Show Job Controls
Bid Cobra

DENTON IH 35E (0195-03-088)

Items: 135

County: DENTON
Length: N/A
Highway: IH 35E
District: DALLAS
Control Number: 0195-03-088
DBE Goal: 600.0%
Project: BR 2B24(289)
Guaranty: N/A
Time: 377 WORKING DAYS
Engineer's Estimate: $13,211,118.18
Date: 08/02/2024 (1 year ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$13,211,118.18
$11,749,150.19
Over/Under Est: -11.07% -$1,461,967.99
Over/Under Est: -8.93% -$1,179,255.66
Amt Left: 2.41% $282,712.33
Over/Under Est: -3.18% -$419,683.43
Amt Left: 8.87% $1,042,284.56
Delta: -6.31% -$759,572.23
$14,371,512.41
Over/Under Est: 8.78% $1,160,394.23
Amt Left: 22.32% $2,622,362.22
Delta: -12.35% -$1,580,077.66
Over/Under Est: 11.55% $1,526,501.83
Amt Left: 25.44% $2,988,469.82
Delta: -2.55% -$366,107.60
Over/Under Est: 18.65% $2,463,500.42
Amt Left: 33.41% $3,925,468.41
Delta: -6.36% -$936,998.59
Subcontractor Percentage Amount
JB PINNACLE GROUP, LLC 0.70% $82,325.99
HERMANOS STEEL, LLC 0.50% $58,804.28
ACT SAW CUTTING & REMOVAL 0.16% $18,817.37
MICA CORPORATION 0.13% $15,289.11
FORTSON CONTRACTING, INC. 0.00% $0.00
HILBASH INVESTMENT LLC 0.00% $0.00
JAGOE-PUBLIC COMPANY 0.00% $0.00
LEGACY CONSTRUCTION MANAGEMENT SERVICES, LLC 0.00% $0.00
SCOTT DERR PAINTING CO, LLC 0.00% $0.00
SOUTHEAST GRINDING AND GROOVING LLC 0.00% $0.00
A. E. MOORE CONSTRUCTION, INC. 0.00% $0.00
TEXAS SHAFTS, INC. 0.00% $0.00
ACTION SERVICES 0.00% $0.00
BARRICADES UNLIMITED 0.00% $0.00
DUSTROL, INC. 0.00% $0.00
Total: 1.49% $175,236.75

Bid Items & Bid Tabulations

135 Total 0 of 135
DENTON  |  IH 35E  |  DALLAS  |  0195-03-088  |  08/02/2024  |  $13,211,118.18  |  BR 2B24(289)  |  BRIDGE REPL  |  377 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
INDUS ROAD & BRIDGE, INC.
GRANITE CONSTRUCTION COMPANY
STERLING DELAWARE HOLDING COMPANY
ALTUS CONSTRUCTION LLC
ED BELL CONSTRUCTION COMPANY
MARIO SINACOLA & SONS EXCAVATING, INC.
PREPARING ROW
STA 32.150 $22,525.000 $27,944.870 $37,000.000 $19,550.000 $44,477.530 $21,035.550 $30,000.000
REMOVING CONC (PAV)
SY 11,555.000 $15.000 $17.000 $10.000 $17.000 $19.960 $16.000 $15.000
REMOVING CONC (RIPRAP)
SY 637.000 $30.000 $13.000 $8.000 $38.700 $24.960 $25.000 $15.000
REMOVING CONC (DRIVEWAYS)
SY 2,049.000 $18.000 $11.000 $8.000 $10.500 $20.800 $25.000 $15.000
REMOVING CONC (CURB)
LF 4,968.000 $11.000 $4.000 $1.000 $0.610 $8.320 $6.000 $10.000
REMOVING STAB BASE AND ASPH PAV (6")
SY 1,391.000 $25.000 $13.000 $5.000 $12.000 $13.310 $22.000 $17.000
EXCAVATION (ROADWAY)
CY 21,594.000 $25.000 $9.000 $14.000 $18.000 $20.300 $10.000 $20.000
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
CY 55,492.000 $30.000 $19.000 $22.000 $33.000 $25.490 $30.000 $40.000
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
CY 3,242.000 $47.000 $19.000 $28.000 $41.000 $65.080 $75.000 $20.000
COMPOST MANUF TOPSOIL (4")
SY 28,919.000 $2.500 $1.500 $1.000 $2.800 $1.880 $1.010 $2.000
BLOCK SODDING
SY 11,875.000 $6.000 $5.000 $4.500 $4.500 $8.990 $4.840 $3.650
DRILL SEEDING (PERM) (URBAN) (CLAY)
SY 17,044.000 $0.500 $0.250 $0.350 $0.350 $0.700 $0.380 $0.150
DRILL SEED (TEMP)(WARM OR COOL)
SY 28,919.000 $0.500 $0.250 $0.340 $0.340 $0.680 $0.370 $0.180
VEGETATIVE WATERING
