Show Job Controls
Bid Cobra

DENTON IH 35 (0195-03-100)

Items: 151

County: DENTON
Length: N/A
Highway: IH 35
District: DALLAS
Control Number: 0195-03-100
DBE Goal: N/A
Project: F 2021(900)
Guaranty: N/A
Time: 120 WORKING DAYS
Engineer's Estimate: $1,634,919.57
Date: 07/02/2021 (4 years ago)
Contract Number: N/A
Type: CONSTRUCT RAMPS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (4)
E
Engineer's Estimate
$1,634,919.57
$1,834,246.32
Over/Under Est: 12.19% $199,326.75
Over/Under Est: 15.07% $246,414.46
Amt Left: 2.57% $47,087.71
Over/Under Est: 19.81% $323,819.34
Amt Left: 6.79% $124,492.59
Delta: -4.11% -$77,404.88
$2,190,624.83
Over/Under Est: 33.99% $555,705.26
Amt Left: 19.43% $356,378.51
Delta: -11.84% -$231,885.92

Bid Items & Bid Tabulations

151 Total 0 of 151
DENTON  |  IH 35  |  DALLAS  |  0195-03-100  |  07/02/2021  |  $1,634,919.57  |  F 2021(900)  |  CONSTRUCT RAMPS  |  120 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JAGOE-PUBLIC COMPANY
ACCELERATED CRITICAL PATH, INC.
NEW WORLD CONTRACTING, LLC
ALTUS CONSTRUCTION LLC
PREPARING ROW
STA 75.450 $1,000.000 $200.000 $100.000 $1,683.000 $1,247.570
REMOVING CONC (PAV)
SY 1,402.000 $7.900 $22.000 $25.000 $10.000 $8.020
REMOVING CONC (MEDIANS)
SY 124.000 $23.730 $25.000 $35.000 $10.000 $15.200
REMOVING STAB BASE AND ASPH PAV (0-4")
SY 662.000 $10.030 $4.500 $11.000 $5.000 $11.950
EXCAVATION (ROADWAY)
CY 2,412.000 $15.000 $15.000 $14.000 $20.000 $18.130
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
CY 245.000 $5.750 $15.000 $25.000 $15.000 $18.690
BACKFILLING PAVEMENT EDGES
CY 110.000 $37.080 $48.000 $90.000 $3.000 $49.650
COMPOST MANUF TOPSOIL (4")
SY 7,228.000 $0.860 $1.000 $4.000 $1.000 $0.920
BLOCK SODDING
SY 7,228.000 $2.830 $3.500 $2.900 $3.000 $3.390
VEGETATIVE WATERING
MG 269.000 $50.000 $30.000 $29.000 $24.000 $37.490
LIME (HYDRATED LIME (SLURRY))
TON 107.000 $172.000 $185.000 $210.000 $261.000 $312.130
LIME TRT(MIX EXST MATL & NEW BASE)(8")
SY 8,385.000 $3.500 $4.000 $8.000 $4.000 $9.660
SALV, HAUL STKPL RCL ASPH PAV(0"TO 24")
SY 3,488.000 $5.000 $2.500 $12.000 $5.000 $7.910
DRILL SHAFT (SIGN MTS) (24 IN)
LF 10.000 $170.000 $250.000 $230.000 $241.000 $274.470
DRILL SHAFT (SIGN MTS) (42 IN)
LF 16.000 $419.000 $530.000 $460.000 $507.000 $555.170
DRILL SHAFT (SIGN MTS) (48 IN)
LF 16.000 $428.000 $590.000 $525.000 $543.000 $622.540
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 30.000 $250.000 $350.000 $205.000 $339.000 $243.280
RIPRAP (CONC)(4 IN)
CY 29.100 $360.140 $720.000 $500.000 $429.000 $417.610
RIPRAP (MOW STRIP)(4 IN)
CY 22.000 $340.110 $750.000 $1,400.000 $500.000 $417.610
RC PIPE (CL III)(24 IN)
LF 8.000 $70.000 $140.000 $280.000 $103.000 $218.320
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 1.000 $4,400.000 $5,100.000 $8,000.000 $6,059.000 $7,070.360
