PREPARING ROW
|
STA
|
32.150
|
$22,525.000
|
$27,944.870
|
$37,000.000
|
$19,550.000
|
$44,477.530
|
$21,035.550
|
$30,000.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
11,555.000
|
$15.000
|
$17.000
|
$10.000
|
$17.000
|
$19.960
|
$16.000
|
$15.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
637.000
|
$30.000
|
$13.000
|
$8.000
|
$38.700
|
$24.960
|
$25.000
|
$15.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
2,049.000
|
$18.000
|
$11.000
|
$8.000
|
$10.500
|
$20.800
|
$25.000
|
$15.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
4,968.000
|
$11.000
|
$4.000
|
$1.000
|
$0.610
|
$8.320
|
$6.000
|
$10.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (6")
|
SY
|
1,391.000
|
$25.000
|
$13.000
|
$5.000
|
$12.000
|
$13.310
|
$22.000
|
$17.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
21,594.000
|
$25.000
|
$9.000
|
$14.000
|
$18.000
|
$20.300
|
$10.000
|
$20.000
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
|
CY
|
55,492.000
|
$30.000
|
$19.000
|
$22.000
|
$33.000
|
$25.490
|
$30.000
|
$40.000
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
|
CY
|
3,242.000
|
$47.000
|
$19.000
|
$28.000
|
$41.000
|
$65.080
|
$75.000
|
$20.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
28,919.000
|
$2.500
|
$1.500
|
$1.000
|
$2.800
|
$1.880
|
$1.010
|
$2.000
|
|
|
BLOCK SODDING
|
SY
|
11,875.000
|
$6.000
|
$5.000
|
$4.500
|
$4.500
|
$8.990
|
$4.840
|
$3.650
|
|
|
DRILL SEEDING (PERM) (URBAN) (CLAY)
|
SY
|
17,044.000
|
$0.500
|
$0.250
|
$0.350
|
$0.350
|
$0.700
|
$0.380
|
$0.150
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
28,919.000
|
$0.500
|
$0.250
|
$0.340
|
$0.340
|
$0.680
|
$0.370
|
$0.180
|
|
|
VEGETATIVE WATERING
|
MG
|
8,604.300
|
$13.000
|
$17.900
|
$29.000
|
$12.000
|
$29.120
|
$5.590
|
$1.000
|
|
|
FL BS (CMP IN PLC)(TY D GR1-2)(12")
|
SY
|
7,462.000
|
$32.000
|
$27.000
|
$22.000
|
$30.500
|
$28.030
|
$40.670
|
$40.000
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
130.000
|
$340.000
|
$332.000
|
$335.000
|
$312.000
|
$342.840
|
$385.000
|
$370.000
|
|
|
LIME TRT (EXST MATL)(8")
|
SY
|
7,768.000
|
$8.500
|
$5.200
|
$6.000
|
$11.500
|
$4.990
|
$9.000
|
$23.000
|
|
|
CEMENT
|
TON
|
38.000
|
$300.000
|
$409.000
|
$364.000
|
$238.000
|
$355.040
|
$415.000
|
$370.000
|
|
|
CEMENT TREAT(EXIST MATL)(8")
|
SY
|
5,584.000
|
$8.000
|
$4.800
|
$3.860
|
$7.000
|
$4.160
|
$4.000
|
$17.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
2,673.000
|
$10.000
|
$6.000
|
$6.650
|
$4.750
|
$5.820
|
$5.360
|
$6.500
|
|
|
CONC PVMT (CONT REINF - CRCP) (10")
|
SY
|
5,292.000
|
$120.000
|
$85.000
|
$105.000
|
$123.000
|
$130.530
|
$125.000
|
$120.000
|
|
|
CEM STABIL BKFL
|
CY
|
514.000
|
$200.000
|
$250.000
|
$155.000
|
$251.000
|
$114.350
|
$350.000
|
$350.000
|
|
|
CUT & RESTORE CONC PAVING
|
SY
|
13.000
|
$450.000
|
$560.000
|
$500.000
|
$450.000
|
$256.080
|
$750.000
|
$1,000.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
183.000
|
$13.000
|
$44.000
|
$1.000
|
$1.000
|
$9.970
|
$175.390
|
$1.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
16,728.000
|
$45.000
|
$40.000
|
$10.000
|
$32.000
|
$32.640
|
$37.500
|
$35.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
149.000
|
$100.000
|
$200.000
|
$275.000
|
$178.240
|
$218.590
|
$220.000
|
$376.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
564.000
|
$270.000
|
$475.000
|
$550.000
|
$426.950
|
$482.780
|
$550.000
|
$575.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
134.800
|
$1,300.000
|
$850.000
|
$1,300.000
|
$1,646.000
|
$1,501.940
|