MG 8,604.300 $13.000 $17.900 $29.000 $12.000 $29.120 $5.590 $1.000
FL BS (CMP IN PLC)(TY D GR1-2)(12")
SY 7,462.000 $32.000 $27.000 $22.000 $30.500 $28.030 $40.670 $40.000
LIME (HYDRATED LIME (SLURRY))
TON 130.000 $340.000 $332.000 $335.000 $312.000 $342.840 $385.000 $370.000
LIME TRT (EXST MATL)(8")
SY 7,768.000 $8.500 $5.200 $6.000 $11.500 $4.990 $9.000 $23.000
CEMENT
TON 38.000 $300.000 $409.000 $364.000 $238.000 $355.040 $415.000 $370.000
CEMENT TREAT(EXIST MATL)(8")
SY 5,584.000 $8.000 $4.800 $3.860 $7.000 $4.160 $4.000 $17.000
PRIME COAT (MC-30)
GAL 2,673.000 $10.000 $6.000 $6.650 $4.750 $5.820 $5.360 $6.500
CONC PVMT (CONT REINF - CRCP) (10")
SY 5,292.000 $120.000 $85.000 $105.000 $123.000 $130.530 $125.000 $120.000
CEM STABIL BKFL
CY 514.000 $200.000 $250.000 $155.000 $251.000 $114.350 $350.000 $350.000
CUT & RESTORE CONC PAVING
SY 13.000 $450.000 $560.000 $500.000 $450.000 $256.080 $750.000 $1,000.000
TRENCH EXCAVATION PROTECTION
LF 183.000 $13.000 $44.000 $1.000 $1.000 $9.970 $175.390 $1.000
TEMPORARY SPL SHORING
SF 16,728.000 $45.000 $40.000 $10.000 $32.000 $32.640 $37.500 $35.000
DRILL SHAFT (18 IN)
LF 149.000 $100.000 $200.000 $275.000 $178.240 $218.590 $220.000 $376.000
DRILL SHAFT (36 IN)
LF 564.000 $270.000 $475.000 $550.000 $426.950 $482.780 $550.000 $575.000
CL C CONC (ABUT)(HPC)
CY 134.800 $1,300.000 $850.000 $1,300.000 $1,646.000 $1,501.940 $1,927.100 $2,600.000
CL C CONC (CAP)(HPC)
CY 77.700 $1,600.000 $1,780.000 $1,200.000 $1,910.000 $1,887.620 $2,082.250 $2,600.000
CL C CONC (COLUMN)(HPC)
CY 81.400 $1,500.000 $1,180.000 $1,500.000 $1,940.000 $941.210 $2,102.930 $2,600.000
CL C CONC (RAIL FOUNDATION)
CY 65.000 $1,000.000 $610.000 $600.000 $890.000 $733.100 $999.860 $750.000
REINF CONC SLAB (HPC)
SF 22,361.000 $25.000 $23.000 $28.000 $26.000 $24.520 $38.780 $45.000
BRIDGE SIDEWALK (HPC)
SF 4,026.000 $20.000 $14.000 $11.000 $15.700 $20.300 $24.130 $30.000
APPROACH SLAB (HPC)
CY 190.000 $775.000 $770.000 $600.000 $620.000 $597.970 $1,029.520 $850.000
RETAINING WALL (MSE)
SF 2,745.000 $80.000 $142.000 $115.000 $190.000 $156.930 $167.640 $200.000
PRESTR CONC GIRDER (TX54)
LF 2,794.920 $225.000 $250.000 $280.000 $340.000 $209.610 $333.330 $255.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 20.000 $140.000 $250.000 $259.000 $375.000 $168.300 $403.130 $375.000
RIPRAP (CONC)(4 IN)
CY 792.000 $600.000 $560.000 $400.000 $730.000 $449.180 $931.320 $600.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 19.000 $220.000 $270.000 $250.000 $151.000 $180.700 $362.010 $430.000
RIPRAP (MOW STRIP)(4 IN)
CY 36.600 $650.000 $1,010.000 $700.000 $670.000 $552.910 $1,069.110 $1,130.000
CLEANING AND SEALING EXISTING JOINTS
LF 17.000 $60.000 $33.000 $85.000 $40.000 $49.630 $43.000 $40.000
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 224.000 $45.000 $50.000 $55.000 $75.000 $46.010 $115.660 $75.000
CLEAN AND SEAL EXIST JTS (STRIP SEAL)
LF 240.000 $60.000 $50.000 $125.000 $110.000 $45.770 $150.950 $110.000
STR STEEL (MISC NON - BRIDGE)
LB 322.000 $19.000 $21.000 $45.000 $32.000 $18.310 $26.580 $25.000
RAIL (TY T221)(HPC)
LF 574.000 $120.000 $100.000 $155.000 $130.000 $114.260 $124.850 $95.000
RAIL (TY C221)(HPC)
LF 1,219.000 $150.000 $120.000 $167.000 $158.880 $190.750 $145.440 $150.000
