PREPARING ROW
|
STA
|
318.000
|
$1,200.000
|
$400.000
|
$1,900.000
|
$750.000
|
$250.000
|
$3,375.810
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
35.000
|
$12.000
|
$35.000
|
$82.000
|
$52.500
|
$140.000
|
$11.250
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
1,902.000
|
$17.680
|
$20.000
|
$14.000
|
$21.000
|
$11.500
|
$16.880
|
|
|
REMOV STAB BASE AND ASPH PAV (0"-12")
|
SY
|
16,694.000
|
$14.000
|
$13.000
|
$3.500
|
$8.400
|
$15.000
|
$13.500
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
28,165.540
|
$11.500
|
$28.000
|
$7.500
|
$13.650
|
$35.000
|
$12.380
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
16,103.925
|
$15.420
|
$41.000
|
$9.000
|
$21.000
|
$17.000
|
$16.880
|
|
|
BACKFILL (TY A OR B)
|
STA
|
318.000
|
$220.000
|
$400.000
|
$160.000
|
$157.500
|
$260.000
|
$196.920
|
|
|
BLADING
|
STA
|
318.000
|
$223.000
|
$145.000
|
$95.000
|
$1,500.000
|
$100.000
|
$196.920
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
205,015.000
|
$1.200
|
$0.940
|
$1.050
|
$0.940
|
$1.750
|
$1.130
|
|
|
BLOCK SODDING
|
SY
|
15,000.000
|
$4.360
|
$4.580
|
$6.000
|
$4.580
|
$6.000
|
$5.630
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
190,015.000
|
$0.200
|
$0.150
|
$0.150
|
$0.150
|
$1.400
|
$1.130
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
95,007.000
|
$0.180
|
$0.100
|
$0.150
|
$0.100
|
$1.250
|
$1.130
|
|
|
VEGETATIVE WATERING
|
MG
|
45,747.000
|
$2.500
|
$0.250
|
$0.010
|
$2.100
|
$1.000
|
$28.130
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
|
SY
|
800.000
|
$150.000
|
$120.000
|
$150.000
|
$157.500
|
$110.000
|
$112.530
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
77,733.000
|
$2.050
|
$1.500
|
$2.020
|
$3.150
|
$2.000
|
$3.380
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
211.000
|
$2.500
|
$10.000
|
$10.000
|
$20.000
|
$13.750
|
$11.250
|
|
|
TEMPORARY SPL SHORING
|
SF
|
2,833.000
|
$31.800
|
$23.000
|
$40.000
|
$75.000
|
$24.250
|
$94.610
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
41.000
|
$500.000
|
$650.000
|
$650.000
|
$840.000
|
$1,000.000
|
$478.240
|
|
|
RIPRAP (STONE COMMON)(GROUT)(18 IN)
|
CY
|
319.000
|
$205.000
|
$339.000
|
$325.000
|
$435.000
|
$380.000
|
$281.320
|
|
|
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
|
LF
|
51.000
|
$540.000
|
$1,140.000
|
$1,240.000
|
$650.000
|
$850.000
|
$1,350.320
|
|
|
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
|
LF
|
22.000
|
$750.000
|
$1,295.000
|
$1,395.000
|
$660.000
|
$1,100.000
|
$1,350.320
|
|
|
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
|
LF
|
60.000
|
$720.000
|
$1,275.000
|
$1,375.000
|
$710.000
|
$950.000
|
$1,350.320
|
|
|
CONC BOX CULV (8 FT X 4 FT)(EXTEND)
|
LF
|
43.000
|
$780.000
|
$1,500.000
|
$1,650.000
|
$805.000
|
$1,300.000
|
$1,350.320
|
|
|
CONC BOX CULV (8 FT X 5 FT)(EXTEND)
|
LF
|
78.000
|
$1,100.000
|
$1,630.000
|
$1,690.000
|
$760.000
|
$1,300.000
|
$1,687.900
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
2,142.000
|
$65.000
|
$55.000
|
$60.000
|
$75.000
|
$135.000
|
$61.410
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
698.000
|
$86.000
|
$75.000
|
$85.000
|
$95.000
|
$155.000
|
$94.210
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
80.000
|
$120.000
|
$108.000
|
$122.000
|
$140.000
|
$180.000
|
$135.790
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
179.000
|
$154.800
|
$158.000
|
$175.000
|
$250.000
|
$320.000
|
$191.060
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
89.000
|
$200.000
|
$227.000
|
$250.000
|
$500.000
|
$380.000
|
$251.100
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
2.000
|
$15,400.000
|
$6,000.000
|
$6,500.000
|
$1,000.000
|
$9,000.000
|
$13,503.230
|
|
|
HEADWALL (CH - PW - 0) (DIA= 36 IN)
|
EA
|
4.000
|
$8,500.000
|
$9,000.000
|
$9,000.000
|
$12,000.000
|
$9,000.000
|
$16,879.030
|
|
|
HEADWALL (CH - PW - 0) (DIA= 42 IN)
|
EA
|
4.000
|
$7,450.000
|
$11,250.000
|
$12,000.000
|
$15,000.000
