|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
134.000
|
$435.000
|
$300.000
|
$400.000
|
|
|
RAIL (TY T631)
|
LF
|
100.000
|
$115.000
|
$50.000
|
$90.000
|
|
|
RETROFIT RAIL (TY T131RC)
|
LF
|
200.000
|
$175.000
|
$50.000
|
$195.000
|
|
|
MOBILIZATION (CALLOUT)
|
EA
|
100.000
|
$350.000
|
$1.000
|
$1.000
|
|
|
CONC CURB (DOWEL) (TY II)
|
LF
|
300.000
|
$35.000
|
$25.000
|
$55.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
500.000
|
$35.000
|
$27.000
|
$35.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
24.000
|
$1,650.000
|
$1,000.000
|
$1,700.000
|
|
|
TRANSITION ADJUSTMENT
|
EA
|
5.000
|
$550.000
|
$400.000
|
$500.000
|
|
|
SHORT RADIUS
|
LF
|
100.000
|
$25.000
|
$20.000
|
$55.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
40.000
|
$1,500.000
|
$1,080.610
|
$1,100.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
LF
|
400.000
|
$30.000
|
$20.000
|
$30.000
|
|
|
MTL BM GD FEN TRANS (NON - SYM)
|
EA
|
8.000
|
$1,150.000
|
$500.000
|
$950.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,000.000
|
$3.250
|
$1.000
|
$3.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
8.000
|
$2,995.000
|
$4,015.250
|
$4,000.000
|
|
|
GUARDRAIL END TREATMENT (MOVE & RESET)
|
EA
|
10.000
|
$325.000
|
$480.000
|
$500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
10.000
|
$325.000
|
$280.000
|
$500.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
8.000
|
$2,750.000
|
$13,125.000
|
$5,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
10.000
|
$25,200.000
|
$28,154.000
|
$25,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
|
EA
|
10.000
|
$38,000.000
|
$25,287.000
|
$35,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
|
EA
|
8.000
|
$15,000.000
|
$25,690.000
|
$25,000.000
|
|
|
CHN LNK FNCE(PVC-COATD)(8' MESH)(INSTL)
|
LF
|
50.000
|
$30.000
|
$25.000
|
$1.000
|
|
|
CHAIN LINK FENCE (INSTALL) (4')
|
LF
|
100.000
|
$30.000
|
$20.000
|
$15.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
500.000
|
$25.000
|
$28.000
|
$30.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
75.000
|
$31.000
|
$20.000
|
$30.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
100.000
|
$30.000
|
$20.000
|
$30.000
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2
|
EA
|
100.000
|
$19.000
|
$20.000
|
$1.000
|
|
|
INSTL DEL ASSM (D-DY)SZ 1(BRF)GF2
|
EA
|
50.000
|
$21.000
|
$20.000
|
$1.000
|
|
|
REPAIR RAIL ELEMENT (W - BEAM)
|
LF
|
25,000.000
|
$18.000
|
$22.000
|
$21.500
|
|
|
REPAIR RAIL ELEMENT (THRIE - BEAM)
|
LF
|
150.000
|
$26.000
|
$1.000
|
$60.000
|
|
|
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
|
LF
|
100.000
|
$20.000
|
$1.000
|
$60.000
|
|
|
REPAIR RAIL ELEMENT (CURVED RAIL)
|
LF
|
500.000
|
$50.000
|
$20.000
|
$45.000
|
|
|
REPAIR RAIL ELEMENT (T4S)
|
LF
|
25.000
|
$50.000
|
$30.000
|
$300.000
|
|
|
REM / REPL TIMBER POST W / O CONC FND
|
EA
|
1,500.000
|
$60.000
|
$50.000
|
$48.000
|
|
|
