OPAQUE SEALER FINISH
|
SF
|
33,190.000
|
$1.400
|
$1.000
|
$1.300
|
|
|
CONC STR REPAIR(RAPID DECK REP(PRT DPT)
|
SF
|
12.000
|
$67.500
|
$80.000
|
$38.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
25.000
|
$219.000
|
$150.000
|
$39.000
|
|
|
CONC STR REPAIR (STANDARD)
|
SF
|
50.000
|
$229.000
|
$100.000
|
$22.000
|
|
|
CLEANING EXISTING JOINTS
|
LF
|
200.000
|
$5.501
|
$12.500
|
$2.000
|
|
|
CLEANING AND SEALING JOINTS (FOAM)
|
LF
|
800.000
|
$79.500
|
$40.000
|
$20.000
|
|
|
MOBILIZATION (CALLOUT 1)
|
EA
|
5.000
|
$1,162.000
|
$250.000
|
$93.000
|
|
|
MOBILIZATION (CALLOUT 2)
|
EA
|
3.000
|
$1,162.000
|
$250.000
|
$475.000
|
|
|
MOBILIZATION (CALLOUT 3)
|
EA
|
6.000
|
$1,162.000
|
$1,500.000
|
$475.000
|
|
|
MOBILIZATION (CALLOUT 4)
|
EA
|
6.000
|
$1,162.000
|
$1,000.000
|
$475.000
|
|
|
MOBILIZATION (CALLOUT 5)
|
EA
|
3.000
|
$1,162.000
|
$5,000.000
|
$6,875.000
|
|
|
MOBILIZATION (CALLOUT 6)
|
EA
|
4.000
|
$1,162.000
|
$250.000
|
$475.000
|
|
|
MOBILIZATION (CALLOUT 7)
|
EA
|
10.000
|
$1,162.000
|
$250.000
|
$250.000
|
|
|
MOBILIZATION (CALLOUT 8)
|
EA
|
4.000
|
$1,162.000
|
$2,000.000
|
$475.000
|
|
|
MOBILIZATION (CALLOUT 9)
|
EA
|
24.000
|
$1,162.000
|
$250.000
|
$125.000
|
|
|
MOBILIZATION (CALLOUT 10)
|
EA
|
3.000
|
$1,162.000
|
$3,000.000
|
$2,010.000
|
|
|
MOBILIZATION (CALLOUT 11)
|
EA
|
14.000
|
$1,162.000
|
$500.000
|
$2,010.000
|
|
|
MOBILIZATION (CALLOUT 12)
|
EA
|
2.000
|
$1,162.000
|
$250.000
|
$1,030.000
|
|
|
MOBILIZATION (CALLOUT 13)
|
EA
|
39.000
|
$1,162.000
|
$1,500.000
|
$475.000
|
|
|
MOBILIZATION (CALLOUT 14)
|
EA
|
3.000
|
$1,162.000
|
$2,000.000
|
$475.000
|
|
|
TMA (STATIONARY)
|
DAY
|
730.000
|
$200.000
|
$10.000
|
$365.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
25.000
|
$250.000
|
$10.000
|
$365.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY A)
|
SF
|
36.000
|
$70.000
|
$50.000
|
$20.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY G)
|
SF
|
36.000
|
$21.000
|
$50.000
|
$21.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(T)
|
EA
|
3.000
|
$1,020.000
|
$1,000.000
|
$1,268.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
3.000
|
$3,371.100
|
$500.000
|
$1,155.000
|
|
|
IN SM RD SN SUP&AM (RAIL MOUNT)
|
EA
|
3.000
|
$1,500.000
|
$1,000.000
|
$3,570.000
|
|
|
REPLACE SRS & S TYS80 (1) (T)
|
EA
|
3.000
|
$640.000
|
$500.000
|
$380.000
|
|
|
REPLACE SRS & S TYS80 (1) (T-EXAL)
|
EA
|
3.000
|
$640.000
|
$500.000