|
$15,000.000
|
$16,879.030
|
|
|
HEADWALL (CH - PW - S) (DIA= 42 IN)
|
EA
|
2.000
|
$10,000.000
|
$15,000.000
|
$15,000.000
|
$20,000.000
|
$26,000.000
|
$22,505.380
|
|
|
WINGWALL (PW - 2) (HW=6 FT)
|
EA
|
8.000
|
$17,500.000
|
$21,125.000
|
$21,125.000
|
$22,000.000
|
$25,000.000
|
$28,131.720
|
|
|
WINGWALL (PW - 2) (HW=7 FT)
|
EA
|
4.000
|
$19,820.000
|
$31,500.000
|
$31,500.000
|
$28,000.000
|
$35,000.000
|
$33,758.070
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
111.000
|
$816.500
|
$1,230.000
|
$1,300.000
|
$1,000.000
|
$2,000.000
|
$1,010.210
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
30.000
|
$1,400.000
|
$1,400.000
|
$1,600.000
|
$1,700.000
|
$2,800.000
|
$1,683.680
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$3,200.000
|
$4,100.000
|
$4,400.000
|
$4,300.000
|
$4,700.000
|
$4,607.980
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
4.000
|
$2,746.000
|
$2,400.000
|
$2,500.000
|
$2,900.000
|
$4,600.000
|
$4,099.920
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$5,300.000
|
$4,600.000
|
$5,000.000
|
$7,500.000
|
$6,900.000
|
$8,050.170
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
14.000
|
$2,050.000
|
$2,000.000
|
$2,100.000
|
$2,500.000
|
$3,100.000
|
$2,250.540
|
|
|
REMOV STR (WINGWALL)
|
EA
|
12.000
|
$1,800.000
|
$800.000
|
$800.000
|
$2,500.000
|
$1,100.000
|
$2,250.540
|
|
|
REMOV STR (HEADWALL)
|
EA
|
2.000
|
$1,250.000
|
$1,000.000
|
$1,000.000
|
$1,500.000
|
$1,400.000
|
$2,250.540
|
|
|
REMOV STR (PIPE)
|
LF
|
68.000
|
$23.900
|
$20.000
|
$20.000
|
$50.000
|
$31.750
|
$28.130
|
|
|
REMOV STR (SMALL)
|
EA
|
76.000
|
$370.000
|
$600.000
|
$600.000
|
$1,150.000
|
$670.000
|
$2,813.170
|
|
|
REMOVING ROCK RIPRAP
|
LF
|
320.000
|
$52.500
|
$70.870
|
$75.000
|
$20.000
|
$18.500
|
$135.030
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$850,000.000
|
$625,000.000
|
$900,000.000
|
$994,000.000
|
$790,000.000
|
$1,181,532.420
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$14,000.000
|
$22,000.000
|
$12,000.000
|
$52,500.000
|
$30,000.000
|
$16,879.030
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
2,509.000
|
$32.000
|
$36.160
|
$50.000
|
$37.280
|
$40.250
|
$30.400
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
2,509.000
|
$12.000
|
$11.150
|
$15.000
|
$13.650
|
$12.500
|
$10.010
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
399.000
|
$23.000
|
$38.970
|
$30.000
|
$27.830
|
$20.000
|
$24.040
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
399.000
|
$9.600
|
$10.720
|
$10.000
|
$10.500
|
$5.000
|
$7.580
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
5,504.000
|
$3.020
|
$3.280
|
$3.500
|
$2.730
|
$3.600
|
$3.070
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
5,504.000
|
$0.720
|
$0.770
|
$0.100
|
$0.630
|
$0.850
|
$0.730
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
4,682.000
|
$5.200
|
$4.880
|
$5.000
|
$4.410
|
$5.400
|
$4.560
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
4,682.000
|
$1.090
|
$0.770
|
$1.000
|
$0.890
|
$0.850
|
$1.360
|
|
|
DRIVEWAYS (ACP)
|
SY
|
8,505.000
|
$52.000
|
$44.650
|
$59.680
|
$51.000
|
$45.000
|
$47.040
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
1,542.000
|
$150.000
|
$126.000
|
$115.000
|
$135.000
|
$120.000
|
$79.430
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
45,616.000
|
$0.200
|
$0.260
|
$0.220
|
$0.250
|
$0.250
|
$0.060
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
17,924.000
|
$0.200
|
$0.260
|
$0.220
|
$0.250
|
$0.250
|
$0.070
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
802.000
|
$30.000
|
$26.000
|
$39.000
|
$27.300
|
$29.000
|
$35.450
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$3,200.000
|
$2,625.000
|
$3,350.000
|
$2,756.250
|
$2,900.000
|
$3,319.540
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
30.000
|
$320.000
|
$320.000
|
$285.000
|
$299.250
|
$360.000
|
$356.710
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
