DENTON CS (0918-46-299)

Items: 66

County: DENTON
Length: N/A
Highway: CS
District: DALLAS
Control Number: 0918-46-299
DBE Goal: N/A
Project: BR 2019(601)
Guaranty: N/A
Time: 165 WORKING DAYS
Engineer's Estimate: $2,749,477.70
Date: 05/05/2022 (4 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (5)
E
Engineer's Estimate
$2,749,477.70
$2,851,250.80
Over/Under Est: 3.7% $101,773.10
Over/Under Est: 8.2% $225,555.70
Amt Left: 4.34% $123,782.60
Over/Under Est: 9.56% $262,753.85
Amt Left: 5.65% $160,980.75
Delta: -1.25% -$37,198.15
Over/Under Est: 17.92% $492,813.29
Amt Left: 13.71% $391,040.19
Delta: -7.64% -$230,059.44
$3,275,581.50
Over/Under Est: 19.13% $526,103.80
Amt Left: 14.88% $424,330.70
Delta: -1.03% -$33,290.51

Bid Items & Bid Tabulations

66 Total 0 of 66
DENTON  |  CS  |  DALLAS  |  0918-46-299  |  05/05/2022  |  $2,749,477.70  |  BR 2019(601)  |  BRIDGE REPL  |  165 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SEMA CONSTRUCTION, INC.
HODGES AND SON CONSTRUCTION COMPANY, INC.
INDUS ROAD & BRIDGE, INC.
ED BELL CONSTRUCTION COMPANY
EARTH BUILDERS, L.P.
PREPARING ROW
STA 10.860 $8,000.000 $16,410.000 $5,500.000 $2,900.000 $19,000.000 $20,000.000
REMOVING STAB BASE & ASPH PAV (10"-12")
SY 1,815.000 $8.000 $8.000 $10.000 $17.000 $10.000 $5.000
REMOVING STAB BASE AND ASPH PAV (4")
SY 131.000 $15.000 $8.000 $10.000 $36.000 $20.000 $2.000
EXCAVATION (ROADWAY)
CY 1,319.000 $20.000 $9.000 $20.000 $31.000 $25.000 $20.000
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
CY 1,466.000 $15.000 $5.000 $25.000 $37.000 $25.000 $30.000
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
CY 60.000 $35.000 $48.000 $30.000 $115.000 $75.000 $30.000
COMPOST MANUF TOPSOIL (4")
SY 4,531.000 $2.000 $1.450 $3.000 $3.600 $2.100 $2.000
BLOCK SODDING
SY 4,531.000 $4.000 $4.750 $6.000 $5.250 $3.150 $5.000
DRILL SEED (TEMP)(WARM OR COOL)
SY 4,531.000 $0.500 $0.200 $0.500 $0.300 $0.100 $0.500
VEGETATIVE WATERING
MG 1,348.100 $15.000 $8.000 $1.000 $16.000 $1.050 $45.000
FL BS (CMP IN PLACE) (TY D GR 1-2)(15")
SY 2,365.000 $37.000 $24.000 $40.000 $35.000 $45.000 $45.000
PRIME COAT (MS-2 OR SS-1)
GAL 473.000 $6.000 $13.300 $14.000 $9.000 $13.850 $15.000
ASPH (CRS-2P)
GAL 394.000 $10.000 $16.500 $16.000 $15.000 $16.770 $18.000
ASPH (RC-250)
GAL 221.000 $8.000 $38.000 $38.000 $34.000 $39.250 $40.000
AGGR (TY-B GR-5 OR TY-L GR-5)
CY 6.000 $250.000 $1,100.000 $1,500.000 $2,500.000 $1,065.000 $1,500.000
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
GAL 331.000 $12.000 $25.500 $25.000 $23.000 $26.090 $25.000
AGGR (TY-B GR-4 OR TY-L GR-4 SAC-B)
CY 6.000 $250.000 $840.000 $1,000.000 $2,360.000 $852.000 $1,000.000
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
CY 8.000 $200.000 $980.000 $1,000.000 $1,780.000 $1,011.750 $1,000.000
CEM STABIL BKFL
CY 150.000 $200.000 $120.000 $220.000 $237.000 $275.000 $250.000
DRILL SHAFT (24 IN)
LF 114.000 $200.000 $220.000 $220.000 $200.000 $215.000 $225.000
DRILL SHAFT (36 IN)
LF 811.000 $200.000 $250.000 $195.000 $225.000 $260.000 $275.000
CL C CONC (ABUT)(HPC)
CY 75.000 $1,000.000 $1,100.000 $1,200.000 $1,020.000 $1,500.000 $1,250.000
CL C CONC (CAP)(HPC)
CY 74.500 $1,000.000 $1,000.000 $1,200.000 $1,300.000 $1,500.000 $1,250.000
CL C CONC (COLUMN)(HPC)
CY 61.300 $1,100.000 $1,100.000 $1,200.000 $1,200.000 $1,500.000 $1,250.000
REINF CONC SLAB (HPC)
SF 13,440.000 $19.500 $19.000 $24.000 $21.000 $25.000 $25.000
REINF CONC SLAB (SLAB BEAM)(HPC)
SF 1,606.000 $20.000 $15.500 $20.000 $24.000 $30.000 $20.000
APPROACH SLAB (HPC)
CY 133.000 $560.000 $600.000 $800.000 $850.000 $700.000 $800.000
PRESTR CONC SLAB BEAM (4SB15)
LF 395.380 $200.000 $240.000 $235.000 $295.000 $275.000 $250.000
PRESTR CONC GIRDER (TX28)
