DENTON FM 455 (0816-02-079)

Items: 88

County: DENTON
Length: N/A
Highway: FM 455
District: DALLAS
Control Number: 0816-02-079
DBE Goal: N/A
Project: CC 816-2-79
Guaranty: N/A
Time: 159 WORKING DAYS
Engineer's Estimate: $1,498,249.39
Date: 03/07/2018 (8 years ago)
Contract Number: N/A
Type: INTERSECTION IMPROVEMENTS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$1,498,249.39
$1,280,176.58
Over/Under Est: -14.56% -$218,072.81
Over/Under Est: -4.63% -$69,439.79
Amt Left: 11.61% $148,633.02
Over/Under Est: 6.47% $96,943.69
Amt Left: 24.61% $315,016.50
Delta: -11.64% -$166,383.48
Over/Under Est: 12.34% $184,899.21
Amt Left: 31.48% $402,972.02
Delta: -5.51% -$87,955.52

Bid Items & Bid Tabulations

88 Total 0 of 88
DENTON  |  FM 455  |  DALLAS  |  0816-02-079  |  03/07/2018  |  $1,498,249.39  |  CC 816-2-79  |  INTERS IMPRVS  |  159 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JAGOE-PUBLIC COMPANY
THE LANE CONSTRUCTION CORPORATION
ED BELL CONSTRUCTION COMPANY
RAGLE CONSTRUCTION, INC.
PREPARING ROW
STA 42.020 $2,000.000 $1,000.000 $250.000 $1,785.000 $3,600.000
REMOVING STAB BASE AND ASPH PAV (2"-6")
SY 3,473.000 $7.500 $5.500 $4.500 $5.250 $7.000
REMOVING STAB BASE & ASPH PAV (6" - 8")
SY 278.000 $5.700 $17.000 $8.000 $8.400 $15.000
OBLITERATING ABANDONED ROAD
SY 4,380.000 $6.000 $2.600 $3.000 $1.050 $4.000
EXCAVATION (ROADWAY)
CY 3,185.000 $10.000 $11.500 $13.000 $12.600 $25.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 4,666.000 $15.000 $11.000 $23.000 $17.850 $20.000
COMPOST MANUF TOPSOIL (4")
SY 14,146.000 $1.500 $1.700 $1.500 $1.500 $1.400
BLOCK SODDING
SY 1,783.000 $3.000 $4.000 $3.250 $4.000 $5.100
STRAW/HAY MLCH SEED(PERM)(RURAL)(CLAY)
SY 14,146.000 $0.380 $0.330 $0.420 $0.500 $0.550
DRILL SEEDING (TEMP) (WARM)
SY 7,074.000 $0.110 $0.250 $0.210 $0.100 $0.500
DRILL SEEDING (TEMP) (COOL)
SY 7,074.000 $0.100 $0.250 $0.210 $0.100 $0.500
VEGETATIVE WATERING
MG 1,167.000 $15.000 $23.000 $18.000 $1.000 $24.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 38.000 $55.000 $105.000 $130.000 $75.000 $75.000
FL BS (CMP IN PLC)(TY D GR-1-2)(9")
SY 11,722.000 $16.000 $14.300 $15.500 $18.750 $20.000
LIME TRT (EXST MATL) (6")
SY 9,586.000 $6.000 $3.550 $9.000 $6.300 $4.000
LIME (HYD, COM OR QK)(SLURRY)
TON 97.000 $180.000 $160.000 $175.000 $160.000 $180.000
PRIME COAT (MC-30)
GAL 2,345.000 $4.000 $2.500 $7.000 $3.660 $8.000
SUPERPAVE MIXTURES SP-D SAC-B PG64-22
TON 3,803.000 $85.000 $67.000 $78.500 $73.500 $82.300
PLANE ASPH CONC PAV(0" TO 2")
SY 214.000 $3.500 $12.000 $6.000 $7.500 $8.000
PLANE ASPH CONC PAV(2" TO 4")
SY 4,772.000 $7.000 $2.600 $3.500 $2.200 $2.500
RIPRAP (CONC)(5 IN)
CY 11.000 $520.000 $430.000 $400.000 $525.000 $600.000
CMP (GAL STL 24 IN)
LF 10.000 $70.000 $235.000 $235.000 $150.000 $220.000
CMP (GAL STL 42 IN)
LF 30.000 $110.000 $300.000 $290.000 $215.000 $260.000
