PREPARING ROW
|
STA
|
146.000
|
$58,000.000
|
$25,000.000
|
$51,890.000
|
$50,552.000
|
$63,274.130
|
$62,638.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
46,158.000
|
$6.000
|
$13.000
|
$11.160
|
$8.000
|
$7.010
|
$9.250
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
863.000
|
$12.000
|
$13.000
|
$8.390
|
$12.000
|
$7.540
|
$47.500
|
|
|
REMOVING CONC (FLUME)
|
SY
|
76.000
|
$40.000
|
$13.000
|
$13.270
|
$18.000
|
$10.780
|
$56.500
|
|
|
REMOVING STAB BASE & ASPH PAV (4"-12")
|
SY
|
48,087.000
|
$6.000
|
$10.000
|
$5.420
|
$12.000
|
$4.490
|
$10.900
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
264,684.000
|
$11.000
|
$5.000
|
$7.000
|
$6.000
|
$3.650
|
$10.600
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
|
CY
|
263,764.000
|
$12.000
|
$15.000
|
$4.000
|
$7.000
|
$12.360
|
$17.000
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
|
CY
|
1,893.000
|
$30.000
|
$50.000
|
$120.000
|
$80.000
|
$19.890
|
$81.500
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
262,020.000
|
$1.250
|
$0.930
|
$2.370
|
$1.650
|
$2.430
|
$2.400
|
|
|
BLOCK SODDING
|
SY
|
262,020.000
|
$4.000
|
$3.950
|
$3.870
|
$3.950
|
$3.900
|
$5.500
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
281,232.000
|
$0.110
|
$0.120
|
$0.170
|
$0.140
|
$0.160
|
$0.100
|
|
|
VEGETATIVE WATERING
|
MG
|
80,814.000
|
$8.000
|
$0.100
|
$1.000
|
$0.250
|
$6.890
|
$12.700
|
|
|
SOIL RETENTION BLANKETS (CL 2) (TY G)
|
SY
|
24,155.000
|
$4.000
|
$4.970
|
$4.080
|
$4.970
|
$3.660
|
$1.500
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
4,158.000
|
$300.000
|
$320.000
|
$290.000
|
$325.000
|
$328.720
|
$301.000
|
|
|
LIME TRT (EXST MATL) (12")
|
SY
|
136,119.000
|
$6.000
|
$5.750
|
$5.500
|
$7.000
|
$4.060
|
$5.300
|
|
|
LIME TRT (EXST MATL)(8")
|
SY
|
72,848.000
|
$5.000
|
$7.000
|
$5.000
|
$6.000
|
$4.130
|
$5.250
|
|
|
CONC PVMT (CONT REINF - CRCP) (10")
|
SY
|
66,796.000
|
$90.000
|
$75.000
|
$80.000
|
$85.000
|
$86.840
|
$97.500
|
|
|
CONC PVMT (CONT REINF - CRCP) (13")
|
SY
|
130,173.000
|
$100.000
|
$85.000
|
$92.500
|
$95.000
|
$98.490
|
$94.000
|
|
|
CEM STABIL BKFL
|
CY
|
5,381.000
|
$120.000
|
$250.000
|
$127.970
|
$140.000
|
$205.940
|
$135.000
|
|
|
CUT & RESTORE CONC PAVING
|
SY
|
1,038.000
|
$400.000
|
$200.000
|
$80.760
|
$200.000
|
$151.710
|
$221.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
5.000
|
$550.000
|
$500.000
|
$337.670
|
$350.000
|
$541.170
|
$434.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
4,821.000
|
$3.500
|
$2.000
|
$10.340
|
$6.000
|
$3.170
|
$3.850
|
|
|
TEMPORARY SPL SHORING
|
SF
|
999.000
|
$25.000
|
$50.000
|
$85.810
|
$70.000
|
$68.910
|
$59.250
|
|
|
SOIL NAIL ANCHORS
|
LF
|
49,240.000
|
$35.000
|
$25.000
|
$20.250
|
$19.000
|
$18.250
|
$16.600
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
1,081.000
|
$100.000
|
$82.000
|
$43.930
|
$80.000
|
$41.490
|
$38.750
|
|
|
DRILL SHAFT (30 IN)
|
LF
|
264.000
|
$125.000
|
$209.000
|
$213.560
|
$210.000
|
$209.000
|
$282.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
10,654.000
|
$210.000
|
$183.000
|
$161.470
|
$225.000
|
$216.700
|
$164.000
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
382.000
|
$300.000
|
$265.000
|
$223.660
|
$300.000
|
$265.000
|
$244.000
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
42.000
|
$228.000
|
$444.000
|
$442.080
|
$450.000
|
$444.000
|
$512.000
|
|
|
DRILL SHAFT (66 IN)
|
LF
|
30.000
|
$700.000
|
$1,800.000
|
$1,522.530
|
$1,550.000
|
$1,490.000
|
$1,180.000
|
|
|
DRILL SHAFT (72 IN)
|
LF
|
45.000
|
$1,200.000
|
$2,100.000
|
$1,885.270
|
$1,950.000
|
$1,845.000
|
$1,300.000
|
|
|
DRILL SHAFT (SIGN MTS) (48 IN)
|
LF
|
18.000
|
$550.000
|
$516.000
|
$527.260
|
$729.300
|
$715.000
|
$715.000
|
|
|
DRILL SHAFT (SIGN MTS) (54 IN)
|
LF
|
241.000
|
$421.000
|
$555.000
|
$567.120
|
$742.560
|
$728.000
|
$728.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (30 IN)
|
LF
|
22.000
|
$300.000
|
$561.000
|
$591.060
|
$406.980
|
$399.000
|
$399.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
117.000
|
$310.000
|
$633.000
|
$666.920
|
$457.720
|
$448.750
|
$449.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (48 IN)
|
LF
|
22.000
|
$437.000
|
$737.000
|
$776.490
|
$622.200
|
$610.000
|
$610.000
|
|
|
CL A CONC (MISC)
|
CY
|
48.000
|
$720.000
|
$500.000
|
$758.710
|
$600.000
|
$345.630
|
$615.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
890.900
|
$1,200.000
|
$1,300.000
|
$925.000
|
$1,350.000
|
$1,191.990
|
$1,370.000
|
|
|
CL C CONC (ABUT)(HPC)(EXTEND)
|