LF 1,587.500 $180.000 $225.000 $235.000 $225.000 $250.000 $225.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 380.000 $145.000 $120.000 $150.000 $125.000 $105.000 $125.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 2,342.000 $150.000 $115.000 $145.000 $125.000 $105.000 $125.000
RIPRAP (MOW STRIP)(4 IN)
CY 74.000 $450.000 $525.000 $500.000 $600.000 $700.000 $650.000
RAIL (TY T223)(HPC)
LF 816.000 $120.000 $125.000 $140.000 $160.000 $145.000 $150.000
SEALED EXPANSION JOINT (4 IN) (SEJ - B)
LF 125.000 $130.000 $110.000 $120.000 $150.000 $150.000 $150.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $30,000.000 $75,000.000 $20,000.000 $35,000.000 $15,000.000 $25,000.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $65,000.000 $150,000.000 $150,000.000 $70,000.000 $110,000.000 $125,000.000
MOBILIZATION
LS 1.000 $236,770.700 $285,000.000 $265,000.000 $284,384.220 $325,000.000 $300,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $14,500.000 $3,500.000 $8,500.000 $5,700.000 $5,250.000 $2,500.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 72.000 $50.000 $45.000 $1.000 $185.000 $45.000 $70.000
ROCK FILTER DAMS (REMOVE)
LF 72.000 $12.000 $12.000 $1.000 $70.000 $22.500 $25.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 655.000 $25.000 $17.000 $1.000 $34.000 $10.500 $35.000
CONSTRUCTION EXITS (REMOVE)
SY 655.000 $7.000 $9.500 $1.000 $8.000 $5.250 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,160.000 $3.000 $1.750 $1.000 $4.000 $2.000 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,160.000 $1.000 $0.450 $1.000 $1.000 $0.250 $1.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 792.000 $6.000 $4.000 $5.000 $10.000 $7.500 $6.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 792.000 $1.250 $1.000 $1.000 $1.000 $1.500 $1.000
DRIVEWAYS (ACP)
SY 84.000 $55.000 $35.000 $50.000 $170.000 $79.570 $75.000
MTL W-BEAM GD FEN (TIM POST)
LF 600.000 $27.000 $23.000 $30.000 $25.000 $25.560 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $2,000.000 $1,900.000 $1,800.000 $2,150.000 $2,923.250 $2,000.000
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $2,625.000 $3,000.000 $3,100.000 $3,300.000 $3,439.950 $3,250.000
MAILBOX INSTALL-S (TWW-POST) TY 1
EA 1.000 $300.000 $350.000 $500.000 $500.000 $340.800 $750.000
RELOCATE EXISTING MAILBOX
EA 1.000 $550.000 $400.000 $500.000 $250.000 $399.380 $750.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 9.000 $700.000 $810.000 $850.000 $690.000 $718.880 $1,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 1.000 $1,000.000 $920.000 $850.000 $890.000 $931.880 $1,250.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 4.000 $1,000.000 $1,050.000 $1,000.000 $1,050.000 $1,091.630 $1,250.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 10.000 $25.000 $20.000 $20.000 $22.000 $21.300 $25.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 14.000 $27.000 $26.000 $30.000 $30.000 $29.820 $40.000
REFL PAV MRK TY II (W) 4" (SLD)
LF 2,172.000 $0.500 $1.050 $1.000 $0.760 $1.070 $1.000
REFL PAV MRK TY II (Y) 4" (SLD)
LF 2,172.000 $0.500 $1.050 $1.000 $0.760 $1.070 $1.000
REFL PAV MRKR TY II-A-A
EA 28.000 $6.000 $10.500 $10.000 $10.200 $10.650 $12.000
PAV SURF PREP FOR MRK (4")
LF 4,344.000 $0.250 $1.050 $1.000 $0.760 $1.070 $1.000
FULL - WIDTH MOWING
CYC 6.000 $3,000.000 $550.000 $500.000 $2,000.000 $800.000 $800.000
LITTER REMOVAL
CYC 6.000 $2,000.000 $550.000 $200.000 $1,200.000 $1,000.000 $400.000
SP MIXES SP-C SAC-B PG64-22
TON 390.000 $205.000 $155.000 $150.000 $145.000 $163.000 $170.000
AMPHIBIAN/REPTILE EXCLUSION FENCE INST
LF 3,180.000 $4.000 $3.500 $0.100 $3.500 $1.860 $4.000
AMPHIBIAN/REPTILE EXCLUSION FENCE REM
LF 3,180.000 $1.500 $1.000 $0.100 $1.000 $0.210 $1.000
Totals: $2,749,477.700 $2,851,250.800 $2,975,033.400 $3,012,231.550 $3,242,290.995 $3,275,581.500