CLEAN EXIST CULVERTS
EA 1.000 $2,500.000 $770.000 $4,000.000 $2,805.000 $2,371.080
REMOV STR (HEADWALL)
EA 1.000 $918.380 $2,300.000 $500.000 $7,854.000 $1,888.140
REMOV STR (PIPE)
LF 4.000 $14.700 $120.000 $70.000 $34.000 $249.510
MOBILIZATION
LS 1.000 $143,000.000 $180,000.000 $209,000.000 $194,000.000 $218,325.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $15,000.000 $17,500.000 $8,000.000 $6,171.000 $12,475.710
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 124.000 $17.040 $10.000 $46.000 $27.000 $23.170
CONSTRUCTION EXITS (REMOVE)
SY 124.000 $5.230 $5.000 $14.500 $9.000 $7.900
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 2,954.000 $3.270 $5.000 $5.370 $5.000 $6.290
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,954.000 $0.720 $0.350 $0.420 $1.000 $1.250
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 1,980.000 $16.180 $50.000 $9.000 $57.000 $13.480
CONC CURB (TY II)
LF 456.000 $30.000 $13.000 $60.000 $19.000 $24.180
CONC CURB (TY III)
LF 1,620.000 $30.000 $6.000 $20.000 $17.000 $15.900
CONC CURB (TY IV)
LF 604.000 $10.000 $11.000 $30.000 $10.000 $24.060
CURB RAMPS (TY 1)
EA 1.000 $1,505.630 $2,400.000 $3,500.000 $2,020.000 $1,784.580
CONC MEDIAN
SY 27.000 $70.000 $180.000 $130.000 $80.000 $221.870
MTL W-BEAM GD FEN (TIM POST)
LF 662.500 $20.410 $31.000 $22.000 $24.000 $26.150
TERMINAL ANCHOR SECTION
EA 2.000 $1,730.000 $1,600.000 $1,100.000 $1,164.000 $1,730.830
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,050.000 $1,600.000 $1,100.000 $1,164.000 $3,776.850
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 25.000 $925.000 $46.000 $38.000 $40.000 $57.820
REMOVE METAL BEAM GUARD FENCE
LF 519.000 $2.210 $4.500 $3.150 $2.000 $3.400
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,484.330 $3,200.000 $2,800.000 $2,968.000 $3,083.420
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $212.500 $290.000 $210.000 $224.000 $457.520
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $717.270 $1,500.000 $200.000 $561.000 $833.280
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 1.000 $6,740.910 $15,000.000 $11,000.000 $8,348.000 $4,008.860
RELOCATE RD IL ASM (TRANS-BASE)
EA 3.000 $1,700.000 $1,300.000 $2,100.000 $1,253.000 $2,457.720
CONDT (PVC) (SCH 40) (2")
LF 885.000 $8.500 $13.000 $17.000 $13.000 $20.960
CONDT (PVC) (SCH 40) (2") (BORE)
LF 700.000 $23.000 $24.000 $18.000 $23.000 $21.580
CONDT (PVC) (SCH 40) (3")
LF 5,584.000 $9.500 $18.000 $23.000 $17.000 $27.760
CONDT (PVC) (SCH 40) (3") (BORE)
LF 2,183.000 $25.000 $31.000 $22.000 $30.000 $25.950
CONDT (PVC) (SCH 40) (4")
LF 120.000 $20.000 $32.000 $24.000 $31.000 $28.820
CONDT (PVC) (SCH 40) (4") (BORE)
LF 83.000 $26.000 $62.000 $51.000 $60.000 $60.510
ELEC CONDR (NO.8) BARE
LF 1,605.000 $1.250 $1.600 $2.100 $2.000 $2.500
ELEC CONDR (NO.8) INSULATED