|
$380.000
|
|
|
REPLACE SRS & S TYS80 (1) (U-EXAL)
|
EA
|
3.000
|
$640.000
|
$500.000
|
$417.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
|
EA
|
628.000
|
$20.500
|
$35.000
|
$18.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
10.000
|
$27.000
|
$30.000
|
$22.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
10.000
|
$27.200
|
$30.000
|
$22.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB
|
EA
|
30.000
|
$24.500
|
$35.000
|
$14.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
5.000
|
$20.500
|
$30.000
|
$22.000
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(WFLX)SRFHH
|
EA
|
85.000
|
$112.000
|
$115.000
|
$139.000
|
|
|
REPLC DEL ASSM (D-DW)SZ 1(WFLX)SRFHH
|
EA
|
40.000
|
$130.000
|
$115.000
|
$149.000
|
|
RE PM TY III (W)(6")(SLD)
|
LF
|
86,255.000
|
$1.500
|
$0.900
|
$0.750
|
|
RE PM TY III (W)(6")(BRK)
|
LF
|
5,861.000
|
$1.800
|
$0.740
|
$1.000
|
|
RE PM TY III (W)(6")(DOT)
|
LF
|
473.000
|
$2.087
|
$2.840
|
$3.000
|
|
RE PM TY III (W)(8")(SLD)
|
LF
|
6,840.000
|
$1.300
|
$1.000
|
$1.200
|
|
RE PM TY III (W)(12")(SLD)
|
LF
|
1,280.000
|
$3.000
|
$6.830
|
$7.000
|
|
RE PM TY III (W)(24")(SLD)
|
LF
|
36.000
|
$20.140
|
$9.450
|
$10.000
|
|
RE PM TY III (Y)(8")(SLD)
|
LF
|
684.000
|
$2.060
|
$1.050
|
$1.200
|
|
RE PM TY III (Y)(12")(SLD)
|
LF
|
128.000
|
$3.800
|
$9.450
|
$9.000
|
|
RE PM TY III (W)(WORD)
|
EA
|
5.000
|
$271.650
|
$278.250
|
$292.000
|
|
REFL PAV MRKR TY II-C-C
|
EA
|
497.000
|
$4.750
|
$4.990
|
$6.500
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
513.000
|
$5.250
|
$4.990
|
$6.500
|
|
|
ELIM EXT PM & MRKS (6")
|
LF
|
86,255.000
|
$1.200
|
$0.050
|
$0.500
|
|
|
ELIM EXT PM & MRKS (8")
|
LF
|
684.000
|
$4.000
|
$0.900
|
$1.000
|
|
|
ELIM EXT PM & MRKS (12")
|
LF
|
1,408.000
|
$1.360
|
$2.420
|
$2.500
|
|
|
ELIM EXT PM & MRKS (24")
|
LF
|
36.000
|
$3.200
|
$5.250
|
$5.000
|
|
|
ELIM EXT PM & MRKS (WORD)
|
EA
|
5.000
|
$70.000
|
$105.000
|
$103.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
86,255.000
|
$0.400
|
$0.060
|
$0.050
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
1,408.000
|
$0.430
|
$0.110
|
$0.100
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
36.000
|
$0.820
|
$0.210
|
$0.250
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
5.000
|
$27.500
|
$15.750
|
$15.000
|
|
|
SPALLING REPAIR (HYDRAULIC CEMENT)
|
CF
|
10.000
|
$232.260
|
$125.000
|
$28.000
|
|
|
FIBER REINFORCED POLYMER PATCHING MATLS