$1,927.100
|
$2,600.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
77.700
|
$1,600.000
|
$1,780.000
|
$1,200.000
|
$1,910.000
|
$1,887.620
|
$2,082.250
|
$2,600.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
81.400
|
$1,500.000
|
$1,180.000
|
$1,500.000
|
$1,940.000
|
$941.210
|
$2,102.930
|
$2,600.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
65.000
|
$1,000.000
|
$610.000
|
$600.000
|
$890.000
|
$733.100
|
$999.860
|
$750.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
22,361.000
|
$25.000
|
$23.000
|
$28.000
|
$26.000
|
$24.520
|
$38.780
|
$45.000
|
|
|
BRIDGE SIDEWALK (HPC)
|
SF
|
4,026.000
|
$20.000
|
$14.000
|
$11.000
|
$15.700
|
$20.300
|
$24.130
|
$30.000
|
|
|
APPROACH SLAB (HPC)
|
CY
|
190.000
|
$775.000
|
$770.000
|
$600.000
|
$620.000
|
$597.970
|
$1,029.520
|
$850.000
|
|
|
RETAINING WALL (MSE)
|
SF
|
2,745.000
|
$80.000
|
$142.000
|
$115.000
|
$190.000
|
$156.930
|
$167.640
|
$200.000
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
2,794.920
|
$225.000
|
$250.000
|
$280.000
|
$340.000
|
$209.610
|
$333.330
|
$255.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
20.000
|
$140.000
|
$250.000
|
$259.000
|
$375.000
|
$168.300
|
$403.130
|
$375.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
792.000
|
$600.000
|
$560.000
|
$400.000
|
$730.000
|
$449.180
|
$931.320
|
$600.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
19.000
|
$220.000
|
$270.000
|
$250.000
|
$151.000
|
$180.700
|
$362.010
|
$430.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
36.600
|
$650.000
|
$1,010.000
|
$700.000
|
$670.000
|
$552.910
|
$1,069.110
|
$1,130.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
17.000
|
$60.000
|
$33.000
|
$85.000
|
$40.000
|
$49.630
|
$43.000
|
$40.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL7)
|
LF
|
224.000
|
$45.000
|
$50.000
|
$55.000
|
$75.000
|
$46.010
|
$115.660
|
$75.000
|
|
|
CLEAN AND SEAL EXIST JTS (STRIP SEAL)
|
LF
|
240.000
|
$60.000
|
$50.000
|
$125.000
|
$110.000
|
$45.770
|
$150.950
|
$110.000
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
322.000
|
$19.000
|
$21.000
|
$45.000
|
$32.000
|
$18.310
|
$26.580
|
$25.000
|
|
|
RAIL (TY T221)(HPC)
|
LF
|
574.000
|
$120.000
|
$100.000
|
$155.000
|
$130.000
|
$114.260
|
$124.850
|
$95.000
|
|
|
RAIL (TY C221)(HPC)
|
LF
|
1,219.000
|
$150.000
|
$120.000
|
$167.000
|
$158.880
|
$190.750
|
$145.440
|
$150.000
|
|
|
RAIL (HANDRAIL)(TY E)
|
LF
|
61.000
|
$190.000
|
$150.000
|
$167.000
|
$150.190
|
$173.860
|
$218.720
|
$150.000
|
|
|
RAIL (CLF-RO)
|
LF
|
460.000
|
$100.000
|
$120.000
|
$300.000
|
$157.260
|
$91.180
|
$109.650
|
$185.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
163.000
|
$185.000
|
$240.000
|
$293.240
|
$160.000
|
$195.550
|
$287.640
|
$220.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
620.000
|
$110.000
|
$110.000
|
$100.000
|
$138.000
|
$111.770
|
$143.050
|
$150.000
|
|
|
INLET (COMPL)(PCU)(3FT)(BOTH)
|
EA
|
4.000
|
$8,500.000
|
$7,500.000
|
$7,000.000
|
$10,750.000
|
$10,045.440
|
$20,887.330
|
$11,000.000
|
|
|
INLET (COMPL)(PSL)(RC)(4FTX4FT)
|
EA
|
1.000
|
$7,000.000
|
$5,500.000
|
$6,000.000
|
$8,560.000
|
$5,901.450
|
$12,595.730
|
$8,000.000
|
|
|
INLET(COMPL)(PAZD)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
1.000
|
$7,500.000
|
$5,200.000
|
$6,000.000
|
$8,100.000
|
$5,152.530
|
$12,191.860
|
$8,000.000
|
|
|
REMOV STR (INLET)
|
EA
|
1.000
|
$1,400.000
|
$1,400.000
|
$850.000
|
$675.000
|
$1,447.690
|
$1,797.230
|
$2,300.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