LF 6,720.000 $1.350 $1.700 $2.400 $2.000 $2.810
ELEC CONDR (NO.6) BARE
LF 1,068.000 $1.300 $2.150 $4.500 $2.000 $5.240
TRAY CABLE (3 CONDR) (12 AWG)
LF 986.000 $1.800 $3.250 $4.500 $3.000 $5.240
GROUND BOX TY C (162911)W/APRON
EA 1.000 $1,041.000 $1,300.000 $2,200.000 $1,228.000 $2,619.900
ALUMINUM SIGNS (TY A)
SF 15.580 $30.000 $74.000 $95.000 $72.000 $112.280
ALUMINUM SIGNS (TY G)
SF 120.000 $31.500 $36.000 $29.000 $35.000 $33.680
ALUMINUM SIGNS (TY O)
SF 378.250 $29.500 $35.000 $28.000 $34.000 $32.440
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 7.000 $736.000 $470.000 $800.000 $454.000 $954.390
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 9.000 $709.000 $640.000 $990.000 $620.000 $1,166.480
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000 $762.000 $790.000 $1,100.000 $765.000 $1,291.240
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 2.000 $928.000 $760.000 $1,200.000 $731.000 $1,403.520
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 2.000 $952.750 $900.000 $1,380.000 $872.000 $1,634.320
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
EA 1.000 $1,949.000 $1,500.000 $2,600.000 $1,414.000 $3,200.020
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 1.000 $505.000 $580.000 $1,200.000 $565.000 $1,478.370
RELOCATE SM RD SN SUP&AM TY S80
EA 1.000 $564.000 $670.000 $1,150.000 $648.000 $1,366.090
REMOVE SM RD SN SUP&AM
EA 20.000 $85.000 $250.000 $265.000 $246.000 $311.890
INSTALL LRSS (STRUCT STEEL)
LB 345.000 $6.750 $21.000 $7.500 $20.000 $8.730
REMOVE LRSA
EA 1.000 $1,089.000 $510.000 $800.000 $491.000 $935.680
INS OH SN SUP(30 FT CANT)
EA 1.000 $27,371.000 $26,000.000 $26,000.000 $25,075.000 $30,284.800
INS OH SN SUP(35 FT CANT)
EA 1.000 $27,343.000 $31,000.000 $29,000.000 $30,014.000 $34,539.010
REMOVE OVERHD SIGN SUP
EA 2.000 $7,662.750 $2,900.000 $5,100.000 $2,777.000 $6,025.770
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
EA 20.000 $25.000 $70.000 $64.000 $45.000 $100.430
INSTL DEL ASSM (D-SW)SZ 1(WFLX)SRF
EA 12.000 $25.000 $95.000 $79.000 $100.000 $143.470
REFL PAV MRK TY I (W)4"(LNDP)(100MIL)
LF 746.000 $1.070 $0.700 $1.550 $2.000 $1.810
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 830.000 $1.710 $1.400 $1.050 $1.000 $1.250
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
LF 243.000 $2.600 $3.500 $2.450 $3.000 $2.930
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 180.000 $3.740 $3.500 $4.000 $4.000 $4.550
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 146.000 $2.600 $11.600 $7.400 $8.000 $8.730
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 4.000 $120.590 $230.000 $127.000 $145.000 $149.710
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
EA 1.000 $220.000 $460.000 $240.000 $277.000 $286.940
REFL PAV MRK TY I(W)(U-LT ARW)(100 MIL)
EA 2.000 $157.000 $460.000 $335.000 $386.000 $399.220
