DENTON FM 3524 (0081-05-044)

Items: 74

County: DENTON
Length: N/A
Highway: FM 3524
District: DALLAS
Control Number: 0081-05-044
DBE Goal: N/A
Project: SSW 81-5-44
Guaranty: N/A
Time: 164 WORKING DAYS
Engineer's Estimate: $1,742,512.31
Date: 08/07/2018 (7 years ago)
Contract Number: N/A
Type: BASE, ASP, PVT MRK
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$1,742,512.31
$1,667,506.66
Over/Under Est: -4.3% -$75,005.65
Over/Under Est: 0.37% $6,528.35
Amt Left: 4.89% $81,534.00
$1,773,163.66
Over/Under Est: 1.76% $30,651.35
Amt Left: 6.34% $105,657.00
Delta: -1.38% -$24,123.00
$2,043,635.98
Over/Under Est: 17.28% $301,123.67
Amt Left: 22.56% $376,129.32
Delta: -15.25% -$270,472.32

Bid Items & Bid Tabulations

74 Total 0 of 74
DENTON  |  FM 3524  |  DALLAS  |  0081-05-044  |  08/07/2018  |  $1,742,512.31  |  SSW 81-5-44  |  BASE, ASP, PVT MRK  |  164 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
THE LANE CONSTRUCTION CORPORATION
ED BELL CONSTRUCTION COMPANY
JAGOE-PUBLIC COMPANY
A. L. HELMCAMP, INC.
PREPARING ROW
STA 92.100 $1,400.000 $50.000 $2,100.000 $1,200.000 $950.000
REMOVING CONC (DRIVEWAYS)
SY 171.000 $10.000 $9.000 $21.000 $20.000 $30.000
REMOV STAB BASE AND ASPH PAV (0"-12")
SY 1,971.000 $12.000 $5.500 $9.450 $7.000 $6.000
EXCAVATION (ROADWAY)
CY 220.000 $7.400 $50.000 $10.000 $29.000 $18.000
SUBGRADE WIDENING (DENS CONT)
STA 92.100 $400.000 $500.000 $735.000 $405.000 $770.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 2,526.000 $11.000 $31.000 $8.500 $9.750 $35.000
BACKFILL (TY A OR B)
STA 92.100 $130.000 $75.000 $94.500 $415.000 $400.000
COMPOST MANUF TOPSOIL (4")
SY 51,430.000 $1.200 $0.850 $0.100 $0.890 $1.500
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 51,430.000 $0.120 $0.180 $0.080 $0.120 $0.150
DRILL SEED (TEMP)(WARM OR COOL)
SY 51,430.000 $0.070 $0.150 $0.060 $0.070 $0.150
VEGETATIVE WATERING
MG 10,045.000 $6.000 $19.500 $0.100 $25.000 $1.000
FL BS (RDWY DEL) (TY D GR 1-2)
TON 3,716.500 $26.000 $26.000 $33.000 $19.000 $32.000
REWORK BS MTL (TY C) (6") (ORD COMP)
SY 22,517.000 $5.000 $1.650 $2.000 $2.470 $3.500
CEMENT
TON 148.000 $110.000 $160.000 $225.000 $141.000 $220.000
CEMENT TREAT (MX EXST MTL & NW BS) (6")
SY 30,715.000 $4.000 $3.150 $1.500 $1.470 $4.700
ASPH (CRS-2P)
GAL 7,422.000 $3.000 $4.200 $2.500 $3.580 $3.000
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
GAL 6,233.600 $3.100 $4.550 $3.900 $3.890 $4.000
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
CY 282.000 $80.000 $135.000 $111.000 $112.640 $145.000
SUPERPAVE MIXTURES SP-C SAC-B PG64-22
TON 5,209.000 $89.000 $75.000 $81.000 $67.000 $85.000
RIPRAP (CONC)(4 IN)
CY 3.500 $320.000 $750.000 $1,050.000 $740.000 $670.000
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 13.700 $127.000 $190.000 $315.000 $322.000 $240.000
RIPRAP (MOW STRIP)(4 IN)
CY 33.900 $430.000 $550.000 $525.000 $462.000 $670.000
CONC BOX CULV (5 FT X 3 FT)
LF 17.000 $220.000 $500.000 $945.000 $658.000 $570.000
CONC BOX CULV (6 FT X 3 FT)
LF 7.000 $340.000 $650.000 $1,365.000 $976.000 $730.000
RC PIPE (CL III)(18 IN)
LF 262.000 $47.000 $110.000 $84.000 $75.500 $65.000
RC PIPE (CL III)(24 IN)
LF 30.000 $60.000 $125.000 $94.500 $107.000 $115.000
RC PIPE (CL III)(36 IN)
LF 37.000 $110.000 $250.000 $105.000 $147.750 $175.000
WINGWALL (PW - 1) (HW=5 FT)
EA 2.000 $14,000.000 $6,250.000 $12,600.000 $14,550.000 $9,000.000
SET (TY I)(S= 5 FT)(HW= 5 FT)(3:1) (C)
EA 1.000 $5,000.000 $8,000.000 $11,550.000 $23,642.000 $10,000.000
SET (TY I)(S= 6 FT)(HW= 5 FT)(3:1) (C)
EA 1.000 $5,500.000 $8,500.000 $9,450.000 $16,270.000 $11,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 18.000 $680.000 $850.000 $630.000 $834.620 $850.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 1.000 $850.000 $875.000 $630.000 $743.810 $910.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 2.000 $1,005.000 $1,400.000 $840.000 $1,172.860 $1,100.000