CY
|
35.200
|
$1,200.000
|
$5,000.000
|
$1,446.440
|
$1,700.000
|
$1,961.400
|
$2,370.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
1,485.400
|
$1,200.000
|
$1,300.000
|
$1,090.000
|
$1,500.000
|
$1,206.600
|
$1,410.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
962.700
|
$1,300.000
|
$1,300.000
|
$1,012.000
|
$1,300.000
|
$1,142.620
|
$1,430.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
387,827.000
|
$23.000
|
$20.000
|
$22.000
|
$22.000
|
$18.540
|
$22.200
|
|
|
REINF CONC SLAB (EXTEND SLAB)(HPC)
|
SF
|
6,524.000
|
$30.000
|
$65.000
|
$31.410
|
$36.000
|
$36.800
|
$42.000
|
|
|
BRIDGE MEDIAN (HPC)
|
SF
|
1,261.000
|
$12.000
|
$28.000
|
$14.610
|
$22.000
|
$12.300
|
$10.500
|
|
|
BRIDGE SIDEWALK (HPC)
|
SF
|
3,151.000
|
$12.000
|
$26.000
|
$16.030
|
$22.000
|
$10.500
|
$11.200
|
|
|
APPROACH SLAB
|
CY
|
1,857.000
|
$650.000
|
$650.000
|
$636.000
|
$625.000
|
$468.000
|
$495.000
|
|
|
RETAINING WALL (MSE)
|
SF
|
8,836.000
|
$50.000
|
$110.000
|
$87.260
|
$73.000
|
$75.240
|
$83.750
|
|
|
RETAINING WALL (SOIL NAIL)(FACIA)
|
SF
|
32,749.000
|
$55.000
|
$61.000
|
$81.340
|
$63.000
|
$52.220
|
$73.250
|
|
|
PRESTR CONC GIRDER (TX34)
|
LF
|
742.500
|
$180.000
|
$230.000
|
$192.950
|
$177.000
|
$220.550
|
$175.000
|
|
|
PRESTR CONC GIRDER (TX40)
|
LF
|
6,559.960
|
$185.000
|
$170.000
|
$167.520
|
$160.000
|
$196.210
|
$159.000
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
49,862.700
|
$180.000
|
$175.000
|
$173.470
|
$165.000
|
$183.730
|
$166.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
496.500
|
$500.000
|
$650.000
|
$546.830
|
$500.000
|
$650.560
|
$599.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
318.000
|
$700.000
|
$650.000
|
$563.230
|
$550.000
|
$623.440
|
$498.000
|
|
|
RIPRAP (CONC)(CL B)(RR8&RR9)
|
CY
|
3.000
|
$450.000
|
$1,000.000
|
$546.830
|
$1,750.000
|
$1,050.000
|
$620.000
|
|
|
RIPRAP (STONE TYPE R)(DRY)(24")
|
CY
|
146.000
|
$250.000
|
$240.000
|
$126.330
|
$85.000
|
$836.280
|
$147.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
6,948.000
|
$150.000
|
$156.000
|
$112.480
|
$100.000
|
$108.430
|
$137.000
|
|
|
RIPRAP (STONE PROTECTION) (36 IN)
|
CY
|
324.000
|
$200.000
|
$340.000
|
$101.270
|
$110.000
|
$121.030
|
$143.000
|
|
|
RIPRAP (CONC)(FLUME)
|
CY
|
130.000
|
$550.000
|
$1,000.000
|
$656.190
|
$625.000
|
$646.140
|
$652.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
332.000
|
$500.000
|
$650.000
|
$544.640
|
$800.000
|
$653.690
|
$512.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL5)
|
LF
|
300.000
|
$80.000
|
$50.000
|
$46.930
|
$45.000
|
$8.000
|
$66.250
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
340.000
|
$15.000
|
$22.000
|
$15.540
|
$25.000
|
$12.840
|
$19.400
|
|
|
RAIL (TY T221)(HPC)
|
LF
|
1,016.300
|
$75.000
|
$110.000
|
$75.570
|
$90.000
|
$77.240
|
$69.500
|
|
|
RAIL (TY T551)(HPC)
|
LF
|
479.700
|
$60.000
|
$145.000
|
$72.250
|
$62.000
|
$92.240
|
$73.250
|
|
|
RAIL (TY T552)(HPC)
|
LF
|
1,696.000
|
$70.000
|
$115.000
|
$69.170
|
$65.000
|
$85.240
|
$69.250
|
|
|
RAIL (TY SSTR)
|
LF
|
2,054.300
|
$50.000
|
$145.000
|
$73.950
|
$50.000
|
$72.240
|
$61.500
|
|
|
RAIL (TY SSTR)(HPC)
|
LF
|
8,279.000
|
$70.000
|
$85.000
|
$76.850
|
$62.000
|
$68.240
|
$59.500
|
|
|
RAIL (TY C221)(HPC)
|
LF
|
460.100
|
$100.000
|
$170.000
|
$120.280
|
$135.000
|
$132.130
|
$126.000
|
|
|
RAIL(PEDESTRIAN)(SPL)
|
LF
|
1,486.000
|
$220.000
|
$55.000
|
$110.030
|
$65.000
|
$104.740
|
$218.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
1,518.000
|
$130.000
|
$215.000
|
$169.400
|
$201.000
|
$173.660
|
$171.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - B)
|
LF
|
680.000
|
$160.000
|
$160.000
|
$116.310
|
$150.000
|
$173.660
|
$118.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
1,671.000
|
$400.000
|
$480.000
|
$354.780
|
$375.000
|
$358.620
|
$401.000
|
|
|
CONC BOX CULV (6 FT X 6 FT)
|
LF
|
343.000
|
$950.000
|
$750.000
|
$500.000
|
$500.000
|
$542.410
|
$653.000
|
|
|
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
|
LF
|
337.000
|
$700.000
|
$535.000
|
$448.790
|
$500.000
|
$533.760
|
$633.000
|
|
|
CONC BOX CULV (9 FT X 8 FT)(EXTEND)
|
LF
|
568.000
|
$1,100.000
|
$1,070.000
|
$909.650
|
$1,050.000
|
$996.400
|
$1,160.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
14.000
|
$54.000
|
$135.000
|
$88.820
|
$250.000
|
$122.760
|
$144.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
3,655.000
|
$90.000
|
$150.000
|
$87.950
|
$90.000
|
$96.430
|
$145.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
