Show Job Controls
Bid Cobra

DALLAS IH0035E (6493-18-001)

Items: 87

County: DALLAS
Length: 0.0100 MILES
Highway: IH0035E
District: DALLAS
Control Number: 6493-18-001
DBE Goal: 0.0%
Project: RMC - A00218278
Guaranty: $59,000.00
Time: 730 CALENDAR DAYS
Engineer's Estimate: $3,077,247.18
Date: 07/01/2026 1:00 PM CDT (17 days ago)
Contract Number: 7264002
Type: PERFORMANCE BASED CONTRACT MANAGED LANES
Project ID: A00218278
Project Description: PERF BASED OPER & MAINT OF MANAGED LANES
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
KARL FREDRICKSON
DAVID MORREN
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$3,077,247.18
Over/Under Est: -21.21% -$652,625.47
Over/Under Est: 29.65% $912,335.92
Amt Left: 64.54% $1,564,961.39

Bid Items & Bid Tabulations

87 Total 0 of 87
DALLAS  |  IH0035E  |  DALLAS  |  6493-18-001  |  07/01/2026 1:00 PM CDT  |  $3,077,247.18  |  RMC - A00218278  |  PERFORMANCE BASED CONTRACT MANAGED L...  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ROY JORGENSEN ASSOCIATES, INC.
DCS ASSET MAINTENANCE LLC
OPAQUE SEALER FINISH
SF 33,190.000 $1.400 $1.000 $1.300
CONC STR REPAIR(RAPID DECK REP(PRT DPT)
SF 12.000 $67.500 $80.000 $38.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 25.000 $219.000 $150.000 $39.000
CONC STR REPAIR (STANDARD)
SF 50.000 $229.000 $100.000 $22.000
CLEANING EXISTING JOINTS
LF 200.000 $5.501 $12.500 $2.000
CLEANING AND SEALING JOINTS (FOAM)
LF 800.000 $79.500 $40.000 $20.000
MOBILIZATION (CALLOUT 1)
EA 5.000 $1,162.000 $250.000 $93.000
MOBILIZATION (CALLOUT 2)
EA 3.000 $1,162.000 $250.000 $475.000
MOBILIZATION (CALLOUT 3)
EA 6.000 $1,162.000 $1,500.000 $475.000
MOBILIZATION (CALLOUT 4)
EA 6.000 $1,162.000 $1,000.000 $475.000
MOBILIZATION (CALLOUT 5)
EA 3.000 $1,162.000 $5,000.000 $6,875.000
MOBILIZATION (CALLOUT 6)
EA 4.000 $1,162.000 $250.000 $475.000
MOBILIZATION (CALLOUT 7)
EA 10.000 $1,162.000 $250.000 $250.000
MOBILIZATION (CALLOUT 8)
EA 4.000 $1,162.000 $2,000.000 $475.000
MOBILIZATION (CALLOUT 9)
EA 24.000 $1,162.000 $250.000 $125.000
MOBILIZATION (CALLOUT 10)
EA 3.000 $1,162.000 $3,000.000 $2,010.000
MOBILIZATION (CALLOUT 11)
EA 14.000 $1,162.000 $500.000 $2,010.000
MOBILIZATION (CALLOUT 12)
EA 2.000 $1,162.000 $250.000 $1,030.000
MOBILIZATION (CALLOUT 13)
EA 39.000 $1,162.000 $1,500.000 $475.000
MOBILIZATION (CALLOUT 14)
EA 3.000 $1,162.000 $2,000.000 $475.000
TMA (STATIONARY)
DAY 730.000 $200.000 $10.000 $365.000
TMA (MOBILE OPERATION)
DAY 25.000 $250.000 $10.000 $365.000
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 36.000 $70.000 $50.000 $20.000
REPLACE EXISTING ALUMINUM SIGNS(TY G)
SF 36.000 $21.000 $50.000 $21.000
IN SM RD SN SUP&AM TYS80(1)SB(T)
EA 3.000 $1,020.000 $1,000.000 $1,268.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 3.000 $3,371.100 $500.000 $1,155.000
IN SM RD SN SUP&AM (RAIL MOUNT)
EA 3.000 $1,500.000 $1,000.000 $3,570.000
REPLACE SRS & S TYS80 (1) (T)
EA 3.000 $640.000 $500.000 $380.000
REPLACE SRS & S TYS80 (1) (T-EXAL)
EA 3.000 $640.000 $500.000 $380.000
REPLACE SRS & S TYS80 (1) (U-EXAL)
