County: DENTON Highway: IH 35E Date: 08/02/2024 (3 months ago) Engineer's Estimate: $13,211,118 Control Number: 0195-03-088
Project: BR 2B24(289) District: DALLAS Time: 377 WORKING DAYS Type: BRIDGE REPLACEMENT
Bidder's List
Informational:

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $13,211,118.18
INDUS ROAD & BRIDGE, INC.   $11,749,150.19 1
-11.07% | -$1,461,967.99
GRANITE CONSTRUCTION COMPANY   $12,031,862.52 2
-8.93% | -$1,179,255.66
2.41% | $282,712.33
STERLING DELAWARE HOLDING COMPANY   $12,791,434.75 3
-3.18% | -$419,683.43
8.87% | $1,042,284.56
6.31% | $759,572.23
ALTUS CONSTRUCTION LLC   $14,371,512.41 4
8.78% | $1,160,394.23
22.32% | $2,622,362.22
12.35% | $1,580,077.66
ED BELL CONSTRUCTION COMPANY   $14,737,620.01 5
11.55% | $1,526,501.83
25.44% | $2,988,469.82
2.55% | $366,107.60
MARIO SINACOLA & SONS EXCAVATING, INC.   $15,674,618.60 6
18.65% | $2,463,500.42
33.41% | $3,925,468.41
6.36% | $936,998.59

Bid Items

Items: 135, 0 filtered
DENTON IH 35E  |  DALLAS  |  0195-03-088  |  08/02/2024  |  $13,211,118  |  BR 2B24(289)  |  BRIDGE REPL  |  377 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate INDUS ROAD & BRIDGE, INC. GRANITE CONSTRUCTION COMPANY STERLING DELAWARE HOLDING COMPANY ALTUS CONSTRUCTION LLC ED BELL CONSTRUCTION COMPANY MARIO SINACOLA & SONS EXCAVATING, INC.
100 6002 PREPARING ROW STA 32.150 $22,525.000 $27,944.870 $37,000.000 $0.000 $44,477.530 $21,035.550 $30,000.000
104 6001 REMOVING CONC (PAV) SY 11,555.000 $15.000 $17.000 $10.000 $0.000 $19.960 $16.000 $15.000
104 6009 REMOVING CONC (RIPRAP) SY 637.000 $30.000 $13.000 $8.000 $0.000 $24.960 $25.000 $15.000
104 6017 REMOVING CONC (DRIVEWAYS) SY 2,049.000 $18.000 $11.000 $8.000 $0.000 $20.800 $25.000 $15.000
104 6021 REMOVING CONC (CURB) LF 4,968.000 $11.000 $4.000 $1.000 $0.000 $8.320 $6.000 $10.000
105 6008 REMOVING STAB BASE AND ASPH PAV (6") SY 1,391.000 $25.000 $13.000 $5.000 $0.000 $13.310 $22.000 $17.000
110 6001 EXCAVATION (ROADWAY) CY 21,594.000 $25.000 $9.000 $14.000 $0.000 $20.300 $10.000 $20.000
132 6025 EMBANKMENT (FINAL) (DENS CONT) (TY C1) CY 55,492.000 $30.000 $19.000 $22.000 $0.000 $25.490 $30.000 $40.000
132 6026 EMBANKMENT (FINAL) (DENS CONT) (TY C2) CY 3,242.000 $47.000 $19.000 $28.000 $0.000 $65.080 $75.000 $20.000
161 6017 COMPOST MANUF TOPSOIL (4") SY 28,919.000 $2.500 $1.500 $1.000 $0.000 $1.880 $1.010 $2.000
162 6002 BLOCK SODDING SY 11,875.000 $6.000 $5.000 $4.500 $0.000 $8.990 $4.840 $3.650
164 6039 DRILL SEEDING (PERM) (URBAN) (CLAY) SY 17,044.000 $0.500 $0.250 $0.350 $0.000 $0.700 $0.380 $0.150
164 6051 DRILL SEED (TEMP)(WARM OR COOL) SY 28,919.000 $0.500 $0.250 $0.340 $0.000 $0.680 $0.370 $0.180