1,355.000
|
$100.000
|
$170.000
|
$125.000
|
$130.000
|
$131.120
|
$178.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
1,564.000
|
$130.000
|
$200.000
|
$155.000
|
$155.000
|
$166.690
|
$232.000
|
|
|
MANH (COMPL)(PRM)(48IN)
|
EA
|
2.000
|
$3,800.000
|
$10,000.000
|
$3,218.110
|
$5,200.000
|
$3,173.930
|
$4,900.000
|
|
|
JCTBOX(COMPL)(PJB)(4FTX4FT)
|
EA
|
5.000
|
$6,000.000
|
$13,100.000
|
$3,979.600
|
$4,000.000
|
$4,044.460
|
$8,310.000
|
|
|
JCTBOX(COMPL)(PJB)(8FTX8FT)
|
EA
|
1.000
|
$16,000.000
|
$22,750.000
|
$12,254.980
|
$12,000.000
|
$13,390.480
|
$18,170.850
|
|
|
INLET (COMPL)(PCU)(3FT)(LEFT)
|
EA
|
4.000
|
$9,000.000
|
$10,350.000
|
$4,626.510
|
$6,000.000
|
$4,395.620
|
$8,310.000
|
|
|
INLET (COMPL)(PCU)(3FT)(BOTH)
|
EA
|
6.000
|
$6,000.000
|
$11,250.000
|
$5,372.800
|
$6,500.000
|
$4,954.550
|
$9,090.000
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
4.000
|
$5,100.000
|
$8,600.000
|
$3,476.010
|
$3,900.000
|
$2,638.900
|
$5,010.000
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
10.000
|
$8,000.000
|
$10,500.000
|
$3,811.590
|
$4,500.000
|
$3,452.380
|
$7,250.000
|
|
|
INLET (COMPL)(RWI)(TY II)
|
EA
|
1.000
|
$7,000.000
|
$20,100.000
|
$10,820.490
|
$16,000.000
|
$6,415.170
|
$11,830.000
|
|
|
INLET (RAIL & GRATE) (TY II)
|
EA
|
20.000
|
$10,000.000
|
$11,500.000
|
$2,588.750
|
$7,700.000
|
$2,229.990
|
$14,940.000
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
2.000
|
$23,500.000
|
$30,000.000
|
$38,080.050
|
$23,300.000
|
$21,067.330
|
$27,400.000
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
3.000
|
$22,000.000
|
$38,500.000
|
$36,387.140
|
$39,700.000
|
$21,068.520
|
$48,530.000
|
|
|
SET (PIPE RUNNER ASSEMBLY)
|
EA
|
4.000
|
$6,000.000
|
$4,000.000
|
$3,274.490
|
$3,100.000
|
$0.010
|
$750.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (P)
|
EA
|
4.000
|
$1,300.000
|
$3,300.000
|
$1,191.390
|
$2,100.000
|
$1,516.110
|
$1,850.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$1,600.000
|
$2,500.000
|
$1,390.300
|
$2,300.000
|
$1,729.120
|
$2,170.000
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$1,800.000
|
$3,800.000
|
$1,544.190
|
$2,300.000
|
$1,709.390
|
$2,810.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (P)
|
EA
|
4.000
|
$2,000.000
|
$5,600.000
|
$1,753.610
|
$2,500.000
|
$1,935.030
|
$4,920.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (P)
|
EA
|
1.000
|
$3,000.000
|
$6,700.000
|
$2,684.060
|
$2,700.000
|
$2,179.600
|
$6,260.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$5,000.000
|
$9,750.000
|
$2,068.140
|
$3,500.000
|
$2,839.130
|
$6,370.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
2.000
|
$2,000.000
|
$10,000.000
|
$9,146.540
|
$5,000.000
|
$4,755.690
|
$5,550.000
|
|
|
REMOV STR (INLET)
|
EA
|
10.000
|
$710.000
|
$1,750.000
|
$784.160
|
$1,800.000
|
$547.550
|
$783.000
|
|
|
REMOV STR (SET)
|
EA
|
6.000
|
$340.000
|
$1,500.000
|
$431.220
|
$645.000
|
$870.580
|
$727.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
11.000
|
$1,800.000
|
$4,750.000
|
$1,103.540
|
$1,100.000
|
$2,013.980
|
$1,910.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
7.000
|
$2,000.000
|
$3,000.000
|
$1,606.460
|
$1,100.000
|
$1,474.410
|
$1,100.000
|
|
|
REMOV STR (PIPE)
|
LF
|
1,611.000
|
$23.000
|
$45.000
|
$18.570
|
$17.250
|
$14.170
|
$40.500
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
2,269.000
|
$150.000
|
$120.000
|
$37.670
|
$36.050
|
$47.160
|
$62.750
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
2.000
|
$20,480.000
|
$50,000.000
|
$75,000.000
|
$47,000.000
|
$41,900.950
|
$44,290.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$80,000.000
|
$100,000.000
|
$120,000.000
|
$50,000.000
|
$64,057.200
|
$66,400.000
|
|
|
REMOVE STR (RAIL)
|
LF
|
485.000
|
$25.000
|
$75.000
|
$11.600
|
$18.000
|
$24.590
|
$23.100
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$8,500,000.000
|
$9,580,000.000
|
$9,587,000.000
|
$9,000,000.000
|
$9,335,266.040
|
$10,441,019.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
36.000
|
$40,000.000
|
$35,000.000
|
$24,000.000
|
$25,000.000
|
$18,500.000
|
$8,880.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
2,622.000
|
$28.000
|
$32.000
|
$38.470
|
$37.550
|
$27.500
|
$32.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
515.000
|
$50.000
|
$35.000
|
$99.510
|
$97.140
|
$58.000
|
$54.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
3,137.000
|
$10.000
|
$1.000
|
$11.660
|
$11.380
|
$10.000
|
$8.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