2.000
|
$125,000.000
|
$120,000.000
|
$250,000.000
|
$95,000.000
|
$113,185.940
|
$137,894.000
|
$120,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,157,374.380
|
$1,170,000.000
|
$1,150,000.000
|
$1,260,000.000
|
$1,422,766.790
|
$1,372,000.000
|
$1,580,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
16.000
|
$30,000.000
|
$18,500.000
|
$11,000.000
|
$9,200.000
|
$50,759.760
|
$42,000.000
|
$20,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
140.000
|
$34.000
|
$55.000
|
$50.000
|
$33.000
|
$65.900
|
$35.480
|
$35.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
140.000
|
$10.000
|
$12.000
|
$14.140
|
$14.000
|
$27.960
|
$15.050
|
$5.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
986.000
|
$25.000
|
$28.000
|
$45.000
|
$32.500
|
$64.910
|
$34.940
|
$35.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
986.000
|
$9.200
|
$12.000
|
$13.130
|
$13.000
|
$25.960
|
$13.980
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,105.000
|
$3.150
|
$5.000
|
$7.000
|
$3.100
|
$6.190
|
$3.330
|
$3.050
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,130.000
|
$1.000
|
$1.000
|
$1.010
|
$1.000
|
$2.000
|
$1.080
|
$0.100
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
99.000
|
$14.000
|
$12.000
|
$10.000
|
$6.500
|
$12.980
|
$6.990
|
$6.550
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
99.000
|
$3.000
|
$1.000
|
$1.260
|
$1.250
|
$2.500
|
$1.340
|
$0.250
|
|
|
TEMP SDMT CONT FENCE (INLET PROTECTION)
|
LF
|
25.000
|
$10.500
|
$12.000
|
$12.000
|
$8.250
|
$16.480
|
$8.870
|
$10.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
1,247.000
|
$125.000
|
$190.000
|
$200.000
|
$119.000
|
$128.970
|
$145.400
|
$350.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
4,350.000
|
$90.000
|
$102.000
|
$65.000
|
$36.000
|
$90.720
|
$31.470
|
$95.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
35.000
|
$60.000
|
$50.000
|
$150.000
|
$36.000
|
$189.730
|
$280.260
|
$300.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
3,900.000
|
$18.000
|
$14.000
|
$5.000
|
$11.000
|
$9.150
|
$3.760
|
$10.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
4,350.000
|
$20.000
|
$8.000
|
$7.000
|
$13.000
|
$12.480
|
$12.690
|
$10.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
35.000
|
$23.000
|
$14.000
|
$35.000
|
$13.000
|
$15.810
|
$45.950
|
$65.000
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
2,740.000
|
$14.000
|
$10.000
|
$5.000
|
$7.300
|
$6.660
|
$6.370
|
$5.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
3,118.000
|
$42.000
|
$17.000
|
$26.000
|
$29.000
|
$54.480
|
$59.990
|
$35.000
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
2,306.000
|
$120.000
|
$120.000
|
$100.000
|
$62.000
|
$138.890
|
$171.330
|
$120.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
1,522.000
|
$100.000
|
$65.000
|
$60.000
|
$69.000
|
$76.530
|
$103.330
|
$75.000
|
|
|
CURB RAMPS (TY 2)
|
EA
|
5.000
|
$3,500.000
|
$2,200.000
|
$1,500.000
|
$1,765.000
|
$2,413.170
|
$3,432.710
|
$2,500.000
|
|
|
CURB RAMPS (TY 10)
|
EA
|
10.000
|
$3,000.000
|
$2,300.000
|
$1,450.000
|
$1,460.000
|
$2,219.010
|
$3,252.830
|
$2,600.000
|
|
|
CONC MEDIAN
|
SY
|
26.000
|
$140.000
|
$240.000
|
$60.000
|
$131.000
|
$105.950
|
$482.150
|
$700.000
|
|
|
RIGHT OF WAY MARKERS
|
EA
|
24.000
|
$375.000
|
$380.000
|
$380.930
|
$369.000
|
$312.050
|
$525.000
|
$650.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
300.000
|
$26.000
|
$25.000
|
$23.640
|
$27.000
|
$29.960
|
$26.820
|
$22.500
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$2,050.000
