1.000 $1.000 $1.000 $20.000 $10.000
770 6019 REMOVE & REPLACE BLOCKOUT EA 1,450.000 $10.000 $10.000 $12.000 $5.000 $15.500 $30.000 $20.000
770 6021 REPLACE SINGLE GDRAIL TERMINAL RAIL LF 1,000.000 $25.000 $5.000 $23.000 $1.000 $59.500 $40.000 $45.000
770 6022 REPLACE SINGLE GDRAIL TERMINAL POST EA 100.000 $45.000 $20.000 $80.000 $1.000 $188.800 $125.000 $90.000
770 6024 REPLACE TERMINAL ANCHOR POSTS EA 10.000 $39.000 $1.000 $100.000 $100.000 $120.000 $10.000 $1.000
770 6027 REMOVE GDRAIL END TRT / REPL WITH SGT EA 500.000 $3,200.000 $2,800.000 $2,800.000 $2,000.000 $2,000.000 $3,850.000 $4,200.000
770 6028 REPL SINGLE GDRAIL TERM IMPACT HEAD EA 50.000 $900.000 $550.000 $400.000 $1.000 $1,250.000 $1,250.000 $1,500.000
770 6029 REM & RESET SGT IMPACT HEAD EA 15.000 $120.000 $50.000 $100.000 $100.000 $800.000 $50.000 $250.000
770 6030 REPLACE SGT CABLE ASSEMBLY EA 20.000 $85.000 $50.000 $50.000 $1.000 $33.000 $250.000 $100.000
770 6031 REPLACE SGT CABLE ANCHOR EA 20.000 $85.000 $50.000 $50.000 $1.000 $45.000 $250.000 $100.000
770 6032 REPLACE SGT STRUT EA 10.000 $85.000 $50.000 $100.000 $1.000 $62.000 $250.000 $100.000
771 6001 REPLACE POSTS (TL-3) EA 50.000 $80.000 $400.000 $200.000 $150.000 $150.000 $200.000 $200.000
771 6002 REPLACE POSTS (TL-4) EA 250.000 $145.000 $450.000 $200.000 $250.000 $150.000 $480.000 $275.000
771 6011 CHECK / RE-TENSION CABLE EA 10.000 $500.000 $100.000 $500.000 $500.000 $300.000 $250.000 $500.000
774 6029 REPAIR (QUAD) (W) (BAY) EA 10.000 $1,000.000 $100.000 $1,500.000 $500.000 $750.000 $3,000.000 $1,100.000
774 6044 REMOVE AND REPLACE (SMTC) (N) EA 50.000 $25,000.000 $1,000.000 $12,500.000 $10,000.000 $12,500.000 $28,500.000 $28,000.000
774 6046 REMOVE AND REPLACE (SMTC) (W) EA 10.000 $30,000.000 $3,000.000 $15,000.000 $15,000.000 $10,100.000 $48,620.000 $38,270.000
774 6068 REPAIR (SMTC) (N) LF 600.000 $300.000 $150.000 $300.000 $500.000 $755.000 $300.000 $400.000
774 6112 REPAIR (SMTC) (W) LF 400.000 $100.000 $200.000 $300.000 $250.000 $755.000 $300.000 $400.000
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 2.000 $5,500.000 $10,000.000 $1,000.000 $1.000 $650.000 $500.000 $5,000.000
6185 6002 TMA (STATIONARY) DAY 1,560.000 $110.000 $1.000 $1.000 $1.000 $1.000 $150.000 $250.000
Totals: $4,741,990.00 $2,774,420.00 $3,964,110.00 $4,140,712.00 $4,202,282.50 $6,287,625.00 $7,150,285.00