1,127.000
|
$21.000
|
$31.500
|
$35.790
|
$34.940
|
$27.500
|
$20.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,127.000
|
$7.000
|
$1.000
|
$9.480
|
$9.250
|
$10.000
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
8,791.000
|
$2.000
|
$1.850
|
$3.770
|
$3.680
|
$2.620
|
$2.750
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
8,791.000
|
$0.500
|
$0.250
|
$0.830
|
$0.810
|
$0.750
|
$0.500
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
1,646.000
|
$5.000
|
$3.850
|
$7.740
|
$7.560
|
$5.250
|
$12.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,646.000
|
$1.000
|
$0.500
|
$0.830
|
$0.810
|
$1.000
|
$0.500
|
|
|
CONSTRUCTING DETOURS
|
SY
|
30,623.000
|
$100.000
|
$75.000
|
$87.810
|
$90.000
|
$79.000
|
$92.500
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
17,790.000
|
$38.000
|
$10.000
|
$43.910
|
$38.000
|
$34.350
|
$28.500
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
16,570.000
|
$5.000
|
$5.000
|
$4.050
|
$3.010
|
$4.080
|
$5.450
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
17,790.000
|
$10.000
|
$5.000
|
$10.820
|
$3.560
|
$2.830
|
$6.400
|
|
|
PORT CTB REMOVE(F-SHAPE OR SNGL SLP)TY1
|
LF
|
45.000
|
$7.000
|
$35.000
|
$16.840
|
$126.590
|
$9.130
|
$21.100
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
7,823.000
|
$60.000
|
$85.000
|
$73.520
|
$85.000
|
$79.240
|
$72.000
|
|
|
PERM CTB (SGL SLOPE) (TY 3) (42 )
|
LF
|
362.000
|
$190.000
|
$320.000
|
$194.780
|
$185.000
|
$254.380
|
$195.000
|
|
|
PERM CTB(SGL SLOPE)(TY 1)(42)(HPC)
|
LF
|
590.000
|
$88.000
|
$200.000
|
$85.720
|
$95.000
|
$98.240
|
$91.000
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
6,034.000
|
$4.000
|
$1.000
|
$5.010
|
$2.500
|
$10.300
|
$4.900
|
|
|
DRIVEWAYS (CONC)
|
SY
|
518.000
|
$80.000
|
$75.000
|
$80.930
|
$98.000
|
$118.090
|
$88.750
|
|
|
CONC SIDEWALKS (5")
|
SY
|
68.000
|
$62.000
|
$75.000
|
$49.210
|
$140.000
|
$122.110
|
$98.500
|
|
|
CURB RAMPS (TY 1)
|
EA
|
6.000
|
$2,000.000
|
$3,000.000
|
$2,023.260
|
$2,000.000
|
$1,649.140
|
$3,140.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
17.000
|
$2,100.000
|
$3,100.000
|
$2,460.720
|
$1,600.000
|
$1,844.330
|
$3,140.000
|
|
|
CURB RAMPS (TY 10)
|
EA
|
1.000
|
$1,600.000
|
$3,200.000
|
$2,460.720
|
$2,300.000
|
$1,800.440
|
$3,740.000
|
|
|
CURB RAMPS (TY 22)
|
EA
|
1.000
|
$3,000.000
|
$3,300.000
|
$3,280.960
|
$3,000.000
|
$3,789.930
|
$3,740.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
2,462.500
|
$30.000
|
$22.000
|
$20.050
|
$19.750
|
$19.750
|
$19.800
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
7.000
|
$1,850.000
|
$1,875.000
|
$1,755.170
|
$1,750.000
|
$1,750.000
|
$1,750.000
|
|
|
MTL BEAM GD FEN TRANS (TL2)
|
EA
|
12.000
|
$1,285.000
|
$1,165.000
|
$1,034.210
|
$750.000
|
$750.000
|
$750.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
10.000
|
$1,180.000
|
$1,395.000
|
$1,205.720
|
$1,000.000
|
$1,000.000
|
$1,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,795.000
|
$2.500
|
$1.500
|
$1.800
|
$3.500
|
$3.500
|
$3.500
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
25.000
|
$2,840.000
|
$2,700.000
|
$2,903.370
|
$2,650.000
|
$2,650.000
|
$2,650.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
24.000
|
$1,700.000
|
$1,200.000
|
$1,186.660
|
$1,000.000
|
$213.160
|
$1,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
20.000
|
$1,000.000
|
$500.000
|
$949.330
|
$850.000
|
$461.850
|
$850.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
20.000
|
$6,800.000
|
$8,000.000
|
$7,278.150
|
$7,250.000
|
$7,716.590
|
$7,250.000
|
|
|
IN RD IL (U/P) (TY 1) (150W EQ) LED
|
EA
|
8.000
|
$1,255.000
|
$1,610.000
|
$1,696.260
|
$2,601.000
|
$2,550.000
|
$2,550.000
|
|
|
IN RD IL (U/P) (TY 2) (150W EQ) LED
|
EA
|
8.000
|
$1,500.000
|
$1,695.000
|
$1,785.820
|
$2,927.400
|
$2,870.000
|
$2,870.000
|
|
|
IN RD IL (TY SA) 40B-8 (250W EQ) LED
|
EA
|
15.000
|
$3,100.000
|
$4,230.000
|
$4,456.640
|
$5,385.600
|
$5,280.000
|
$5,280.000
|
|
|
IN RD IL (TY SA) 40T-8 (250W EQ) LED
|
EA
|
33.000
|
$3,615.000
|
$3,840.000
|
$4,045.740
|
$5,895.600
|
$5,780.000
|
$5,780.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
15,300.000
|
$10.000
|
$14.500
|
$15.280
|
$9.740
|
$9.550
|
$9.550
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
1,515.000
|
$23.000
|
$32.000
|
$33.710
|
$29.370
|
$28.790
|
$28.800
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
590.000
|
$17.000
|
$37.000
|
$38.980
|
$13.410
|
$13.150
|
$13.200
|
|
|
CONDT (PVC) (SCH 40) (4") (BORE)
|
LF
|
2,225.000
|