168 6001 VEGETATIVE WATERING MG 8,604.300 $13.000 $17.900 $29.000 $0.000 $29.120 $5.590 $1.000
247 6313 FL BS (CMP IN PLC)(TY D GR1-2)(12") SY 7,462.000 $32.000 $27.000 $22.000 $0.000 $28.030 $40.670 $40.000
260 6002 LIME (HYDRATED LIME (SLURRY)) TON 130.000 $340.000 $332.000 $335.000 $0.000 $342.840 $385.000 $370.000
260 6027 LIME TRT (EXST MATL)(8") SY 7,768.000 $8.500 $5.200 $6.000 $0.000 $4.990 $9.000 $23.000
275 6001 CEMENT TON 38.000 $300.000 $409.000 $364.000 $0.000 $355.040 $415.000 $370.000
275 6011 CEMENT TREAT(EXIST MATL)(8") SY 5,584.000 $8.000 $4.800 $3.860 $0.000 $4.160 $4.000 $17.000
310 6009 PRIME COAT (MC-30) GAL 2,673.000 $10.000 $6.000 $6.650 $0.000 $5.820 $5.360 $6.500
360 6004 CONC PVMT (CONT REINF - CRCP) (10") SY 5,292.000 $120.000 $85.000 $105.000 $0.000 $130.530 $125.000 $120.000
400 6005 CEM STABIL BKFL CY 514.000 $200.000 $250.000 $155.000 $0.000 $114.350 $350.000 $350.000
400 6007 CUT & RESTORE CONC PAVING SY 13.000 $450.000 $560.000 $500.000 $0.000 $256.080 $750.000 $1,000.000
402 6001 TRENCH EXCAVATION PROTECTION LF 183.000 $13.000 $44.000 $1.000 $0.000 $9.970 $175.390 $1.000
403 6001 TEMPORARY SPL SHORING SF 16,728.000 $45.000 $40.000 $10.000 $0.000 $32.640 $37.500 $35.000
416 6001 DRILL SHAFT (18 IN) LF 149.000 $100.000 $200.000 $275.000 $0.000 $218.590 $220.000 $376.000
416 6004 DRILL SHAFT (36 IN) LF 564.000 $270.000 $475.000 $550.000 $0.000 $482.780 $550.000 $575.000
420 6014 CL C CONC (ABUT)(HPC) CY 134.800 $1,300.000 $850.000 $1,300.000 $0.000 $1,501.940 $1,927.100 $2,600.000
420 6030 CL C CONC (CAP)(HPC) CY 77.700 $1,600.000 $1,780.000 $1,200.000 $0.000 $1,887.620 $2,082.250 $2,600.000
420 6038 CL C CONC (COLUMN)(HPC) CY 81.400 $1,500.000 $1,180.000 $1,500.000 $0.000 $941.210 $2,102.930 $2,600.000
420 6066 CL C CONC (RAIL FOUNDATION) CY 65.000 $1,000.000 $610.000 $600.000 $0.000 $733.100 $999.860 $750.000
422 6002 REINF CONC SLAB (HPC) SF 22,361.000 $25.000 $23.000 $28.000 $0.000 $24.520 $38.780 $45.000
422 6014 BRIDGE SIDEWALK (HPC) SF 4,026.000 $20.000 $14.000 $11.000 $0.000 $20.300 $24.130 $30.000
422 6016 APPROACH SLAB (HPC) CY 190.000 $775.000 $770.000 $600.000 $0.000 $597.970 $1,029.520 $850.000
423 6001 RETAINING WALL (MSE) SF 2,745.000 $80.000 $142.000 $115.000 $0.000 $156.930 $167.640 $200.000
425 6039 PRESTR CONC GIRDER (TX54) LF 2,794.920 $225.000 $250.000 $280.000 $0.000 $209.610 $333.330 $255.000
429 6007 CONC STR REPAIR (VERTICAL & OVERHEAD) SF 20.000 $140.000 $250.000 $259.000 $0.000 $168.300 $403.130 $375.000
432 6001 RIPRAP (CONC)(4 IN) CY 792.000 $600.000 $560.000 $400.000 $0.000 $449.180 $931.320 $600.000