|
LB
|
500.000
|
$6.150
|
$6.000
|
$2.000
|
|
|
FULL - WIDTH MOWING
|
AC
|
202.000
|
$30.000
|
$80.000
|
$185.000
|
|
|
BROADCAST APPLICATION
|
MI
|
6.000
|
$917.000
|
$850.000
|
$942.000
|
|
|
PAVEMENT EDGES, STRUCTURES & FIXTURES
|
MI
|
28.800
|
$600.000
|
$650.000
|
$140.000
|
|
|
LITTER REMOVAL
|
AC
|
402.960
|
$20.000
|
$25.000
|
$100.000
|
|
|
GRAFFITI REMOVAL (PAINTING)
|
SF
|
17.000
|
$7.701
|
$5.000
|
$5.000
|
|
|
REPLACE RAIL ELEMENT (W-BEAM)
|
LF
|
49.000
|
$20.902
|
$5.000
|
$14.000
|
|
|
REPLACE RAIL ELEMENT (THRIE-BEAM)
|
LF
|
38.000
|
$27.503
|
$5.000
|
$15.000
|
|
|
REPL RAIL ELMNT(THRIE-BM TRANS TO W-BM)
|
EA
|
25.000
|
$38.503
|
$5.000
|
$192.000
|
|
|
REPLACE TIMBER POST W/O CONC FND
|
EA
|
10.000
|
$55.005
|
$10.000
|
$43.000
|
|
|
REALIGN POSTS
|
EA
|
96.000
|
$11.001
|
$2.500
|
$6.000
|
|
|
REPLACE TERMINAL ANCHOR POSTS
|
EA
|
12.000
|
$88.007
|
$5.000
|
$416.000
|
|
|
REM OBSOLETE GET & REPL W/ SGT
|
EA
|
3.000
|
$3,032.000
|
$1,500.000
|
$2,734.000
|
|
|
REPL SINGLE GDRAIL TERM IMPACT HEAD
|
EA
|
4.000
|
$1,320.112
|
$500.000
|
$728.000
|
|
|
REPLACE SINGLE GDRAIL TERMINAL RAIL
|
LF
|
250.000
|
$35.203
|
$10.000
|
$20.000
|
|
|
REPLACE SINGLE GDRAIL TERMINAL POST
|
EA
|
12.000
|
$35.203
|
$50.000
|
$283.000
|
|
|
REPLACE BLOCKOUT
|
EA
|
12.000
|
$11.001
|
$30.000
|
$10.000
|
|
|
RESET SGT IMPACT HEAD
|
EA
|
4.000
|
$220.019
|
$50.000
|
$45.000
|
|
|
REPLACE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
2.000
|
$1,760.149
|
$50.000
|
$928.000
|
|
|
REALIGN EXISTING RAIL
|
LF
|
100.000
|
$11.001
|
$5.000
|
$6.000
|
|
|
REPLACE (SMTC) NARROW
|
EA
|
10.000
|
$26,718.000
|
$2,500.000
|
$27,148.000
|
|
|
REPAIR (SMTC) NARROW
|
LF
|
150.000
|
$228.000
|
$50.000
|
$520.000
|
|
|
REPLACE CRASH CUSH ATTEN (L)(N)(TL3)
|
EA
|
7.000
|
$19,762.500
|
$1,000.000
|
$23,730.000
|
|
|
BRIDGE JOINT REPAIR (SEJ)
|
LF
|
25.000
|
$227.000
|
$350.000
|
$818.000
|
|
|
PARTIAL ABG REPLACEMENTS
|
LF
|
200.000
|
$425.000
|
$750.000
|
$1,510.000
|
|
|
COMPLETE ABG REPLACEMENTS
|
EA
|
6.000
|
$25,000.000
|
$17,500.000
|
$21,400.000
|
|
|
REPLACE VAB SYSTEMS-NETS
|
EA
|
4.000
|
$30,768.000
|
$18,000.000
|
$31,080.000
|
|
|
REPLACE VAB SYSTEMS-TAPES
|
EA
|
16.000
|
$5,600.000
|
$500.000
|
$5,180.000
|
|
|
PERF BASED OPER & MAINT MANAGED LANES
|
MO
|
24.000
|
$54,875.000
|
$66,000.000
|
$85,686.000
|
|
Totals: |
$3,077,247.175
|
$2,424,621.710
|
$3,989,583.100
|