PREPARING ROW (TREE) (0" TO 6" DIA)
|
EA
|
31.000
|
$200.000
|
$200.000
|
|
|
PREPARING ROW (TREE) (6" TO 24" DIA)
|
EA
|
68.000
|
$1,000.000
|
$1,100.000
|
|
|
PREPARING ROW(TREE)(24" TO 36" DIA.)
|
EA
|
8.000
|
$2,500.000
|
$2,400.000
|
|
|
PREPARING ROW (TREE) (36" TO 48" DIA)
|
EA
|
3.000
|
$4,000.000
|
$4,850.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
20.000
|
$50.000
|
$92.000
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
150.000
|
$30.000
|
$53.000
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
924.000
|
$20.000
|
$14.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (6")
|
SY
|
13.000
|
$18.000
|
$290.000
|
|
|
REMOVING STAB BASE & ASPH PAV (12")
|
SY
|
540.000
|
$20.000
|
$27.500
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
1,626.000
|
$25.000
|
$39.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
402.000
|
$35.000
|
$56.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
|
CY
|
697.000
|
$55.000
|
$115.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY D)
|
SY
|
402.000
|
$2.500
|
$14.000
|
|
|
FL BS(CMP IN PLC)(TY A,B OR D GR4)(12")
|
SY
|
148.000
|
$100.000
|
$97.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
38.000
|
$10.000
|
$40.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
1,245.000
|
$15.000
|
$11.000
|
|
|
PLANE ASPH CONC PAV(2" TO 4")
|
SY
|
1,424.000
|
$15.000
|
$11.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
180.000
|
$179.000
|
$146.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
1,519.000
|
$325.000
|
$340.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
111.400
|
$2,200.000
|
$1,900.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
74.700
|
$1,800.000
|
$2,700.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
39.300
|
$1,800.000
|
$2,700.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
19,579.000
|
$42.000
|
$44.000
|
|
|
BRIDGE SIDEWALK (HPC)
|
SF
|
6,554.000
|
$20.200
|
$21.000
|
|
|
APPROACH SLAB (HPC)
|
CY
|
134.800
|
$1,500.000
|
$1,100.000
|
|
|
INTEGRAL ABUT BKWL (HPC)
|
CY
|
24.200
|
$2,300.000
|
$3,600.000
|
|
|
PRESTR CONC GIRDER (TX34)
|
LF
|
2,630.000
|
$275.000
|
$325.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
344.000
|
$650.000
|
$595.000
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
602.000
|
$20.000
|
$60.000
|
|
|
RAIL (TY C221)(HPC)
|
LF
|
546.200
|
$190.000
|
$310.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
23.000
|
$200.000
|
$385.000
|
|
|
INLET(COMPL)(PAZD)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
1.000
|
$7,000.000
|
$7,100.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$2,000.000
|
$5,200.000
|
|
|
GRATE & FRAME
|
EA
|
11.000
|
$3,400.000
|
$1,500.000
|
|
|
ADJUSTING INLETS
|
EA
|
1.000
|
$8,500.000
|
$10,500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
24.000
|
$30.000
|
$125.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$200,000.000
|
$450,000.000
|
|
|
REMOVE STR (CONC)
|
EA
|
2.000
|
$5,000.000
|
$8,800.000
|
|
|
REMOV STR (TIMBER PILING)
|
EA
|
16.000
|
$100.000
|
$380.000
|
|
|
REMOV STR (WOOD FENCE & POSTS)
|
LF
|
120.000
|
$10.000
|
$25.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$425,000.000
|
$580,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
7.000
|
$15,000.000
|
$44,000.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
160.000
|
$5.000
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
160.000
|
$3.000
|
$4.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
400.000
|
$10.000
|
$15.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
400.000
|
$3.000
|
$6.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
804.000
|
$40.000
|
$32.500
|
|
|
DRIVEWAYS (CONC)
|
SY
|
56.000
|
$200.000
|
$170.000
|
|
|
CONC SIDEWALKS (5")
|
SY
|
1,098.000
|
$105.000
|
$75.000
|
|
|
CURB RAMPS (TY 10)
|
EA
|
4.000
|
$2,300.000
|
$1,665.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
50.000
|
$40.000
|
$42.250
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$2,800.000
|
$3,950.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$3,500.000
|
$3,980.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
6.000
|
$50.000
|
$22.250
|
|
|
PAVEMENT SEALER 6"
|
LF
|
819.000
|
$2.000
|
$7.800
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)
|
LF
|
350.000
|
$2.000
|
$7.800
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
|
LF
|
1,400.000
|
$2.000
|
$7.800
|
|
|
SP MIXES SP-D SAC-A PG70-28
|
TON
|
670.000
|
$210.000
|
$270.000
|
|
|
TACK COAT
|
GAL
|
748.000
|
$10.000
|
$9.000
|
|
|
INSTALL BRIDGE IDENTIFICATION NUMBERS
|
EA
|
2.000
|
$500.000
|
$920.000
|
|
|
GEOGRID BASE REINFORCEMENT (TY I)
|
SY
|
4,060.000
|
$5.000
|
$18.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$16,500.000
|
$14,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
20.000
|
$300.000
|
$560.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
16.000
|
$120.000
|
$110.000
|
|
Totals: |
$4,749,688.800
|
$5,827,413.200
|