|
$2,000.000
|
$2,170.430
|
$2,377.910
|
$2,119.010
|
$3,019.360
|
$1,956.730
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
774.000
|
$3.500
|
$3.000
|
$2.840
|
$2.500
|
$2.910
|
$2.150
|
$2.500
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$280.000
|
$155.000
|
$283.900
|
$250.000
|
$194.720
|
$215.000
|
$125.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
2.000
|
$260.000
|
$300.000
|
$283.900
|
$250.000
|
$187.230
|
$215.000
|
$250.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$3,000.000
|
$3,000.000
|
$5,000.000
|
$3,150.000
|
$2,747.680
|
$3,063.750
|
$2,875.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
6.000
|
$300.000
|
$260.000
|
$283.890
|
$250.000
|
$248.050
|
$322.500
|
$250.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
3.000
|
$1,900.000
|
$1,500.000
|
$2,000.000
|
$878.350
|
$1,410.460
|
$1,414.630
|
$1,700.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
7.000
|
$1,300.000
|
$1,000.000
|
$885.000
|
$597.560
|
$832.130
|
$707.320
|
$1,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
|
EA
|
1.000
|
$47,000.000
|
$75,000.000
|
$65,000.000
|
$55,500.000
|
$52,684.870
|
$85,000.000
|
$75,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
6.000
|
$10,000.000
|
$9,500.000
|
$9,000.000
|
$8,257.900
|
$13,360.630
|
$10,500.000
|
$8,800.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
9.000
|
$750.000
|
$700.000
|
$655.000
|
$655.000
|
$631.040
|
$720.250
|
$643.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
8.000
|
$940.000
|
$820.000
|
$799.000
|
$799.000
|
$748.910
|
$849.250
|
$696.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
1.000
|
$750.000
|
$690.000
|
$635.000
|
$635.000
|
$532.560
|
$736.380
|
$550.000
|
|
|
RELOCATE SM RD SN SUP&AM(SIGN ONLY)
|
EA
|
4.000
|
$280.000
|
$200.000
|
$195.000
|
$195.000
|
$411.900
|
$161.250
|
$250.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
3.000
|
$34.000
|
$23.000
|
$20.000
|
$21.000
|
$23.300
|
$22.580
|
$20.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
|
EA
|
1.000
|
$25.000
|
$23.000
|
$25.000
|
$22.000
|
$24.410
|
$22.580
|
$20.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
|
EA
|
6.000
|
$25.000
|
$23.000
|
$25.000
|
$22.000
|
$24.410
|
$22.580
|
$20.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
2.000
|
$100.000
|
$50.000
|
$65.000
|
$75.390
|
$80.440
|
$67.730
|
$45.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(BRK)
|
LF
|
367.000
|
$2.000
|
$1.000
|
$2.250
|
$1.250
|
$0.920
|
$0.890
|
$1.250
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
8,186.000
|
$1.500
|
$1.000
|
$1.350
|
$1.250
|
$0.890
|
$0.860
|
$1.250
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
1,526.000
|
$2.000
|
$2.000
|
$3.600
|
$1.700
|
$1.810
|
$1.750
|
$1.700
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
16.000
|
$10.000
|
$6.000
|
$12.000
|
$10.000
|
$5.550
|
$5.380
|
$10.000
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
7,440.000
|
$1.800
|
$1.000
|
$1.350
|
$1.250
|
$0.890
|
$0.860
|
$1.250
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,603.000
|
$1.800
|
$1.800
|
$1.100
|
$1.750
|
$1.440
|
$1.610
|
$1.750
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
693.000
|
$10.000
|
$6.000
|
$8.400
|
$7.000
|
$5.550
|
$5.380
|
$7.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
4.000
|
$165.000
|
$200.000
|
$250.000
|
$200.000
|
$194.160
|
$188.130
|
$200.000
|
|
|
PAVEMENT SEALER 6"
|
LF
|
10,257.000
|
$0.500
|
$0.700
|
$0.250
|
$0.250
|
$0.410
|
$0.610
|
$0.250
|
|
|
PAVEMENT SEALER 8"