RAIL (HANDRAIL)(TY E)
LF 61.000 $190.000 $150.000 $167.000 $150.190 $173.860 $218.720 $150.000
RAIL (CLF-RO)
LF 460.000 $100.000 $120.000 $300.000 $157.260 $91.180 $109.650 $185.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 163.000 $185.000 $240.000 $293.240 $160.000 $195.550 $287.640 $220.000
RC PIPE (CL III)(24 IN)
LF 620.000 $110.000 $110.000 $100.000 $138.000 $111.770 $143.050 $150.000
INLET (COMPL)(PCU)(3FT)(BOTH)
EA 4.000 $8,500.000 $7,500.000 $7,000.000 $10,750.000 $10,045.440 $20,887.330 $11,000.000
INLET (COMPL)(PSL)(RC)(4FTX4FT)
EA 1.000 $7,000.000 $5,500.000 $6,000.000 $8,560.000 $5,901.450 $12,595.730 $8,000.000
INLET(COMPL)(PAZD)(FG)(3FTX3FT-3FTX3FT)
EA 1.000 $7,500.000 $5,200.000 $6,000.000 $8,100.000 $5,152.530 $12,191.860 $8,000.000
REMOV STR (INLET)
EA 1.000 $1,400.000 $1,400.000 $850.000 $675.000 $1,447.690 $1,797.230 $2,300.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 2.000 $125,000.000 $120,000.000 $250,000.000 $95,000.000 $113,185.940 $137,894.000 $120,000.000
MOBILIZATION
LS 1.000 $1,157,374.380 $1,170,000.000 $1,150,000.000 $1,260,000.000 $1,422,766.790 $1,372,000.000 $1,580,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 16.000 $30,000.000 $18,500.000 $11,000.000 $9,200.000 $50,759.760 $42,000.000 $20,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 140.000 $34.000 $55.000 $50.000 $33.000 $65.900 $35.480 $35.000
ROCK FILTER DAMS (REMOVE)
LF 140.000 $10.000 $12.000 $14.140 $14.000 $27.960 $15.050 $5.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 986.000 $25.000 $28.000 $45.000 $32.500 $64.910 $34.940 $35.000
CONSTRUCTION EXITS (REMOVE)
SY 986.000 $9.200 $12.000 $13.130 $13.000 $25.960 $13.980 $5.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,105.000 $3.150 $5.000 $7.000 $3.100 $6.190 $3.330 $3.050
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,130.000 $1.000 $1.000 $1.010 $1.000 $2.000 $1.080 $0.100
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 99.000 $14.000 $12.000 $10.000 $6.500 $12.980 $6.990 $6.550
BIODEG EROSN CONT LOGS (REMOVE)
LF 99.000 $3.000 $1.000 $1.260 $1.250 $2.500 $1.340 $0.250
TEMP SDMT CONT FENCE (INLET PROTECTION)
LF 25.000 $10.500 $12.000 $12.000 $8.250 $16.480 $8.870 $10.000
CONSTRUCTING DETOURS
SY 1,247.000 $125.000 $190.000 $200.000 $119.000 $128.970 $145.400 $350.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 4,350.000 $90.000 $102.000 $65.000 $36.000 $90.720 $31.470 $95.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 35.000 $60.000 $50.000 $150.000 $36.000 $189.730 $280.260 $300.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 3,900.000 $18.000 $14.000 $5.000 $11.000 $9.150 $3.760 $10.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 4,350.000 $20.000 $8.000 $7.000 $13.000 $12.480 $12.690 $10.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 35.000 $23.000 $14.000 $35.000 $13.000 $15.810 $45.950 $65.000
CONC CURB (MONO) (TY II)
LF 2,740.000 $14.000 $10.000 $5.000 $7.300 $6.660 $6.370 $5.000
CONC CURB & GUTTER (TY II)
LF 3,118.000 $42.000 $17.000 $26.000 $29.000 $54.480 $59.990 $35.000
DRIVEWAYS (CONC) (HES)
SY 2,306.000 $120.000 $120.000 $100.000 $62.000 $138.890 $171.330 $120.000
CONC SIDEWALKS (4")