RC PIPE (CL III)(18 IN)
LF 96.000 $70.000 $75.000 $72.000 $80.000 $70.000
RC PIPE (CL III)(24 IN)
LF 66.000 $76.000 $90.000 $86.000 $105.000 $80.000
RC PIPE (CL III)(36 IN)
LF 168.000 $100.000 $148.000 $145.000 $130.000 $100.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 6.000 $1,050.000 $1,080.000 $1,050.000 $840.000 $540.000
SET (TY II) (24 IN) (CMP) (4: 1) (C)
EA 1.000 $2,000.000 $1,480.000 $1,450.000 $1,260.000 $530.000
SET (TY II) (24 IN) (RCP) (4: 1) (P)
EA 2.000 $1,350.000 $1,350.000 $1,325.000 $945.000 $650.000
SET (TY II) (36 IN) (RCP) (4: 1) (P)
EA 4.000 $2,200.000 $2,750.000 $2,725.000 $2,520.000 $820.000
SET (TY II) (42 IN) (CMP) (3: 1) (C)
EA 2.000 $4,000.000 $3,900.000 $3,850.000 $3,150.000 $675.000
SET (TY II) (42 IN) (CMP) (4: 1) (C)
EA 2.000 $1,700.000 $4,500.000 $4,440.000 $3,675.000 $750.000
REMOV STR (WINGWALL)
EA 2.000 $1,600.000 $1,300.000 $1,270.000 $630.000 $850.000
REMOV STR (HEADWALL)
EA 3.000 $1,120.000 $650.000 $635.000 $630.000 $925.000
REMOV STR (BOX CULVERT)
LF 32.000 $150.000 $48.000 $50.000 $63.000 $46.000
REMOV STR (SMALL FENCE)
LF 858.000 $2.000 $3.500 $6.500 $5.000 $2.000
MOBILIZATION
LS 1.000 $140,000.000 $125,000.000 $75,000.000 $155,000.000 $160,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $5,000.000 $3,500.000 $8,500.000 $21,000.000 $7,000.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 240.000 $48.000 $53.000 $55.000 $30.000 $50.000
ROCK FILTER DAMS (REMOVE)
LF 240.000 $8.000 $11.000 $11.840 $13.000 $12.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 780.000 $13.000 $20.000 $19.250 $21.000 $16.500
CONSTRUCTION EXITS (REMOVE)
SY 780.000 $6.000 $8.500 $9.000 $10.500 $8.500
TEMP SEDMT CONT FENCE (INSTALL)
LF 4,078.000 $2.350 $2.000 $1.600 $1.500 $1.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 4,078.000 $0.640 $0.640 $0.450 $0.150 $0.420
CONSTRUCTING DETOURS
SY 1,170.000 $65.000 $54.000 $55.000 $73.500 $75.000
MTL W-BEAM GD FEN (TIM POST)
LF 250.000 $20.500 $20.000 $22.000 $23.000 $24.250
SHORT RADIUS
LF 87.500 $22.000 $27.000 $28.000 $37.000 $36.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $2,000.000 $2,600.000 $2,200.000 $2,400.000 $2,350.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 36.000 $475.000 $420.000 $400.000 $431.000 $400.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 6.000 $825.000 $730.000 $650.000 $815.000 $690.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 9.000 $80.000 $51.000 $45.000 $50.000 $65.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 12,938.000 $0.250 $0.620 $0.580 $0.540 $1.000
WK ZN PAV MRK REMOV (W)12"(SLD)
LF 36.000 $8.000 $7.250 $23.000 $21.000 $5.000
WK ZN PAV MRK REMOV (Y)4"(BRK)
LF 50.000 $0.800 $10.350 $4.500 $4.200 $1.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 16,370.000 $0.680 $1.140 $1.000 $0.890 $1.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 2,223.000 $0.750 $0.820 $1.750 $1.470 $0.880