432 6031 RIPRAP (STONE PROTECTION)(12 IN) CY 19.000 $220.000 $270.000 $250.000 $0.000 $180.700 $362.010 $430.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 36.600 $650.000 $1,010.000 $700.000 $0.000 $552.910 $1,069.110 $1,130.000
438 6001 CLEANING AND SEALING EXISTING JOINTS LF 17.000 $60.000 $33.000 $85.000 $0.000 $49.630 $43.000 $40.000
438 6004 CLEANING AND SEALING EXIST JOINTS(CL7) LF 224.000 $45.000 $50.000 $55.000 $0.000 $46.010 $115.660 $75.000
438 6016 CLEAN AND SEAL EXIST JTS (STRIP SEAL) LF 240.000 $60.000 $50.000 $125.000 $0.000 $45.770 $150.950 $110.000
442 6007 STR STEEL (MISC NON - BRIDGE) LB 322.000 $19.000 $21.000 $45.000 $0.000 $18.310 $26.580 $25.000
450 6005 RAIL (TY T221)(HPC) LF 574.000 $120.000 $100.000 $155.000 $0.000 $114.260 $124.850 $95.000
450 6031 RAIL (TY C221)(HPC) LF 1,219.000 $150.000 $120.000 $167.000 $0.000 $190.750 $145.440 $150.000
450 6051 RAIL (HANDRAIL)(TY E) LF 61.000 $190.000 $150.000 $167.000 $0.000 $173.860 $218.720 $150.000
450 6119 RAIL (CLF-RO) LF 460.000 $100.000 $120.000 $300.000 $0.000 $91.180 $109.650 $185.000
454 6018 SEALED EXPANSION JOINT (4 IN) (SEJ - M) LF 163.000 $185.000 $240.000 $293.240 $0.000 $195.550 $287.640 $220.000
464 6005 RC PIPE (CL III)(24 IN) LF 620.000 $110.000 $110.000 $100.000 $0.000 $111.770 $143.050 $150.000
465 6032 INLET (COMPL)(PCU)(3FT)(BOTH) EA 4.000 $8,500.000 $7,500.000 $7,000.000 $0.000 $10,045.440 $20,887.330 $11,000.000
465 6071 INLET (COMPL)(PSL)(RC)(4FTX4FT) EA 1.000 $7,000.000 $5,500.000 $6,000.000 $0.000 $5,901.450 $12,595.730 $8,000.000
465 6158 INLET(COMPL)(PAZD)(FG)(3FTX3FT-3FTX3FT) EA 1.000 $7,500.000 $5,200.000 $6,000.000 $0.000 $5,152.530 $12,191.860 $8,000.000
496 6002 REMOV STR (INLET) EA 1.000 $1,400.000 $1,400.000 $850.000 $0.000 $1,447.690 $1,797.230 $2,300.000
496 6010 REMOV STR (BRIDGE 100 - 499 FT LENGTH) EA 2.000 $125,000.000 $120,000.000 $250,000.000 $0.000 $113,185.940 $137,894.000 $120,000.000
500 6001 MOBILIZATION LS 1.000 $1,157,374.380 $1,170,000.000 $1,150,000.000 $0.000 $1,422,766.790 $1,372,000.000 $1,580,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 16.000 $30,000.000 $18,500.000 $11,000.000 $0.000 $50,759.760 $42,000.000 $20,000.000
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 140.000 $34.000 $55.000 $50.000 $0.000 $65.900 $35.480 $35.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 140.000 $10.000 $12.000 $14.140 $0.000 $27.960 $15.050 $5.000
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 986.000 $25.000 $28.000 $45.000 $0.000 $64.910 $34.940 $35.000
506 6024 CONSTRUCTION EXITS (REMOVE) SY 986.000 $9.200 $12.000 $13.130 $0.000 $25.960 $13.980 $5.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 3,105.000 $3.150 $5.000 $7.000 $0.000 $6.190 $3.330 $3.050