REM / REPL STEEL POST W / O CONC FND
|
EA
|
200.000
|
$66.000
|
$68.000
|
$100.000
|
|
|
REM / REPL TIMBER POST W / CONC FND
|
EA
|
50.000
|
$51.000
|
$100.000
|
$100.000
|
|
|
REM / REPL STEEL POST W / CONC FND
|
EA
|
50.000
|
$92.000
|
$68.000
|
$100.000
|
|
|
REALIGN POSTS
|
EA
|
1,000.000
|
$20.000
|
$1.000
|
$1.000
|
|
|
REMOVE & REPLACE BLOCKOUT
|
EA
|
1,450.000
|
$10.500
|
$8.000
|
$10.000
|
|
|
REPLACE SINGLE GDRAIL TERMINAL RAIL
|
LF
|
1,000.000
|
$32.000
|
$20.000
|
$100.000
|
|
|
REPLACE SINGLE GDRAIL TERMINAL POST
|
EA
|
500.000
|
$35.000
|
$100.000
|
$1.000
|
|
|
REPLACE TERMINAL ANCHOR POSTS
|
EA
|
5.000
|
$150.000
|
$100.000
|
$1.000
|
|
|
RESET HINGED TOP SGT STL POST
|
EA
|
100.000
|
$60.000
|
$1.000
|
$125.000
|
|
|
REMOVE GDRAIL END TRT / REPL WITH SGT
|
EA
|
200.000
|
$3,000.000
|
$3,550.000
|
$2,850.000
|
|
|
REPL SINGLE GDRAIL TERM IMPACT HEAD
|
EA
|
100.000
|
$1,200.000
|
$100.000
|
$750.000
|
|
|
REM & RESET SGT IMPACT HEAD
|
EA
|
50.000
|
$129.000
|
$100.000
|
$1.000
|
|
|
REPLACE SGT CABLE ASSEMBLY
|
EA
|
75.000
|
$110.000
|
$10.000
|
$100.000
|
|
|
REPLACE SGT CABLE ANCHOR
|
EA
|
75.000
|
$110.000
|
$10.000
|
$100.000
|
|
|
REPLACE SGT STRUT
|
EA
|
20.000
|
$300.000
|
$250.000
|
$1,000.000
|
|
|
REPLACE SGT OBJECT MARKER
|
EA
|
100.000
|
$50.000
|
$10.000
|
$50.000
|
|
|
REPAIR STEEL POST WITH BASE PLATE
|
EA
|
10.000
|
$300.000
|
$250.000
|
$300.000
|
|
|
REPLACE POSTS (TL-3)
|
EA
|
200.000
|
$100.000
|
$50.000
|
$80.000
|
|
|
REPLACE POSTS (TL-4)
|
EA
|
500.000
|
$110.000
|
$135.000
|
$200.000
|
|
|
CABLE SPLICE / TURNBUCKLE (TL-3)
|
EA
|
2.000
|
$250.000
|
$10.000
|
$50.000
|
|
|
CABLE SPLICE / TURNBUCKLE (TL-4)
|
EA
|
4.000
|
$250.000
|
$150.000
|
$500.000
|
|
|
REPAIR CONCRETE FOUNDATION (TL-3)
|
EA
|
2.000
|
$200.000
|
$25.000
|
$1.000
|
|
|
REPAIR CONCRETE FOUNDATION (TL-4)
|
EA
|
2.000
|
$200.000
|
$25.000
|
$1.000
|
|
|
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
|
EA
|
4.000
|
$800.000
|
$25.000
|
$200.000
|
|
|
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
|
EA
|
5.000
|
$2,500.000
|
$500.000
|
$1,500.000
|
|
|
REPLACE CABLE (TL-3)
|
LF
|
100.000
|
$8.000
|
$3.000
|
$3.000
|
|
|
REPLACE CABLE (TL-4)
|
LF
|
100.000
|
$8.000
|
$3.000
|
$6.000
|
|
|
CHECK / RE-TENSION CABLE
|
EA
|
10.000
|
$1,000.000
|
$500.000
|
$200.000
|
|
|
RMV/REPL(VIA-SAND FILL PLASTIC BARRELS)
|
EA
|
25.000
|
$450.000
|
$280.000
|
$500.000
|
|
|
REPAIR (TRACC)
|
EA
|
5.000
|
$3,500.000
|
$3,500.000
|
$2,000.000
|
|
|
REPAIR (WIDE TRACC)
|
LF
|
50.000
|
$150.000
|
$50.000
|
$500.000
|
|
|
REPAIR REACT (N) (FRONT SECTION)
|
EA
|
2.000
|
$3,000.000
|
$500.000
|
$100.000
|
|
|
REPAIR REACT (N) (CYLINDERS)
|
EA
|
4.000
|
$3,500.000
|
$1,000.000
|
$2,000.000
|
|
|
REPAIR (QUAD) (N) (BAY)
|
EA
|
10.000
|
$1,500.000
|
$1,000.000
|
$1,100.000
|
|
|
REPAIR (QUAD) (W) (BAY)
|
EA
|
10.000
|
$1,500.000
|
$1,000.000
|
$1,100.000
|
|