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 90.000 $2.800 $3.100 $5.650 $5.250 $3.500
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 46.000 $5.500 $6.400 $11.300 $10.500 $5.500
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 12.000 $125.000 $118.000 $190.000 $173.250 $145.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 12.000 $125.000 $145.000 $285.000 $262.500 $185.000
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 249.000 $2.500 $3.100 $6.800 $6.300 $3.500
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 11,503.000 $0.300 $0.440 $0.500 $0.460 $0.700
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 11,222.000 $0.350 $0.440 $0.500 $0.460 $0.700
REFL PAV MRKR TY I-C
EA 114.000 $3.250 $5.100 $6.500 $6.040 $3.300
REFL PAV MRKR TY II-A-A
EA 380.000 $2.900 $3.600 $6.500 $6.040 $3.300
ELIM EXT PAV MRK & MRKS (4")
LF 9,833.000 $0.500 $0.520 $0.520 $0.480 $1.000
ELIM EXT PAV MRK & MRKS (24")
LF 36.000 $5.000 $2.100 $11.500 $10.500 $3.000
FULL - WIDTH MOWING
AC 19.800 $107.000 $465.000 $950.000 $210.000 $200.000
6" C900 DR18 PVC WATER PIPE
LF 540.000 $64.000 $41.000 $40.250 $40.000 $39.000
3.5" C900 PVC WATER PIPE
LF 180.000 $65.000 $28.000 $28.000 $34.000 $27.000
6" GATE VALVE
EA 3.000 $2,300.000 $1,350.000 $1,275.000 $1,200.000 $1,240.000
3.5" GATE VALVE
EA 1.000 $2,300.000 $1,200.000 $1,135.000 $750.000 $1,100.000
6" PLUG
EA 2.000 $845.000 $325.000 $310.000 $200.000 $300.000
3.5" PLUG
EA 1.000 $600.000 $300.000 $290.000 $200.000 $275.000
6" 45 DEGREE BEND
EA 7.000 $195.000 $520.000 $495.000 $450.000 $475.000
6" 90 DEGREE BEND
EA 1.000 $215.000 $530.000 $500.000 $500.000 $370.000
3.5" 45 DEGREE BEND
EA 1.000 $100.000 $405.000 $385.000 $425.000 $550.000
6" X 3.5" TEE
EA 1.000 $300.000 $600.000 $570.000 $600.000 $550.000
TRENCH EXCAVATION PROTECTION
LF 360.000 $3.800 $3.300 $3.200 $1.000 $3.000
CONSTRUCTION STAKING
LS 1.000 $7,500.000 $1,375.000 $1,250.000 $250.000 $1,250.000
AS-BUILT SURVEY
LS 1.000 $2,500.000 $2,200.000 $2,000.000 $250.000 $2,000.000
ABANDON/REMOVE EXISTING 6" WATER LINE
LF 540.000 $15.000 $8.800 $8.250 $10.000 $8.000
ABANDON/REMOVE EXISTING 3.5" WATER LINE
LF 110.000 $15.000 $7.700 $7.250 $9.000 $7.000
EXISTING PIPE TO PIPE CONNECTION
EA 3.000 $2,203.000 $1,485.000 $1,400.000 $1,500.000 $1,350.000
10" SPLIT STEEL ENCASEMENT (OPEN CUT)
LF 40.000 $145.000 $77.000 $75.000 $150.000 $70.000
6" SPLIT STEEL ENCASEMENT (OPEN CUT)
LF 40.000 $120.000 $60.000 $57.000 $110.000 $55.000
REMOVE AND INSTALL WATER METER
EA 1.000 $650.000 $785.000 $750.000 $800.000 $715.000
10" STEEL ENCASED PIPE (NOT OPEN CUT)
LF 100.000 $230.000 $300.000 $300.000 $205.000 $285.000
Totals: $1,498,249.390 $1,280,176.580 $1,428,809.600 $1,595,193.080 $1,683,148.600