DELTA SH 24 (0136-03-066)

Items: 63

County: DELTA
Length: N/A
Highway: SH 24
District: PARIS
Control Number: 0136-03-066
DBE Goal: N/A
Project: C 136-3-66
Guaranty: N/A
Time: 69 WORKING DAYS
Engineer's Estimate: $6,346,539.71
Date: 04/05/2023 (3 years ago)
Contract Number: N/A
Type: PREVENTIVE MAINTENANCE
Mail/Deliver Bids To: N/A
DANIEL TAYLOR
ZACHARY SMITH
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$6,346,539.71
Over/Under Est: 4.93% $312,714.64
$7,892,907.40
Over/Under Est: 24.37% $1,546,367.69
Amt Left: 18.53% $1,233,653.05
$8,020,285.52
Over/Under Est: 26.37% $1,673,745.81
Amt Left: 20.44% $1,361,031.17
Delta: -1.61% -$127,378.12
Subcontractor Percentage Amount
HIGHWAY 19 CONSTRUCTION LLC 4.70% $328,331.02
STRIPING TECHNOLOGY, L.P. 2.80% $195,601.46
SOUTHERN CROSS CONTRACTORS, LLC 0.97% $67,761.93
A. E. MOORE CONSTRUCTION, INC. 0.84% $58,680.44
TEXOP CONSTRUCTION 0.72% $50,297.52
SURFACE PREPARATION TECHNOLOGIES, LLC 0.36% $25,148.76
BARRICADES UNLIMITED 0.22% $15,368.69
Total: 10.61% $741,189.82