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 3,130.000 $1.000 $1.000 $1.010 $0.000 $2.000 $1.080 $0.100
506 6042 BIODEG EROSN CONT LOGS (INSTL) (18") LF 99.000 $14.000 $12.000 $10.000 $0.000 $12.980 $6.990 $6.550
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 99.000 $3.000 $1.000 $1.260 $0.000 $2.500 $1.340 $0.250
506 6047 TEMP SDMT CONT FENCE (INLET PROTECTION) LF 25.000 $10.500 $12.000 $12.000 $0.000 $16.480 $8.870 $10.000
508 6001 CONSTRUCTING DETOURS SY 1,247.000 $125.000 $190.000 $200.000 $0.000 $128.970 $145.400 $350.000
512 6001 PORT CTB (FUR & INST)(SGL SLOPE)(TY 1) LF 4,350.000 $90.000 $102.000 $65.000 $0.000 $90.720 $31.470 $95.000
512 6005 PORT CTB (FUR & INST)(F-SHAPE)(TY 1) LF 35.000 $60.000 $50.000 $150.000 $0.000 $189.730 $280.260 $300.000
512 6025 PORT CTB (MOVE)(SGL SLP)(TY 1) LF 3,900.000 $18.000 $14.000 $5.000 $0.000 $9.150 $3.760 $10.000
512 6049 PORT CTB (REMOVE)(SGL SLP)(TY 1) LF 4,350.000 $20.000 $8.000 $7.000 $0.000 $12.480 $12.690 $10.000
512 6053 PORT CTB (REMOVE)(F-SHAPE)(TY 1) LF 35.000 $23.000 $14.000 $35.000 $0.000 $15.810 $45.950 $65.000
529 6005 CONC CURB (MONO) (TY II) LF 2,740.000 $14.000 $10.000 $5.000 $0.000 $6.660 $6.370 $5.000
529 6008 CONC CURB & GUTTER (TY II) LF 3,118.000 $42.000 $17.000 $26.000 $0.000 $54.480 $59.990 $35.000
530 6017 DRIVEWAYS (CONC) (HES) SY 2,306.000 $120.000 $120.000 $100.000 $0.000 $138.890 $171.330 $120.000
531 6001 CONC SIDEWALKS (4") SY 1,522.000 $100.000 $65.000 $60.000 $0.000 $76.530 $103.330 $75.000
531 6005 CURB RAMPS (TY 2) EA 5.000 $3,500.000 $2,200.000 $1,500.000 $0.000 $2,413.170 $3,432.710 $2,500.000
531 6013 CURB RAMPS (TY 10) EA 10.000 $3,000.000 $2,300.000 $1,450.000 $0.000 $2,219.010 $3,252.830 $2,600.000
536 6002 CONC MEDIAN SY 26.000 $140.000 $240.000 $60.000 $0.000 $105.950 $482.150 $700.000
538 6001 RIGHT OF WAY MARKERS EA 24.000 $375.000 $380.000 $380.930 $0.000 $312.050 $525.000 $650.000
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 300.000 $26.000 $25.000 $23.640 $0.000 $29.960 $26.820 $22.500
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 2.000 $2,050.000 $2,000.000 $2,170.430 $0.000 $2,119.010 $3,019.360 $1,956.730
542 6001 REMOVE METAL BEAM GUARD FENCE LF 774.000 $3.500 $3.000 $2.840 $0.000 $2.910 $2.150 $2.500
542 6002 REMOVE TERMINAL ANCHOR SECTION EA 2.000 $280.000 $155.000 $283.900 $0.000 $194.720 $215.000 $125.000
542 6003 REMOVE DOWNSTREAM ANCHOR TERMINAL EA 2.000 $260.000 $300.000 $283.900 $0.000 $187.230 $215.000 $250.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 2.000 $3,000.000 $3,000.000 $5,000.000 $0.000 $2,747.680 $3,063.750 $2,875.000