SY 1,522.000 $100.000 $65.000 $60.000 $69.000 $76.530 $103.330 $75.000
CURB RAMPS (TY 2)
EA 5.000 $3,500.000 $2,200.000 $1,500.000 $1,765.000 $2,413.170 $3,432.710 $2,500.000
CURB RAMPS (TY 10)
EA 10.000 $3,000.000 $2,300.000 $1,450.000 $1,460.000 $2,219.010 $3,252.830 $2,600.000
CONC MEDIAN
SY 26.000 $140.000 $240.000 $60.000 $131.000 $105.950 $482.150 $700.000
RIGHT OF WAY MARKERS
EA 24.000 $375.000 $380.000 $380.930 $369.000 $312.050 $525.000 $650.000
MTL W-BEAM GD FEN (TIM POST)
LF 300.000 $26.000 $25.000 $23.640 $27.000 $29.960 $26.820 $22.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $2,050.000 $2,000.000 $2,170.430 $2,377.910 $2,119.010 $3,019.360 $1,956.730
REMOVE METAL BEAM GUARD FENCE
LF 774.000 $3.500 $3.000 $2.840 $2.500 $2.910 $2.150 $2.500
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $280.000 $155.000 $283.900 $250.000 $194.720 $215.000 $125.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 2.000 $260.000 $300.000 $283.900 $250.000 $187.230 $215.000 $250.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,000.000 $3,000.000 $5,000.000 $3,150.000 $2,747.680 $3,063.750 $2,875.000
GUARDRAIL END TREATMENT (REMOVE)
EA 6.000 $300.000 $260.000 $283.890 $250.000 $248.050 $322.500 $250.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 3.000 $1,900.000 $1,500.000 $2,000.000 $878.350 $1,410.460 $1,414.630 $1,700.000
CRASH CUSH ATTEN (REMOVE)
EA 7.000 $1,300.000 $1,000.000 $885.000 $597.560 $832.130 $707.320 $1,000.000
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
EA 1.000 $47,000.000 $75,000.000 $65,000.000 $55,500.000 $52,684.870 $85,000.000 $75,000.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 6.000 $10,000.000 $9,500.000 $9,000.000 $8,257.900 $13,360.630 $10,500.000 $8,800.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 9.000 $750.000 $700.000 $655.000 $655.000 $631.040 $720.250 $643.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 8.000 $940.000 $820.000 $799.000 $799.000 $748.910 $849.250 $696.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 1.000 $750.000 $690.000 $635.000 $635.000 $532.560 $736.380 $550.000
RELOCATE SM RD SN SUP&AM(SIGN ONLY)
EA 4.000 $280.000 $200.000 $195.000 $195.000 $411.900 $161.250 $250.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 3.000 $34.000 $23.000 $20.000 $21.000 $23.300 $22.580 $20.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 1.000 $25.000 $23.000 $25.000 $22.000 $24.410 $22.580 $20.000
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
EA 6.000 $25.000 $23.000 $25.000 $22.000 $24.410 $22.580 $20.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 2.000 $100.000 $50.000 $65.000 $75.390 $80.440 $67.730 $45.000
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 367.000 $2.000 $1.000 $2.250 $1.250 $0.920 $0.890 $1.250
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 8,186.000 $1.500 $1.000 $1.350 $1.250 $0.890 $0.860 $1.250
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 1,526.000 $2.000 $2.000 $3.600 $1.700 $1.810 $1.750 $1.700
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 16.000 $10.000 $6.000 $12.000 $10.000 $5.550 $5.380 $10.000
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 7,440.000 $1.800 $1.000 $1.350 $1.250 $0.890 $0.860 $1.250