Bid Items & Bid Tabulations

63 Total 0 of 63
DELTA  |  SH 24  |  PARIS  |  0136-03-066  |  04/05/2023  |  $6,346,539.71  |  C 136-3-66  |  PREVENT MAINT  |  69 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RICHARD DRAKE CONSTRUCTION COMPANY, L.P.
FNH CONSTRUCTION, LLC
RK HALL, LLC
REMOVING CONC (CURB)
LF 304.000 $25.000 $10.000 $20.000 $25.370
REMOVING CONC (CURB AND GUTTER)
LF 325.000 $15.000 $10.000 $20.000 $55.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
CY 10.000 $75.000 $35.000 $50.000 $86.250
BACKFILL (TY A)
STA 182.000 $200.000 $275.000 $250.000 $334.900
BACKFILL (TY B)
STA 673.000 $250.000 $265.000 $100.000 $163.440
BACKFILL (TY A)
LF 750.000 $5.000 $3.000 $20.000 $8.640
BROADCAST SEED (TEMP) (WARM)
SY 83,390.000 $0.200 $0.100 $0.500 $0.120
BROADCAST SEED (TEMP) (COOL)
SY 83,390.000 $0.200 $0.100 $0.500 $0.120
STRAW/HAY MLCH SEED(PERM)(RURAL)(CLAY)
SY 166,780.000 $0.800 $0.250 $0.500 $0.290
VEGETATIVE WATERING
MG 1,004.000 $30.000 $14.100 $30.000 $72.160
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 1,273.000 $90.000 $118.000 $100.000 $142.940
PLAN & TEXT ASPH CONC PAV(0" TO 3")
SY 8,228.000 $3.500 $3.750 $6.000 $7.520
PLAN & TEXT ASPH CONC PAV(0" TO 6")
SY 340.000 $5.500 $15.200 $6.000 $34.630
PLANE ASPH CONC PAV(0" TO 2")
SY 4,667.000 $9.500 $5.050 $6.000 $11.660
PLANE ASPH CONC PAV(0" TO 8")
SY 4,387.000 $7.000 $6.980 $10.000 $16.440
RIPRAP (MOW STRIP)(4 IN)
CY 75.200 $565.000 $500.000 $550.000 $776.250
CLEANING AND SEALING EXIST JOINTS(CL3)
LF 1,550.000 $60.000 $35.000 $40.000 $32.040
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 456.000 $60.000 $55.000 $50.000 $55.480
RETROFIT RAIL (TY T552)
LF 304.000 $190.000 $180.000 $185.000 $442.750
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
LF 7.000 $1,800.000 $1,000.000 $1,000.000 $1,840.000
WINGWALL (PW - 2) (HW=4 FT)
EA 1.000 $15,000.000 $12,000.000 $20,000.000 $17,250.000
REMOV STR (HEADWALL)
EA 1.000 $3,500.000 $500.000 $5,000.000 $3,450.000
MOBILIZATION
LS 1.000 $69,537.110 $268,250.000 $700,000.000 $320,811.420
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $7,000.000 $25,500.000 $8,500.000 $34,021.980
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 100.000 $15.000 $4.000 $18.000 $4.600
BIODEG EROSN CONT LOGS (REMOVE)
LF 100.000 $15.000 $1.000 $9.000 $1.150
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 1,260.000 $19.000 $65.000 $85.000 $138.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 1,260.000 $17.000 $10.000 $20.000 $34.500
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 1,260.000 $19.000 $25.000 $20.000 $43.700
INTERSECTIONS (ACP)
SY 34.000 $55.000 $47.000 $45.000 $125.840
DRIVEWAYS (ACP)
SY 1,261.000 $55.000 $48.850 $45.000 $47.470
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 170,908.000 $0.450 $0.100 $0.250 $0.120
MTL W-BEAM GD FEN (STEEL POST)
LF 750.000 $38.000 $24.750 $35.000 $33.350
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $2,300.000 $2,225.000 $1,850.000 $3,117.020
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,500.000 $1,400.000 $1,850.000 $1,811.250
MTL BM GD FEN TRANS (ANCHOR PLATE)
EA 8.000 $725.000 $845.000 $1,850.000 $1,178.750
REMOVE METAL BEAM GUARD FENCE
LF 875.000 $4.750 $1.000 $3.000 $3.450
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $1,500.000 $185.000 $500.000 $345.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,300.000 $2,750.000 $3,250.000 $3,565.000
GUARDRAIL END TREATMENT (REMOVE)
EA 5.000 $325.000 $185.000 $2,500.000 $345.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 1.000 $2,000.000 $1,000.000 $6,500.000 $3,392.500
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $1,250.000 $600.000 $2,500.000 $1,437.500
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 1.000 $15,000.000 $6,950.000 $20,000.000 $11,017.000
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 1,260.000 $1.500 $1.500 $2.000 $1.730
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 10,983.000 $3.000 $1.800 $2.000 $1.970
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 4,396.000 $1.250 $1.750 $2.000 $1.970
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 8,029.000 $1.000 $0.800 $2.000 $0.920
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 329.000 $8.500 $6.000 $8.000 $6.900
REFL PAV MRK TY I (W)(ARROW)(090MIL)
EA 38.000 $300.000 $115.000 $150.000 $132.250
REFL PAV MRK TY I (W)(WORD)(090MIL)
EA 38.000 $180.000 $140.000 $150.000 $161.000
REF PAV MRK TY I(W)36"(YLD TRI)(090MIL)
EA 358.000 $65.000 $50.000 $50.000 $57.500
RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)
LF 87,832.000 $0.750 $0.500 $0.650 $0.580
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
LF 87,832.000 $0.750 $0.610 $0.650 $0.700
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
LF 88,672.000 $0.750 $0.610 $0.650 $0.700
REFL PAV MRKR TY II-A-A
EA 1,099.000 $7.000 $3.000 $6.000 $3.450
REFL PAV MRKR TY II-C-R
EA 1,100.000 $7.000 $4.000 $6.000 $4.600
ELIM EXT PAV MRK & MRKS (6")
LF 1,260.000 $1.500 $2.000 $1.000 $2.300
D-GR HMA TY-B PG64-22 (EXEMPT)
TON 36.000 $250.000 $180.000 $125.000 $328.190
SP MIXES SP-C SAC-A PG64-22
TON 43,973.000 $102.000 $108.750 $125.000 $123.970
BONDING COURSE
GAL 19,921.000 $5.750 $5.400 $5.000 $8.010
PORTABLE CHANGEABLE MESSAGE SIGN
EA 3.000 $18,000.000 $12,500.000 $12,500.000 $9,957.840
TMA (STATIONARY)
DAY 165.000 $285.000 $425.000 $200.000 $406.160
TMA (MOBILE OPERATION)
DAY 60.000 $285.000 $280.000 $500.000 $1,085.160
Totals: $6,346,539.710 $6,659,254.350 $7,892,907.400 $8,020,285.520