$40.000
|
$70.500
|
$74.280
|
$44.830
|
$43.950
|
$44.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
135.000
|
$14.000
|
$25.150
|
$26.870
|
$12.550
|
$12.300
|
$12.300
|
|
|
CONDT (RM) (2")
|
LF
|
4,455.000
|
$40.000
|
$29.450
|
$31.030
|
$39.420
|
$38.650
|
$38.750
|
|
|
ELEC CONDR (NO.12) INSULATED
|
LF
|
640.000
|
$1.000
|
$2.200
|
$2.320
|
$1.280
|
$1.250
|
$1.250
|
|
|
ELEC CONDR (NO.10) BARE
|
LF
|
650.000
|
$1.500
|
$1.550
|
$1.630
|
$1.410
|
$1.380
|
$1.400
|
|
|
ELEC CONDR (NO.10) INSULATED
|
LF
|
1,300.000
|
$2.000
|
$1.700
|
$1.790
|
$1.460
|
$1.430
|
$1.450
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
20,335.000
|
$1.500
|
$1.750
|
$1.840
|
$1.610
|
$1.580
|
$1.600
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
44,480.000
|
$2.000
|
$1.920
|
$2.020
|
$1.680
|
$1.650
|
$1.650
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
3,630.000
|
$2.000
|
$3.050
|
$3.210
|
$2.040
|
$2.000
|
$2.000
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
2,590.000
|
$2.000
|
$2.550
|
$2.690
|
$2.140
|
$2.100
|
$2.100
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
225.000
|
$4.000
|
$2.800
|
$2.950
|
$3.060
|
$3.000
|
$3.000
|
|
|
GROUND BOX TY A (122311)
|
EA
|
8.000
|
$1,200.000
|
$1,080.000
|
$1,137.860
|
$1,009.800
|
$990.000
|
$990.000
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
28.000
|
$950.000
|
$1,675.000
|
$1,764.750
|
$1,076.100
|
$1,055.000
|
$1,060.000
|
|
|
GROUND BOX TY C (162911)
|
EA
|
14.000
|
$1,200.000
|
$1,665.000
|
$1,754.210
|
$1,170.960
|
$1,148.000
|
$1,150.000
|
|
|
GROUND BOX TY C (162911)W/APRON
|
EA
|
6.000
|
$11,170.000
|
$2,340.000
|
$2,465.370
|
$1,239.300
|
$1,215.000
|
$1,220.000
|
|
|
GROUND BOX TY D (162922)
|
EA
|
6.000
|
$1,200.000
|
$1,190.000
|
$1,253.760
|
$1,326.000
|
$1,300.000
|
$1,300.000
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)GC(O)
|
EA
|
2.000
|
$10,000.000
|
$9,365.000
|
$9,866.770
|
$10,047.000
|
$9,850.000
|
$9,850.000
|
|
|
ELC SRV TY D 120/240 060(NS)SS(N)PS(U)
|
EA
|
3.000
|
$5,600.000
|
$9,070.000
|
$9,555.960
|
$9,169.800
|
$8,990.000
|
$8,990.000
|
|
|
ELC SRV TY D 120/240 070(NS)SS(E)PS(U)
|
EA
|
2.000
|
$6,308.000
|
$10,780.000
|
$11,357.580
|
$9,169.800
|
$8,990.000
|
$8,990.000
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
2,581.000
|
$27.000
|
$24.950
|
$28.510
|
$56.100
|
$24.950
|
$55.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY O)
|
SF
|
770.000
|
$48.000
|
$25.950
|
$42.050
|
$48.960
|
$25.950
|
$48.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
47.000
|
$510.000
|
$635.000
|
$650.500
|
$733.380
|
$635.000
|
$719.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
2.000
|
$630.000
|
$745.000
|
$763.190
|
$814.980
|
$745.000
|
$799.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
79.000
|
$622.000
|
$755.000
|
$773.430
|
$826.200
|
$755.000
|
$810.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
|
EA
|
3.000
|
$600.000
|
$711.000
|
$728.360
|
$773.160
|
$711.000
|
$758.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
|
EA
|
15.000
|
$750.000
|
$888.000
|
$909.680
|
$817.020
|
$888.000
|
$801.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
3.000
|
$750.000
|
$1,013.000
|
$1,037.730
|
$3,213.000
|
$1,013.000
|
$3,150.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
12.000
|
$718.000
|
$1,083.000
|
$1,109.440
|
$943.500
|
$1,083.000
|
$925.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
2.000
|
$894.000
|
$1,084.000
|
$1,110.470
|
$1,038.360
|
$1,084.000
|
$1,020.000
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
|
EA
|
6.000
|
$1,313.000
|
$2,175.000
|
$2,228.100
|
$1,122.000
|
$2,175.000
|
$1,100.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
6.000
|
$1,800.000
|
$2,300.000
|
$2,356.160
|
$2,907.000
|
$2,300.000
|
$2,850.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
5.000
|
$431.000
|
$500.000
|
$512.210
|
$663.000
|
$500.000
|
$650.000
|
|
|
IN SRSS & AM (RAIL)(90 MPH)(T MOUNT)
|
EA
|
9.000
|
$3,000.000
|
$3,350.000
|
$6,360.890
|
$5,661.000
|
$3,350.000
|
$5,550.000
|
|
|
INS OH SN SUP(30 FT BAL TEE)
|
EA
|
1.000
|
$35,000.000
|
$47,255.000
|
$48,286.520
|
$45,900.000
|
$45,000.000
|
$45,000.000
|
|
|
INS OH SN SUP(35 FT CANT)
|
EA
|
1.000
|
$25,000.000
|
$39,870.000
|
$40,740.320
|
$80,580.000
|
$79,000.000
|
$79,000.000
|
|
|
INS OH SN SUP(40 FT CANT)
|
EA
|
11.000
|
$40,000.000
|
$71,265.000
|
$72,820.640
|
$49,255.800
|
$48,290.000
|
$48,290.000
|
|
|
SIGN WALKWAY (48 IN) WITH HNDRL
|
LF
|
46.000
|
$400.000
|
$600.000
|