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 1.000 $4,100.000 $3,700.000 $3,150.000 $4,120.000 $4,300.000
CLEAN EXIST CULVERTS
EA 2.000 $2,000.000 $1,000.000 $1,000.000 $2,087.500 $1,500.000
REMOV STR (WINGWALL)
EA 4.000 $1,160.000 $1,775.000 $1,050.000 $549.500 $1,500.000
REMOV STR (PIPE)
LF 209.000 $13.000 $25.000 $11.550 $12.920 $30.000
MOBILIZATION
LS 1.000 $150,000.000 $75,000.000 $171,000.000 $170,000.000 $186,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $5,000.000 $5,000.000 $17,850.000 $4,250.000 $22,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 50.000 $23.000 $29.000 $25.200 $42.110 $40.000
ROCK FILTER DAMS (REMOVE)
LF 50.000 $6.000 $13.000 $10.500 $10.530 $15.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 70.000 $19.000 $29.050 $21.000 $29.470 $10.000
CONSTRUCTION EXITS (REMOVE)
SY 70.000 $6.000 $13.000 $8.400 $10.530 $3.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 300.000 $4.300 $6.700 $3.410 $4.630 $8.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 300.000 $0.650 $1.700 $1.050 $1.050 $3.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 3.000 $5,300.000 $7,000.000 $4,200.000 $5,500.000 $3,000.000
INTERSECTIONS (CONC)
SY 139.000 $85.000 $125.000 $94.500 $150.000 $150.000
INTERSECTIONS (ACP)
SY 805.000 $21.000 $25.000 $31.500 $15.000 $35.000
DRIVEWAYS (ACP)
SY 1,342.000 $30.000 $25.000 $42.000 $16.000 $33.000
DRIVEWAYS (CONC) (HES)
SY 47.000 $75.000 $75.000 $168.000 $200.000 $170.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 13,731.000 $0.100 $0.230 $0.260 $0.160 $0.180
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 8,930.000 $0.250 $0.260 $0.260 $0.190 $0.200
MTL W-BEAM GD FEN (STEEL POST)
LF 225.000 $20.000 $24.350 $21.840 $24.210 $23.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,300.000 $3,000.000 $2,651.250 $2,315.880 $2,700.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 10.000 $280.000 $210.000 $231.000 $210.540 $230.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 23.000 $420.000 $440.000 $481.950 $394.750 $490.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 8.000 $500.000 $685.000 $693.000 $394.750 $750.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 4.000 $530.000 $635.000 $661.500 $421.070 $700.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $670.000 $765.000 $834.750 $552.650 $850.000
REMOVE SM RD SN SUP&AM
EA 3.000 $115.000 $100.000 $157.500 $78.950 $120.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 8.000 $60.000 $50.000 $52.500 $42.110 $60.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,439.000 $1.000 $1.750 $1.440 $1.540 $0.600
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 160.000 $5.750 $6.000 $6.300 $6.320 $6.000
PAVEMENT SEALER 4"
LF 1,290.000 $0.170 $0.350 $0.370 $0.370 $0.190
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 19,130.000 $0.440 $0.450 $0.470 $0.470 $0.400
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 990.000 $0.440 $1.000 $1.050 $1.050 $0.450
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 14,975.000 $0.450 $0.450 $0.470 $0.470 $0.400
REFL PAV MRKR TY II-A-A
EA 241.000 $3.400 $4.000 $4.200 $4.210 $5.000
ELIM EXT PAV MRK & MRKS (4")
LF 1,290.000 $0.530 $0.500 $0.530 $0.530 $1.000
PAV SURF PREP FOR MRK (4")
LF 1,290.000 $0.100 $0.200 $0.210 $0.210 $1.000
FULL - WIDTH MOWING
CYC 3.000 $1,500.000 $190.000 $800.000 $1,500.000 $1,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $17,000.000 $7,500.000 $22,000.000 $5,600.000
TMA (STATIONARY)
EA 2.000 $12,700.000 $22,000.000 $2,500.000 $20,000.000 $12,000.000
TMA (MOBILE OPERATION)
HR 10.000 $115.000 $95.000 $105.000 $50.000 $65.000
Totals: $1,742,512.310 $1,667,506.660 $1,749,040.660 $1,773,163.664 $2,043,635.980