|
LF
|
1,603.000
|
$0.800
|
$0.800
|
$0.350
|
$0.340
|
$0.750
|
$0.730
|
$0.340
|
|
|
PAVEMENT SEALER 24"
|
LF
|
693.000
|
$4.500
|
$2.200
|
$3.000
|
$1.000
|
$2.050
|
$1.990
|
$1.000
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
4.000
|
$65.000
|
$110.000
|
$50.000
|
$20.000
|
$107.620
|
$104.280
|
$20.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
1,784.000
|
$2.000
|
$1.300
|
$1.000
|
$1.000
|
$1.160
|
$1.130
|
$1.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
3,727.000
|
$1.800
|
$1.300
|
$1.000
|
$0.850
|
$1.130
|
$1.100
|
$0.850
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
4,587.000
|
$1.800
|
$1.300
|
$1.000
|
$0.850
|
$1.130
|
$1.100
|
$0.850
|
|
REFL PAV MRK TY II (R&W)6"(FIRE LANE)
|
LF
|
159.000
|
$28.000
|
$2.600
|
$2.000
|
$2.500
|
$2.500
|
$2.420
|
$2.500
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
138.000
|
$8.000
|
$5.000
|
$8.550
|
$5.000
|
$4.720
|
$4.570
|
$5.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
2,471.000
|
$1.000
|
$0.450
|
$1.000
|
$0.600
|
$0.410
|
$0.400
|
$0.600
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
965.000
|
$1.500
|
$0.450
|
$2.000
|
$1.000
|
$0.440
|
$0.430
|
$1.000
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
415.000
|
$4.150
|
$0.700
|
$5.000
|
$3.500
|
$0.670
|
$0.650
|
$3.500
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
10,257.000
|
$0.600
|
$0.400
|
$0.200
|
$0.050
|
$0.370
|
$0.350
|
$0.050
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
1,603.000
|
$0.750
|
$0.500
|
$0.400
|
$0.100
|
$0.430
|
$0.420
|
$0.100
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
693.000
|
$2.000
|
$0.700
|
$2.000
|
$0.300
|
$0.610
|
$0.590
|
$0.300
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
4.000
|
$35.000
|
$40.000
|
$50.000
|
$10.000
|
$38.830
|
$37.630
|
$10.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
3.000
|
$4,500.000
|
$3,500.000
|
$2,500.000
|
$2,669.810
|
$3,328.510
|
$6,323.310
|
$1,000.000
|
|
|
LITTER REMOVAL
|
CYC
|
3.000
|
$2,500.000
|
$2,500.000
|
$2,000.000
|
$1,876.060
|
$1,664.250
|
$4,636.480
|
$2,000.000
|
|
|
TREE TRIMMING / BRUSH REMOVAL(CHANNELS)
|
AC
|
0.660
|
$11,500.000
|
$8,500.000
|
$10,000.000
|
$4,978.860
|
$42,230.460
|
$4,225.820
|
$50,000.000
|
|
|
TREE AND BRUSH REMOVAL
|
AC
|
1.250
|
$20,000.000
|
$5,400.000
|
$10,000.000
|
$4,978.860
|
$7,905.210
|
$4,225.820
|
$50,000.000
|
|
|
CNC CRACK REPAIR (DISCRETE)(INJECT)
|
LF
|
31.000
|
$63.000
|
$130.000
|
$135.130
|
$140.000
|
$104.020
|
$150.500
|
$140.000
|
|
|
SP MIXES SP-B PG64-22
|
TON
|
2,710.000
|
$150.000
|
$135.000
|
$150.000
|
$120.000
|
$133.640
|
$130.080
|
$136.000
|
|
|
SP MIXES SP-C SAC-B PG64-22
|
TON
|
1,060.000
|
$190.000
|
$145.000
|
$185.000
|
$130.000
|
$132.220
|
$140.920
|
$138.000
|
|
|
TACK COAT
|
GAL
|
387.000
|
$4.500
|
$1.200
|
$3.070
|
$1.000
|
$3.710
|
$1.130
|
$3.000
|
|
|
WROUGHT IRON FENCE
|
LF
|
48.000
|
$145.000
|
$125.000
|
$72.120
|
$73.010
|
$4.160
|
$86.000
|
$86.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$15,000.000
|
$22,800.000
|
$20,042.940
|
$11,630.000
|
$45,489.620
|
$14,727.940
|
$11,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
74.000
|
$230.000
|
$240.000
|
$243.440
|
$126.000
|
$1,109.500
|
$215.520
|
$400.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
16.000
|
$650.000
|
$550.000
|
$945.000
|
$4,115.000
|
$1,109.500
|
$1,021.250
|
$1,300.000
|
|
Totals: |
$13,211,118.180
|
$11,749,150.190
|
$12,031,862.520
|
$12,791,434.763
|
$14,371,512.449
|
$14,737,620.042
|
$15,674,618.600
|