1.000
|
$753.000
|
$720.000
|
$725.000
|
$761.250
|
$800.000
|
$872.080
|
|
|
GROUND BOX TY BATTERY (162915)W/APRON
|
EA
|
1.000
|
$2,275.000
|
$2,500.000
|
$4,000.000
|
$3,000.000
|
$2,800.000
|
$11,252.690
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
77.000
|
$750.000
|
$585.000
|
$617.000
|
$647.850
|
$650.000
|
$786.560
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
21.000
|
$30.000
|
$25.000
|
$26.000
|
$26.250
|
$27.750
|
$24.760
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
56.000
|
$90.000
|
$68.000
|
$45.000
|
$47.250
|
$44.500
|
$90.020
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
52,240.000
|
$0.950
|
$1.100
|
$0.010
|
$1.000
|
$2.800
|
$2.250
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
180.000
|
$1.110
|
$1.050
|
$2.000
|
$2.100
|
$1.200
|
$2.250
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
465.000
|
$7.570
|
$7.900
|
$5.690
|
$7.350
|
$8.800
|
$7.880
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
2.000
|
$154.000
|
$154.000
|
$110.000
|
$160.650
|
$170.000
|
$172.170
|
|
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
|
EA
|
2.000
|
$190.000
|
$220.000
|
$160.000
|
$315.000
|
$240.000
|
$337.580
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
1.000
|
$174.000
|
$184.000
|
$118.000
|
$196.350
|
$200.000
|
$210.430
|
|
|
PAVEMENT SEALER 4"
|
LF
|
2,972.000
|
$0.190
|
$0.130
|
$0.190
|
$0.370
|
$0.140
|
$0.390
|
|
|
PAVEMENT SEALER 8"
|
LF
|
180.000
|
$0.300
|
$0.260
|
$0.280
|
$1.050
|
$0.300
|
$1.130
|
|
|
PAVEMENT SEALER 24"
|
LF
|
283.000
|
$0.900
|
$1.500
|
$0.750
|
$3.150
|
$1.700
|
$3.380
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
2.000
|
$30.000
|
$29.000
|
$19.000
|
$42.000
|
$32.250
|
$45.010
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
1.000
|
$33.000
|
$35.000
|
$19.000
|
$54.600
|
$38.750
|
$58.510
|
|
|
PAVEMENT SEALER (DBL ARROW)
|
EA
|
2.000
|
$21.000
|
$43.000
|
$22.000
|
$115.500
|
$47.750
|
$123.780
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
66,458.000
|
$0.470
|
$0.500
|
$0.430
|
$0.460
|
$0.550
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
4,472.000
|
$0.560
|
$0.590
|
$0.460
|
$0.770
|
$0.650
|
$0.820
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
44,911.000
|
$0.480
|
$0.500
|
$0.430
|
$0.460
|
$0.550
|
$0.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
842.000
|
$5.200
|
$5.200
|
$3.400
|
$4.690
|
$5.800
|
$5.030
|
|
REFL PAV MRKR TY II-C-C
|
EA
|
10.000
|
$0.400
|
$5.350
|
$4.000
|
$9.940
|
$5.900
|
$10.660
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
2,972.000
|
$0.100
|
$0.020
|
$0.140
|
$0.600
|
$0.020
|
$0.640
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
180.000
|
$0.200
|
$0.070
|
$0.250
|
$2.100
|
$0.080
|
$2.250
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
318.000
|
$0.700
|
$0.560
|
$0.500
|
$6.300
|
$0.600
|
$6.750
|
|
|
RELOCT RDSD FLSH BCN AM (SOLAR PWRD)
|
EA
|
1.000
|
$3,500.000
|
$4,500.000
|
$8,000.000
|
$8,000.000
|
$5,000.000
|
$11,252.690
|
|
|
FULL - WIDTH MOWING
|
CYC
|
3.000
|
$2,630.000
|
$5,500.000
|
$3,500.000
|
$6,000.000
|
$11,000.000
|
$4,501.080
|
|
|
SP MIXES SP-B SAC-B PG64-22
|
TON
|
13,992.000
|
$117.900
|
$109.500
|
$112.000
|
$115.000
|
$102.000
|
$126.590
|
|
|
SP MIXES SP-C SAC-B PG64-22
|
TON
|
11,660.000
|
$150.000
|
$110.500
|
$130.000
|
$117.000
|
$105.000
|
$124.340
|
|
|
TACK COAT
|
GAL
|
14,311.000
|
$3.560
|
$3.250
|
$4.000
|
$3.000
|
$4.500
|
$0.280
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$6,883.230
|
$20,000.000
|
$9,500.000
|
$25,000.000
|
$30,000.000
|
$5,626.340
|
|
|
TMA (STATIONARY)
|
DAY
|
248.000
|
$97.430
|
$330.000
|
$1,300.000
|
$100.000
|
$250.000
|
$168.790
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
160.000
|
$63.970
|
$100.000
|
$150.000
|
$100.000
|
$40.000
|
$112.530
|
|
Totals: |
$8,979,831.494
|
$8,970,766.905
|
$9,059,188.905
|
$9,979,130.726
|
$9,997,936.345
|
$12,199,404.189
|