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 6.000 $300.000 $260.000 $283.890 $0.000 $248.050 $322.500 $250.000
545 6003 CRASH CUSH ATTEN (MOVE & RESET) EA 3.000 $1,900.000 $1,500.000 $2,000.000 $0.000 $1,410.460 $1,414.630 $1,700.000
545 6005 CRASH CUSH ATTEN (REMOVE) EA 7.000 $1,300.000 $1,000.000 $885.000 $0.000 $832.130 $707.320 $1,000.000
545 6010 CRASH CUSH ATTEN (INSTL)(L)(W)(TL3) EA 1.000 $47,000.000 $75,000.000 $65,000.000 $0.000 $52,684.870 $85,000.000 $75,000.000
545 6019 CRASH CUSH ATTEN (INSTL)(S)(N)(TL3) EA 6.000 $10,000.000 $9,500.000 $9,000.000 $0.000 $13,360.630 $10,500.000 $8,800.000
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 9.000 $750.000 $700.000 $655.000 $0.000 $631.040 $720.250 $643.000
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 8.000 $940.000 $820.000 $799.000 $0.000 $748.910 $849.250 $696.000
644 6068 RELOCATE SM RD SN SUP&AM TY 10BWG EA 1.000 $750.000 $690.000 $635.000 $0.000 $532.560 $736.380 $550.000
644 6075 RELOCATE SM RD SN SUP&AM(SIGN ONLY) EA 4.000 $280.000 $200.000 $195.000 $0.000 $411.900 $161.250 $250.000
658 6013 INSTL DEL ASSM (D-SW)SZ (BRF)CTB EA 3.000 $34.000 $23.000 $20.000 $0.000 $23.300 $22.580 $20.000
658 6015 INSTL DEL ASSM (D-SW)SZ (BRF)GF1 EA 1.000 $25.000 $23.000 $25.000 $0.000 $24.410 $22.580 $20.000
658 6028 INSTL DEL ASSM (D-SY)SZ (BRF)GF1 EA 6.000 $25.000 $23.000 $25.000 $0.000 $24.410 $22.580 $20.000
658 6099 INSTL OM ASSM (OM-2Z)(WFLX)GND EA 2.000 $100.000 $50.000 $65.000 $0.000 $80.440 $67.730 $45.000
662 6064 WK ZN PAV MRK REMOV (W)6"(BRK) LF 367.000 $2.000 $1.000 $2.250 $0.000 $0.920 $0.890 $1.250
662 6067 WK ZN PAV MRK REMOV (W)6"(SLD) LF 8,186.000 $1.500 $1.000 $1.350 $0.000 $0.890 $0.860 $1.250
662 6071 WK ZN PAV MRK REMOV (W)8"(SLD) LF 1,526.000 $2.000 $2.000 $3.600 $0.000 $1.810 $1.750 $1.700
662 6075 WK ZN PAV MRK REMOV (W)24"(SLD) LF 16.000 $10.000 $6.000 $12.000 $0.000 $5.550 $5.380 $10.000
662 6098 WK ZN PAV MRK REMOV (Y)6"(SLD) LF 7,440.000 $1.800 $1.000 $1.350 $0.000 $0.890 $0.860 $1.250
666 6036 REFL PAV MRK TY I (W)8"(SLD)(100MIL) LF 1,603.000 $1.800 $1.800 $1.100 $0.000 $1.440 $1.610 $1.750
666 6048 REFL PAV MRK TY I (W)24"(SLD)(100MIL) LF 693.000 $10.000 $6.000 $8.400 $0.000 $5.550 $5.380 $7.000
666 6054 REFL PAV MRK TY I (W)(ARROW)(100MIL) EA 4.000 $165.000 $200.000 $250.000 $0.000 $194.160 $188.130 $200.000
666 6225 PAVEMENT SEALER 6" LF 10,257.000 $0.500 $0.700 $0.250 $0.000 $0.410 $0.610 $0.250
666 6226 PAVEMENT SEALER 8" LF 1,603.000 $0.800 $0.800 $0.350 $0.000 $0.750 $0.730 $0.340
666 6230 PAVEMENT SEALER 24" LF 693.000 $4.500 $2.200 $3.000 $0.000 $2.050 $1.990 $1.000
666 6231 PAVEMENT SEALER (ARROW) EA 4.000 $65.000 $110.000 $50.000 $0.000 $107.620 $104.280 $20.000