$194.150
|
$561.000
|
$600.000
|
$550.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
44.000
|
$21.000
|
$25.000
|
$52.380
|
$25.000
|
$28.000
|
$25.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
27.000
|
$21.000
|
$25.000
|
$52.380
|
$25.000
|
$28.000
|
$25.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(YFLX)SRF
|
EA
|
8.000
|
$69.000
|
$85.000
|
$126.450
|
$70.000
|
$50.000
|
$70.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
17,930.000
|
$0.500
|
$0.620
|
$0.280
|
$0.430
|
$0.430
|
$0.450
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
84,920.000
|
$0.300
|
$0.500
|
$0.280
|
$0.350
|
$0.350
|
$0.350
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
889.000
|
$2.500
|
$15.000
|
$4.110
|
$6.340
|
$6.340
|
$6.350
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
80,500.000
|
$0.200
|
$0.500
|
$0.280
|
$0.350
|
$0.350
|
$0.350
|
|
REFL PAV MRK TY I (W)8"(LNDP)(100MIL)
|
LF
|
180.000
|
$2.000
|
$1.950
|
$1.230
|
$2.500
|
$2.500
|
$2.500
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
20,890.000
|
$1.000
|
$1.200
|
$1.140
|
$1.190
|
$1.190
|
$1.200
|
|
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
|
LF
|
1,665.000
|
$3.500
|
$2.400
|
$2.040
|
$2.870
|
$2.870
|
$2.850
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
6,927.000
|
$3.500
|
$5.350
|
$2.040
|
$3.570
|
$3.360
|
$3.550
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
1,127.000
|
$6.000
|
$9.600
|
$6.380
|
$6.770
|
$6.770
|
$6.750
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
1,060.000
|
$4.000
|
$5.350
|
$2.050
|
$3.770
|
$3.770
|
$3.750
|
|
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
|
LF
|
7,980.000
|
$1.000
|
$0.820
|
$1.490
|
$0.970
|
$0.970
|
$0.950
|
|
|
PAVEMENT SEALER 4"
|
LF
|
152,083.000
|
$0.200
|
$0.150
|
$0.110
|
$0.150
|
$0.150
|
$0.150
|
|
|
PAVEMENT SEALER 6"
|
LF
|
15,960.000
|
$0.300
|
$0.180
|
$0.200
|
$0.200
|
$0.200
|
$0.200
|
|
|
PAVEMENT SEALER 8"
|
LF
|
21,026.000
|
$0.300
|
$0.290
|
$0.260
|
$0.360
|
$0.360
|
$0.350
|
|
|
PAVEMENT SEALER 12"
|
LF
|
9,652.000
|
$1.000
|
$1.050
|
$0.510
|
$0.550
|
$0.550
|
$0.550
|
|
|
PAVEMENT SEALER 24"
|
LF
|
1,127.000
|
$3.000
|
$1.850
|
$0.870
|
$1.480
|
$1.480
|
$1.500
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
34.000
|
$30.000
|
$38.000
|
$231.080
|
$37.000
|
$37.000
|
$37.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
37.000
|
$57.000
|
$46.000
|
$35.950
|
$54.000
|
$54.000
|
$54.000
|
|
|
PAVEMENT SEALER (UTURN ARROW)
|
EA
|
3.000
|
$35.000
|
$55.000
|
$35.950
|
$52.000
|
$52.000
|
$52.000
|
|
|
PAVEMENT SEALER (YLD TRI)
|
EA
|
44.000
|
$15.000
|
$16.750
|
$5.140
|
$17.000
|
$17.000
|
$17.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
9,585.000
|
$0.500
|
$0.670
|
$0.720
|
$0.600
|
$0.600
|
$0.600
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
70,743.000
|
$0.500
|
$0.570
|
$0.720
|
$0.520
|
$0.520
|
$0.500
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
7,980.000
|
$0.600
|
$0.890
|
$0.770
|
$0.830
|
$0.830
|
$0.850
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
71,755.000
|
$0.500
|
$0.570
|
$0.720
|
$0.520
|
$0.520
|
$0.500
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
34.000
|
$265.000
|
$332.000
|
$179.730
|
$247.000
|
$247.000
|
$247.000
|
|
PREFAB PAV MRK TY C (W) (UTURN ARROW)
|
EA
|
3.000
|
$376.000
|
$558.000
|
$359.460
|
$413.000
|
$413.000
|
$413.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
37.000
|
$250.000
|
$436.000
|
$282.430
|
$337.000
|
$337.000
|
$337.000
|
|
PREFAB PAV MRK TY C (W) (18")(YLD TRI)
|
EA
|
44.000
|
$40.000
|
$80.000
|
$25.680
|
$57.000
|
$57.000
|
$57.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
276.000
|
$4.000
|
$5.500
|
$4.110
|
$5.130
|
$5.130
|
$5.150
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
2,137.000
|
$5.000
|
$5.550
|
$4.060
|
$4.750
|
$4.750
|
$4.750
|
|
TRAFFIC BUTTON TY W
|
EA
|
475.000
|
$5.000
|
$5.500
|
$2.720
|
$4.400
|
$4.400
|
$4.400
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
298,611.000
|
$0.500
|
$0.500
|
$0.760
|
$0.480
|
$0.480
|
$0.500
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
3,987.000
|
$1.000
|
$0.970
|
$1.230
|
$0.690
|
$0.690
|
$0.700
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
155.000
|
$2.000
|
$2.400
|
$2.040
|
$2.000
|
$2.000
|
$2.000
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
939.000
|
$4.000
|
$4.850
|
$2.520
|
$4.000
|
$4.000
|
$4.000
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
6.000
|
$60.000
|
$57.000
|
$46.220
|