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
EA 5.000 $270.470 $580.000 $360.000 $410.000 $424.170
REFL PAV MRK TY I (W)(NUMBER)(100MIL)
EA 1.000 $460.000 $520.000 $210.000 $241.000 $249.510
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 5.000 $192.140 $290.000 $165.000 $187.000 $193.370
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
EA 3.000 $750.000 $1,300.000 $680.000 $784.000 $810.920
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
EA 2.000 $907.140 $2,000.000 $790.000 $905.000 $935.680
RE PV MRK TY I(BLACK)4"(SHADOW)(100MIL)
LF 65.000 $1.500 $5.850 $4.200 $5.000 $4.990
PAVEMENT SEALER 4"
LF 13,487.000 $0.140 $0.150 $0.120 $0.200 $0.150
PAVEMENT SEALER 8"
LF 495.000 $33.000 $0.350 $0.320 $0.200 $0.370
PAVEMENT SEALER 12"
LF 180.000 $0.800 $0.950 $1.100 $1.000 $1.250
PAVEMENT SEALER 24"
LF 73.000 $1.800 $0.950 $2.100 $2.000 $2.500
PAVEMENT SEALER (ARROW)
EA 3.000 $21.870 $50.000 $37.000 $42.000 $43.660
PAVEMENT SEALER (WORD)
EA 3.000 $35.000 $75.000 $58.000 $66.000 $68.620
PAVEMENT SEALER (DBL ARROW)
EA 1.000 $35.000 $75.000 $47.000 $54.000 $56.140
PAVEMENT SEALER (LNDP ARROW)
EA 5.000 $109.070 $100.000 $58.000 $66.000 $68.620
PAVEMENT SEALER (U-L ARROW)
EA 1.000 $190.000 $100.000 $58.000 $66.000 $68.620
PAVEMENT SEALER (ENTR GORE)
EA 2.000 $251.540 $500.000 $240.000 $277.000 $286.940
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 1,726.000 $0.630 $0.700 $0.470 $1.000 $0.560
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 10,640.000 $0.410 $0.700 $0.430 $0.500 $0.510
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 4,483.000 $0.440 $0.700 $0.430 $0.500 $0.510
REFL PAV MRKR TY I-C
EA 41.000 $4.640 $5.800 $4.200 $5.000 $4.990
REFL PAV MRKR TY II-C-R
EA 307.000 $4.130 $5.800 $4.200 $5.000 $4.990
ELIM EXT PAV MRK & MRKS (4")
LF 7,725.000 $0.410 $0.700 $0.430 $0.500 $0.510
ELIM EXT PAV MRK & MRKS (8")
LF 467.000 $0.680 $1.500 $0.800 $1.000 $0.940
ELIM EXT PAV MRK & MRKS (12")
LF 402.000 $1.550 $2.500 $1.550 $2.000 $1.850
ELIM EXT PAV MRK & MRKS (24")
LF 467.000 $2.910 $4.000 $3.150 $4.000 $3.740
ELIM EXT PAV MRK & MRKS (ARROW)
EA 3.000 $46.910 $50.000 $38.000 $43.000 $44.910
ELIM EXT PAV MRK & MRKS (DBL ARROW)
EA 1.000 $57.810 $75.000 $76.000 $87.000 $89.830
ELIM EXT PAV MRK & MRKS (NUMBER)
EA 1.000 $85.560 $75.000 $47.000 $54.000 $56.140
ELIM EXT PAV MRK & MRKS (WORD)
EA 2.000 $44.000 $75.000 $58.000 $66.000 $68.620
ELIM EXT PAV MRK & MRKS (ENTR GORE)
EA 1.000 $710.000 $300.000 $265.000 $302.000 $311.890
ELIM EXT PAV MRK & MRKS (EXIT GORE)
EA 2.000 $376.250 $300.000 $317.000 $362.000 $374.270
PAV SURF PREP FOR MRK (4")
LF 17,660.000 $0.110 $0.150 $0.120 $0.150 $0.150
PAV SURF PREP FOR MRK (8")
LF 830.000 $0.480 $0.300 $0.250 $0.300 $0.300
PAV SURF PREP FOR MRK (12")
LF 423.000 $0.650 $0.450 $0.530 $1.000 $0.620