666 6306 RE PM W/RET REQ TY I (W)6"(BRK)(100MIL) LF 1,784.000 $2.000 $1.300 $1.000 $0.000 $1.160 $1.130 $1.000
666 6309 RE PM W/RET REQ TY I (W)6"(SLD)(100MIL) LF 3,727.000 $1.800 $1.300 $1.000 $0.000 $1.130 $1.100 $0.850
666 6321 RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL) LF 4,587.000 $1.800 $1.300 $1.000 $0.000 $1.130 $1.100 $0.850
666 6356 REFL PAV MRK TY II (R&W)6"(FIRE LANE) LF 159.000 $28.000 $2.600 $2.000 $0.000 $2.500 $2.420 $2.500
672 6010 REFL PAV MRKR TY II-C-R EA 138.000 $8.000 $5.000 $8.550 $0.000 $4.720 $4.570 $5.000
677 6001 ELIM EXT PAV MRK & MRKS (4") LF 2,471.000 $1.000 $0.450 $1.000 $0.000 $0.410 $0.400 $0.600
677 6003 ELIM EXT PAV MRK & MRKS (8") LF 965.000 $1.500 $0.450 $2.000 $0.000 $0.440 $0.430 $1.000
677 6007 ELIM EXT PAV MRK & MRKS (24") LF 415.000 $4.150 $0.700 $5.000 $0.000 $0.670 $0.650 $3.500
678 6002 PAV SURF PREP FOR MRK (6") LF 10,257.000 $0.600 $0.400 $0.200 $0.000 $0.370 $0.350 $0.050
678 6004 PAV SURF PREP FOR MRK (8") LF 1,603.000 $0.750 $0.500 $0.400 $0.000 $0.430 $0.420 $0.100
678 6008 PAV SURF PREP FOR MRK (24") LF 693.000 $2.000 $0.700 $2.000 $0.000 $0.610 $0.590 $0.300
678 6009 PAV SURF PREP FOR MRK (ARROW) EA 4.000 $35.000 $40.000 $50.000 $0.000 $38.830 $37.630 $10.000
730 6107 FULL - WIDTH MOWING CYC 3.000 $4,500.000 $3,500.000 $2,500.000 $0.000 $3,328.510 $6,323.310 $1,000.000
734 6002 LITTER REMOVAL CYC 3.000 $2,500.000 $2,500.000 $2,000.000 $0.000 $1,664.250 $4,636.480 $2,000.000
752 6004 TREE TRIMMING / BRUSH REMOVAL(CHANNELS) AC 0.660 $11,500.000 $8,500.000 $10,000.000 $0.000 $42,230.460 $4,225.820 $50,000.000
752 6015 TREE AND BRUSH REMOVAL AC 1.250 $20,000.000 $5,400.000 $10,000.000 $0.000 $7,905.210 $4,225.820 $50,000.000
780 6002 CNC CRACK REPAIR (DISCRETE)(INJECT) LF 31.000 $63.000 $130.000 $135.130 $0.000 $104.020 $150.500 $140.000
3077 6001 SP MIXES SP-B PG64-22 TON 2,710.000 $150.000 $135.000 $150.000 $0.000 $133.640 $130.080 $136.000
3077 6013 SP MIXES SP-C SAC-B PG64-22 TON 1,060.000 $190.000 $145.000 $185.000 $0.000 $132.220 $140.920 $138.000
3077 6075 TACK COAT GAL 387.000 $4.500 $1.200 $3.070 $0.000 $3.710 $1.130 $3.000
5113 6001 WROUGHT IRON FENCE LF 48.000 $145.000 $125.000 $72.120 $0.000 $4.160 $86.000 $86.000
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 4.000 $15,000.000 $22,800.000 $20,042.940 $0.000 $45,489.620 $14,727.940 $11,000.000
6185 6002 TMA (STATIONARY) DAY 74.000 $230.000 $240.000 $243.440 $0.000 $1,109.500 $215.520 $400.000
6185 6005 TMA (MOBILE OPERATION) DAY 16.000 $650.000 $550.000 $945.000 $0.000 $1,109.500 $1,021.250 $1,300.000
Totals: $13,211,118.18 $11,749,150.19 $12,031,862.52 $0.00 $14,371,512.45 $14,737,620.04 $15,674,618.60