$70.000
|
$70.000
|
$70.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
6.000
|
$82.000
|
$67.000
|
$66.760
|
$95.000
|
$95.000
|
$95.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
152,083.000
|
$0.100
|
$0.020
|
$0.100
|
$0.110
|
$0.110
|
$0.100
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
15,960.000
|
$0.150
|
$0.020
|
$0.150
|
$0.170
|
$0.170
|
$0.150
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
21,026.000
|
$0.200
|
$0.090
|
$0.310
|
$0.210
|
$0.210
|
$0.200
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
9,652.000
|
$1.000
|
$0.400
|
$0.510
|
$0.730
|
$0.730
|
$0.750
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
1,127.000
|
$1.500
|
$0.710
|
$0.900
|
$1.470
|
$1.470
|
$1.450
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
34.000
|
$30.000
|
$17.250
|
$15.410
|
$37.000
|
$37.000
|
$37.000
|
|
|
PAV SURF PREP FOR MRK (UTURN ARR)
|
EA
|
3.000
|
$32.000
|
$24.000
|
$25.670
|
$47.000
|
$47.000
|
$47.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
37.000
|
$40.000
|
$20.000
|
$25.680
|
$52.000
|
$52.000
|
$52.000
|
|
|
PAV SURF PREP FOR MRK (18")(YLD TRI)
|
EA
|
44.000
|
$8.000
|
$10.000
|
$5.140
|
$17.000
|
$17.000
|
$17.000
|
|
|
INSTALL HWY TRF SIG (ISOLATED)
|
EA
|
2.000
|
$22,000.000
|
$71,500.000
|
$75,330.910
|
$44,625.000
|
$43,750.000
|
$43,750.000
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
2.000
|
$4,555.000
|
$10,500.000
|
$11,062.580
|
$7,930.500
|
$7,775.000
|
$7,780.000
|
|
|
TEMP TRAF SIGNALS
|
EA
|
3.000
|
$60,000.000
|
$192,500.000
|
$202,813.960
|
$69,360.000
|
$68,000.000
|
$68,000.000
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
18.000
|
$294.000
|
$660.000
|
$695.360
|
$304.980
|
$299.000
|
$299.000
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
12.000
|
$296.000
|
$660.000
|
$695.360
|
$300.900
|
$295.000
|
$295.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
26.000
|
$288.000
|
$660.000
|
$695.360
|
$304.980
|
$299.000
|
$299.000
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
8.000
|
$295.000
|
$660.000
|
$695.360
|
$300.900
|
$295.000
|
$295.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
26.000
|
$281.000
|
$660.000
|
$695.360
|
$304.980
|
$299.000
|
$299.000
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
8.000
|
$294.000
|
$660.000
|
$695.360
|
$300.900
|
$295.000
|
$295.000
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
24.000
|
$766.000
|
$1,320.000
|
$1,390.720
|
$943.500
|
$925.000
|
$925.000
|
|
|
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
|
EA
|
26.000
|
$265.000
|
$290.000
|
$305.540
|
$158.100
|
$155.000
|
$155.000
|
|
|
BACKPLATE W/REF BRDR(5 SEC)(VENT)ALUM
|
EA
|
4.000
|
$300.000
|
$330.000
|
$347.680
|
$173.400
|
$170.000
|
$170.000
|
|
|
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
|
LF
|
6,252.000
|
$2.000
|
$3.300
|
$3.480
|
$3.930
|
$3.850
|
$3.850
|
|
|
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
|
LF
|
250.000
|
$2.500
|
$4.400
|
$4.640
|
$4.200
|
$4.120
|
$4.100
|
|
|
TRF SIG CBL (TY A)(14 AWG)(16 CONDR)
|
LF
|
3,230.000
|
$5.000
|
$9.900
|
$10.430
|
$4.980
|
$4.880
|
$4.900
|
|
|
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
|
LF
|
7,220.000
|
$2.000
|
$3.300
|
$3.480
|
$2.600
|
$2.550
|
$2.550
|
|
|
INS TRF SIG PL AM(S)1 ARM(32')
|
EA
|
2.000
|
$8,500.000
|
$14,850.000
|
$15,645.650
|
$16,197.600
|
$15,880.000
|
$15,880.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(36')
|
EA
|
1.000
|
$12,000.000
|
$15,950.000
|
$16,804.590
|
$19,257.600
|
$18,880.000
|
$18,880.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(36')LUM
|
EA
|
1.000
|
$11,000.000
|
$18,040.000
|
$19,006.560
|
$21,777.000
|
$21,350.000
|
$21,350.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(40')LUM
|
EA
|
4.000
|
$13,000.000
|
$19,140.000
|
$20,165.500
|
$25,500.000
|
$25,000.000
|
$25,000.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(44')
|
EA
|
1.000
|
$12,000.000
|
$17,600.000
|
$18,542.990
|
$28,243.800
|
$37,960.000
|
$27,690.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(44')LUM
|
EA
|
2.000
|
$12,000.000
|
$19,480.000
|
$20,523.720
|
$30,375.600
|
$29,780.000
|
$29,780.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(55')LUM
|
EA
|
1.000
|
$31,000.000
|
$43,780.000
|
$46,125.690
|
$35,700.000
|
$35,000.000
|
$35,000.000
|
|
|
PED POLE ASSEMBLY
|
EA
|
16.000
|
$2,440.000
|
$6,050.000
|
$6,374.150
|
$2,601.000
|
$2,550.000
|
$2,550.000
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
24.000
|
$777.000
|
$1,320.000
|