|
REPAIR (REACT 350) (W)
|
EA
|
2.000
|
$5,000.000
|
$2,000.000
|
$5,000.000
|
|
|
REPAIR (ENERGY ABSORB SYS) (GDRAIL)
|
EA
|
2.000
|
$1,000.000
|
$500.000
|
$3,500.000
|
|
|
REPAIR (GREAT SYS) (BAY)
|
EA
|
25.000
|
$1,000.000
|
$100.000
|
$100.000
|
|
|
REPAIR REACT (CYLINDERS)
|
EA
|
2.000
|
$3,500.000
|
$250.000
|
$5,000.000
|
|
|
REPAIR REACT (W) (CYLINDERS)
|
EA
|
2.000
|
$3,500.000
|
$250.000
|
$5,000.000
|
|
|
REPAIR (QUAD - ELITE) NARROW (BAY)
|
EA
|
5.000
|
$2,500.000
|
$1,000.000
|
$100.000
|
|
|
REPAIR (QUAD - ELITE) WIDE (BAY)
|
EA
|
2.000
|
$2,500.000
|
$1,300.000
|
$100.000
|
|
|
REMOVE / REPLACE (QUAD - ELITE) NARROW
|
EA
|
5.000
|
$25,000.000
|
$6,497.000
|
$20,000.000
|
|
|
REPAIR (QUADGUARD - ELITE) (CYLINDER)
|
EA
|
1.000
|
$3,500.000
|
$2,500.000
|
$3,000.000
|
|
|
REMOVE AND REPLACE (SMTC) (N)
|
EA
|
10.000
|
$25,000.000
|
$29,487.000
|
$24,999.000
|
|
|
REMOVE AND REPLACE (SMTC) (W)
|
EA
|
10.000
|
$30,000.000
|
$38,267.000
|
$30,000.000
|
|
|
REPAIR (FASTRACC) (BAY)
|
EA
|
1.000
|
$600.000
|
$500.000
|
$500.000
|
|
|
REPAIR (FASTRACC) (W) (BAY)
|
EA
|
1.000
|
$1,000.000
|
$500.000
|
$500.000
|
|
|
REPAIR (BEAT - SSCC)
|
EA
|
1.000
|
$1,500.000
|
$500.000
|
$2,500.000
|
|
|
REPAIR (TRACC) (BAY)
|
EA
|
5.000
|
$625.000
|
$400.000
|
$500.000
|
|
|
REPAIR (WIDE TRACC) (BAY)
|
EA
|
1.000
|
$800.000
|
$800.000
|
$500.000
|
|
|
REPAIR (SMTC) (N)
|
LF
|
400.000
|
$150.000
|
$300.000
|
$400.000
|
|
|
REMOVE AND REPLACE TAU II (W)
|
EA
|
5.000
|
$32,000.000
|
$5,749.000
|
$15,000.000
|
|
|
QUAD FENDER PANEL
|
EA
|
2.000
|
$1,000.000
|
$800.000
|
$100.000
|
|
|
REACT CABLE 350 (6 BAY)
|
EA
|
2.000
|
$1,500.000
|
$500.000
|
$100.000
|
|
|
REPAIR (NARROW REACT 350)
|
EA
|
5.000
|
$5,000.000
|
$500.000
|
$100.000
|
|
|
REPAIR (SMTC) (W)
|
LF
|
400.000
|
$300.000
|
$250.000
|
$400.000
|
|
|
REPAIR (TAU)(II)(W)(BAY)
|
EA
|
5.000
|
$1,500.000
|
$500.000
|
$100.000
|
|
|
REMOVE AND REPLACE (QUADGUARD)(MASH)(N)
|
EA
|
10.000
|
$22,000.000
|
$4,983.000
|
$15,000.000
|
|
|
REPAIR (QUADGUARD)(MASH)(N)
|
LF
|
200.000
|
$100.000
|
$102.140
|
$100.000
|
|
|
REMOVE AND REPLACE (TAU)(MASH)(N)
|
EA
|
10.000
|
$22,000.000
|
$2,648.000
|
$15,000.000
|
|
|
REPAIR (TAU)(MASH)(N)
|
LF
|
200.000
|
$250.000
|
$150.000
|
$100.000
|
|
|
REP METAL POST W/ BASE PLATE(T101 RAIL)
|
EA
|
5.000
|
$400.000
|
$180.000
|
$350.000
|
|
|
REPAIR(STEEL POST W/ CHANNEL IRON RAIL)
|
LF
|
20.000
|
$100.000
|
$98.000
|
$150.000
|
|
|
REM AND RESET MTL BM GD FENCE
|
LF
|
500.000
|
$31.000
|
$10.150
|
$10.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$7,500.000
|
$8,156.140
|
$18,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
816.000
|
$275.000
|
$1.500
|
$1.000
|
|
|
CLEANING GUARDRAIL
|
LF
|
100.000
|
$5.000
|
$10.100
|
$20.000
|
|
|
CLEANING ATTENUATOR
|
LF
|
30.000
|
$250.000
|
$10.150
|
$300.000
|
|
Totals: |
$4,667,025.000
|
$3,826,340.180
|
$4,356,765.000
|