PAV SURF PREP FOR MRK (24")
LF 73.000 $0.750 $0.900 $1.060 $1.000 $1.250
PAV SURF PREP FOR MRK (ARROW)
EA 9.000 $21.180 $25.000 $18.000 $21.000 $21.210
PAV SURF PREP FOR MRK (DBL ARROW)
EA 1.000 $33.000 $50.000 $34.000 $39.000 $39.920
PAV SURF PREP FOR MRK (U/LT ARROW)
EA 2.000 $30.430 $75.000 $42.000 $48.000 $49.900
PAV SURF PREP FOR MRK (NUMBER)
EA 1.000 $25.000 $75.000 $21.000 $24.000 $24.950
PAV SURF PREP FOR MRK (WORD)
EA 5.000 $30.430 $75.000 $47.000 $54.000 $56.140
PAV SURF PREP FOR MRK (ENTR GORE)
EA 3.000 $154.090 $400.000 $210.000 $241.000 $249.510
PAV SURF PREP FOR MRK (EXIT GORE)
EA 2.000 $201.760 $400.000 $210.000 $241.000 $249.510
PAV SURF PREP FOR MRK (RPM)
EA 348.000 $0.370 $1.000 $1.050 $1.000 $1.250
INSTALL HWY TRF SIG (UPGRADE)
EA 1.000 $7,417.000 $10,500.000 $21,300.000 $10,066.000 $25,575.210
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 10.000 $1.800 $2.600 $4.750 $3.000 $5.610
TRF SIG CBL (TY A)(14 AWG)(10 CONDR)
LF 1,297.000 $4.200 $3.300 $5.500 $3.000 $6.550
TRF SIG CBL (TY A)(14 AWG)(20 CONDR)
LF 902.000 $5.000 $5.500 $7.800 $5.000 $9.170
RELOCATE PED POLE ASSEMBLY
EA 1.000 $942.000 $2,000.000 $7,200.000 $1,926.000 $8,514.670
FULL - WIDTH MOWING
AC 2.000 $350.000 $40.000 $900.000 $349.000 $159.650
LITTER REMOVAL
AC 16.000 $1,500.000 $215.000 $120.000 $180.000 $99.810
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
CYC 8.000 $200.000 $1,300.000 $475.000 $673.000 $1,962.110
SP MIXES SP-B PG64-22
TON 4,247.000 $81.000 $75.000 $79.000 $94.000 $104.110
SP MIXES SP-C SAC-A PG70-22
TON 849.000 $100.000 $100.000 $109.000 $107.000 $118.890
TACK COAT
GAL 1,159.000 $2.500 $2.500 $7.000 $3.000 $3.430
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $9,100.000 $7,500.000 $4,500.000 $2,244.000 $6,237.860
FIBER OPTIC CBL (SNGLE-MODE)(48 FIBER)
LF 5,158.000 $4.000 $5.750 $3.300 $6.000 $3.930
FIBER OPTIC CBL (SNGLE-MODE)(72 FIBER)
LF 2,579.000 $5.500 $8.500 $3.650 $8.000 $4.300
FO SPLICE ENCLOSURE (TYPE 1)
EA 6.000 $2,100.000 $1,600.000 $2,400.000 $1,550.000 $2,807.040
FIBER OPTIC FUSION SPLICE
EA 336.000 $25.000 $55.000 $56.000 $53.000 $66.430
REMOVE FIBER OPTIC CABLE
LF 7,587.000 $1.350 $2.500 $2.700 $2.000 $3.180
ITS MULTI-DUCT CND (PVC-40)
LF 1,819.000 $14.000 $30.000 $31.000 $29.000 $36.490
ITS MULTI-DUCT CND (PVC-40)(BORE)
LF 700.000 $28.000 $46.000 $29.000 $45.000 $34.120
CONDUIT (PREPARE)
LF 852.000 $1.600 $6.500 $4.450 $6.000 $5.240
GROUND BOX (PREPARE)
EA 10.000 $300.000 $510.000 $500.000 $491.000 $586.360
TMA (STATIONARY)
DAY 120.000 $100.000 $210.000 $75.000 $150.000 $175.230
ITS GND BOX(PCAST) TY 1 (243660)W/APRN
EA 4.000 $3,600.000 $4,900.000 $4,200.000 $4,701.000 $5,015.240
REMOVE ITS GROUND BOX
EA 6.000 $1,000.000 $890.000 $525.000 $860.000 $617.550
Totals: $1,634,919.574 $1,834,246.320 $1,881,334.030 $1,958,738.910 $2,190,624.845