$1,390.720
|
$882.300
|
$865.000
|
$865.000
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
4.000
|
$3,141.000
|
$5,225.000
|
$5,504.950
|
$3,967.800
|
$3,890.000
|
$3,890.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
8.000
|
$4,000.000
|
$3,000.000
|
$2,604.900
|
$2,630.000
|
$5,555.880
|
$4,410.000
|
|
|
LITTER REMOVAL
|
CYC
|
8.000
|
$2,000.000
|
$1,000.000
|
$2,607.250
|
$2,500.000
|
$2,150.270
|
$2,210.000
|
|
|
DEBRIS REMOVAL (FRONTAGE ROADS)
|
CYC
|
8.000
|
$2,000.000
|
$1,000.000
|
$1,564.350
|
$1,500.000
|
$2,150.270
|
$2,210.000
|
|
|
CLEANING / SWEEPING (FRONTAGE ROAD)
|
CYC
|
8.000
|
$3,000.000
|
$1,500.000
|
$2,085.800
|
$2,000.000
|
$2,004.180
|
$2,910.000
|
|
|
TREE REMOVAL (4" - 12" DIA)
|
EA
|
73.000
|
$200.000
|
$50.000
|
$361.250
|
$200.000
|
$210.000
|
$210.000
|
|
|
TREE REMOVAL (12" - 18" DIA)
|
EA
|
40.000
|
$300.000
|
$60.000
|
$490.270
|
$200.000
|
$285.000
|
$285.000
|
|
|
TREE REMOVAL (18" - 24" DIA)
|
EA
|
22.000
|
$400.000
|
$70.000
|
$584.880
|
$220.000
|
$340.000
|
$340.000
|
|
|
TREE REMOVAL (24" - 30" DIA)
|
EA
|
18.000
|
$500.000
|
$80.000
|
$645.090
|
$230.000
|
$375.000
|
$375.000
|
|
|
TREE REMOVAL (30" - 36" DIA)
|
EA
|
12.000
|
$600.000
|
$90.000
|
$731.100
|
$260.000
|
$425.000
|
$425.000
|
|
|
TREE REMOVAL (36" - 42" DIA)
|
EA
|
10.000
|
$700.000
|
$100.000
|
$817.110
|
$275.000
|
$475.000
|
$475.000
|
|
|
CNC CRACK REPAIR (DISCRETE)(INJECT)
|
LF
|
280.000
|
$100.000
|
$230.000
|
$109.500
|
$105.000
|
$12.000
|
$138.000
|
|
|
NO. OF WORKING DAYS
|
$/D
|
15,000.000
|
$936.000
|
$780.000
|
$780.000
|
$801.000
|
$860.000
|
$780.000
|
|
|
SP MIXES SP-B PG64-22
|
TON
|
45,198.000
|
$103.000
|
$92.800
|
$105.830
|
$95.000
|
$92.800
|
$93.500
|
|
|
TIP TESTING(DRILL SHAFT)
|
EA
|
2.000
|
$10,000.000
|
$5,000.000
|
$5,668.930
|
$5,400.000
|
$1,200.000
|
$6,030.000
|
|
|
INSTALL FTB
|
LF
|
400.000
|
$60.000
|
$80.000
|
$46.640
|
$25.000
|
$17.240
|
$61.000
|
|
|
REMOVE FTB
|
LF
|
400.000
|
$15.000
|
$20.000
|
$7.590
|
$2.000
|
$6.060
|
$16.900
|
|
|
LEAD CONTAINING COATING MNGMT-12" STRIP
|
EA
|
28.000
|
$650.000
|
$325.000
|
$533.760
|
$275.000
|
$275.000
|
$300.000
|
|
|
LEAD CONTAINING COATING MNGMT -6" STRIP
|
EA
|
12.000
|
$575.000
|
$400.000
|
$438.760
|
$185.000
|
$185.000
|
$202.000
|
|
|
LEAD CONTAINING COATING MNGMT -4" STRIP
|
EA
|
43.000
|
$500.000
|
$200.000
|
$396.930
|
$145.000
|
$145.000
|
$158.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$11,000.000
|
$9,500.000
|
$19,915.830
|
$17,000.000
|
$15,397.120
|
$12,360.000
|
|
|
ITS COM CBL (ETHERNET)
|
LF
|
60.000
|
$2.100
|
$19.000
|
$20.020
|
$3.060
|
$3.000
|
$3.000
|
|
|
CCTV FIELD EQUIPMENT (DIGITAL)
|
EA
|
2.000
|
$6,666.000
|
$9,850.000
|
$10,377.760
|
$8,160.000
|
$8,000.000
|
$8,000.000
|
|
|
CCTV MOUNT (POST)
|
EA
|
2.000
|
$2,000.000
|
$765.000
|
$805.990
|
$1,224.000
|
$1,200.000
|
$1,200.000
|
|
|
INSTALL DMS (FOUNDATION MTD CABINET)
|
EA
|
1.000
|
$10,000.000
|
$31,805.000
|
$33,509.070
|
$10,761.000
|
$10,550.000
|
$10,550.000
|
|
|
BBU SYSTEM (EXTERNAL BATT CABINET)
|
EA
|
2.000
|
$7,000.000
|
$10,120.000
|
$10,662.220
|
$7,701.000
|
$7,550.000
|
$7,550.000
|
|
|
ITS RADIO (SNGL)(5 GHZ)-C-P
|
EA
|
6.000
|
$4,000.000
|
$7,585.000
|
$7,991.400
|
$8,639.400
|
$8,470.000
|
$8,470.000
|
|
|
ITS POLE (60 FT)(90 MPH)
|
EA
|
2.000
|
$16,500.000
|
$20,570.000
|
$21,672.120
|
$24,480.000
|
$24,000.000
|
$24,000.000
|
|
|
ITS POLE MNT CAB (TY 3)(CONF 1)
|
EA
|
2.000
|
$2,000.000
|
$7,000.000
|
$7,375.050
|
$7,027.800
|
$6,890.000
|
$6,890.000
|
|
|
DEAD END ROADWAY BARRICADE
|
LF
|
96.000
|
$115.000
|
$75.000
|
$42.490
|
$70.000
|
$37.380
|
$103.000
|
|
|
TMA (STATIONARY)
|
DAY
|
300.000
|
$155.000
|
$150.000
|
$155.830
|
$165.000
|
$915.780
|
$162.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
200.000
|
$80.000
|
$125.000
|
$61.790
|
$80.000
|
$373.480
|
$92.000
|
|
|
RVDS(PRESENCE DETECTION ONLY)
|
EA
|
8.000
|
$7,900.000
|
$10,780.000
|
$11,357.580
|
$9,129.000
|
$8,950.000
|
$8,950.000
|
|
|
RVDS(PRESENCE AND ADVANCE DET)
|
EA
|
4.000
|
$8,000.000
|
$10,780.000
|
$11,357.580
|
$10,893.600
|
$10,680.000
|
$10,680.000
|
|
|
ITS RVSD (DATA COLLECT & WWA) SYS
|
EA
|
2.000
|
$13,000.000
|
$16,465.000
|
$17,347.180
|
$12,202.210
|
$11,962.000
|
$11,960.000
|
|
|
VIVDS TEMPORARY
|
EA
|
3.000
|
$20,000.000
|
$34,100.000
|
$35,927.040
|
$41,820.000
|
$41,000.000
|
$41,000.000
|
|
Totals: |
$116,042,403.520
|
$107,231,732.400
|
$107,650,286.470
|
$107,991,334.355
|
$110,142,203.893
|
$116,610,242.115
|