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,603.000 $1.800 $1.800 $1.100 $1.750 $1.440 $1.610 $1.750
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 693.000 $10.000 $6.000 $8.400 $7.000 $5.550 $5.380 $7.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 4.000 $165.000 $200.000 $250.000 $200.000 $194.160 $188.130 $200.000
PAVEMENT SEALER 6"
LF 10,257.000 $0.500 $0.700 $0.250 $0.250 $0.410 $0.610 $0.250
PAVEMENT SEALER 8"
LF 1,603.000 $0.800 $0.800 $0.350 $0.340 $0.750 $0.730 $0.340
PAVEMENT SEALER 24"
LF 693.000 $4.500 $2.200 $3.000 $1.000 $2.050 $1.990 $1.000
PAVEMENT SEALER (ARROW)
EA 4.000 $65.000 $110.000 $50.000 $20.000 $107.620 $104.280 $20.000
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 1,784.000 $2.000 $1.300 $1.000 $1.000 $1.160 $1.130 $1.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 3,727.000 $1.800 $1.300 $1.000 $0.850 $1.130 $1.100 $0.850
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 4,587.000 $1.800 $1.300 $1.000 $0.850 $1.130 $1.100 $0.850
REFL PAV MRK TY II (R&W)6"(FIRE LANE)
LF 159.000 $28.000 $2.600 $2.000 $2.500 $2.500 $2.420 $2.500
REFL PAV MRKR TY II-C-R
EA 138.000 $8.000 $5.000 $8.550 $5.000 $4.720 $4.570 $5.000
ELIM EXT PAV MRK & MRKS (4")
LF 2,471.000 $1.000 $0.450 $1.000 $0.600 $0.410 $0.400 $0.600
ELIM EXT PAV MRK & MRKS (8")
LF 965.000 $1.500 $0.450 $2.000 $1.000 $0.440 $0.430 $1.000
ELIM EXT PAV MRK & MRKS (24")
LF 415.000 $4.150 $0.700 $5.000 $3.500 $0.670 $0.650 $3.500
PAV SURF PREP FOR MRK (6")
LF 10,257.000 $0.600 $0.400 $0.200 $0.050 $0.370 $0.350 $0.050
PAV SURF PREP FOR MRK (8")
LF 1,603.000 $0.750 $0.500 $0.400 $0.100 $0.430 $0.420 $0.100
PAV SURF PREP FOR MRK (24")
LF 693.000 $2.000 $0.700 $2.000 $0.300 $0.610 $0.590 $0.300
PAV SURF PREP FOR MRK (ARROW)
EA 4.000 $35.000 $40.000 $50.000 $10.000 $38.830 $37.630 $10.000
FULL - WIDTH MOWING
CYC 3.000 $4,500.000 $3,500.000 $2,500.000 $2,669.810 $3,328.510 $6,323.310 $1,000.000
LITTER REMOVAL
CYC 3.000 $2,500.000 $2,500.000 $2,000.000 $1,876.060 $1,664.250 $4,636.480 $2,000.000
TREE TRIMMING / BRUSH REMOVAL(CHANNELS)
AC 0.660 $11,500.000 $8,500.000 $10,000.000 $4,978.860 $42,230.460 $4,225.820 $50,000.000
TREE AND BRUSH REMOVAL
AC 1.250 $20,000.000 $5,400.000 $10,000.000 $4,978.860 $7,905.210 $4,225.820 $50,000.000
CNC CRACK REPAIR (DISCRETE)(INJECT)
LF 31.000 $63.000 $130.000 $135.130 $140.000 $104.020 $150.500 $140.000
SP MIXES SP-B PG64-22
TON 2,710.000 $150.000 $135.000 $150.000 $120.000 $133.640 $130.080 $136.000
SP MIXES SP-C SAC-B PG64-22
TON 1,060.000 $190.000 $145.000 $185.000 $130.000 $132.220 $140.920 $138.000
TACK COAT
GAL 387.000 $4.500 $1.200 $3.070 $1.000 $3.710 $1.130 $3.000
WROUGHT IRON FENCE
LF 48.000 $145.000 $125.000 $72.120 $73.010 $4.160 $86.000 $86.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $15,000.000 $22,800.000 $20,042.940 $11,630.000 $45,489.620 $14,727.940 $11,000.000
TMA (STATIONARY)
DAY 74.000 $230.000 $240.000 $243.440 $126.000 $1,109.500 $215.520 $400.000
TMA (MOBILE OPERATION)
DAY 16.000 $650.000 $550.000 $945.000 $4,115.000 $1,109.500 $1,021.250 $1,300.000
Totals: $13,211,118.180 $11,749,150.190 $12,031,862.520 $12,791,434.763 $14,371,512.449 $14,737,620.042 $15,674,618.600