EA 3.000 $640.000 $500.000 $417.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
EA 628.000 $20.500 $35.000 $18.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 10.000 $27.000 $30.000 $22.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 10.000 $27.200 $30.000 $22.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB
EA 30.000 $24.500 $35.000 $14.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 5.000 $20.500 $30.000 $22.000
INSTL DEL ASSM (D-DW)SZ 1(WFLX)SRFHH
EA 85.000 $112.000 $115.000 $139.000
REPLC DEL ASSM (D-DW)SZ 1(WFLX)SRFHH
EA 40.000 $130.000 $115.000 $149.000
RE PM TY III (W)(6")(SLD)
LF 86,255.000 $1.500 $0.900 $0.750
RE PM TY III (W)(6")(BRK)
LF 5,861.000 $1.800 $0.740 $1.000
RE PM TY III (W)(6")(DOT)
LF 473.000 $2.087 $2.840 $3.000
RE PM TY III (W)(8")(SLD)
LF 6,840.000 $1.300 $1.000 $1.200
RE PM TY III (W)(12")(SLD)
LF 1,280.000 $3.000 $6.830 $7.000
RE PM TY III (W)(24")(SLD)
LF 36.000 $20.140 $9.450 $10.000
RE PM TY III (Y)(8")(SLD)
LF 684.000 $2.060 $1.050 $1.200
RE PM TY III (Y)(12")(SLD)
LF 128.000 $3.800 $9.450 $9.000
RE PM TY III (W)(WORD)
EA 5.000 $271.650 $278.250 $292.000
REFL PAV MRKR TY II-C-C
EA 497.000 $4.750 $4.990 $6.500
REFL PAV MRKR TY II-C-R
EA 513.000 $5.250 $4.990 $6.500
ELIM EXT PM & MRKS (6")
LF 86,255.000 $1.200 $0.050 $0.500
ELIM EXT PM & MRKS (8")
LF 684.000 $4.000 $0.900 $1.000
ELIM EXT PM & MRKS (12")
LF 1,408.000 $1.360 $2.420 $2.500
ELIM EXT PM & MRKS (24")
LF 36.000 $3.200 $5.250 $5.000
ELIM EXT PM & MRKS (WORD)
EA 5.000 $70.000 $105.000 $103.000
PAV SURF PREP FOR MRK (6")
LF 86,255.000 $0.400 $0.060 $0.050
PAV SURF PREP FOR MRK (12")
LF 1,408.000 $0.430 $0.110 $0.100
PAV SURF PREP FOR MRK (24")
LF 36.000 $0.820 $0.210 $0.250
PAV SURF PREP FOR MRK (WORD)
EA 5.000 $27.500 $15.750 $15.000
SPALLING REPAIR (HYDRAULIC CEMENT)
CF 10.000 $232.260 $125.000 $28.000
FIBER REINFORCED POLYMER PATCHING MATLS
LB 500.000 $6.150 $6.000 $2.000
FULL - WIDTH MOWING
AC 202.000 $30.000 $80.000 $185.000
BROADCAST APPLICATION
MI 6.000 $917.000 $850.000 $942.000
PAVEMENT EDGES, STRUCTURES & FIXTURES
MI 28.800 $600.000 $650.000 $140.000
LITTER REMOVAL
AC 402.960 $20.000 $25.000 $100.000
GRAFFITI REMOVAL (PAINTING)
SF 17.000 $7.701 $5.000 $5.000
REPLACE RAIL ELEMENT (W-BEAM)
LF 49.000 $20.902 $5.000 $14.000
REPLACE RAIL ELEMENT (THRIE-BEAM)
LF 38.000 $27.503 $5.000 $15.000
REPL RAIL ELMNT(THRIE-BM TRANS TO W-BM)
EA 25.000 $38.503 $5.000 $192.000
REPLACE TIMBER POST W/O CONC FND
EA 10.000 $55.005 $10.000 $43.000
REALIGN POSTS
EA 96.000 $11.001 $2.500 $6.000
REPLACE TERMINAL ANCHOR POSTS
EA 12.000 $88.007 $5.000 $416.000
REM OBSOLETE GET & REPL W/ SGT
EA 3.000 $3,032.000 $1,500.000 $2,734.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 4.000 $1,320.112 $500.000 $728.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 250.000 $35.203 $10.000 $20.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 12.000 $35.203 $50.000 $283.000
REPLACE BLOCKOUT
EA 12.000 $11.001 $30.000 $10.000
RESET SGT IMPACT HEAD
EA 4.000 $220.019 $50.000 $45.000
REPLACE DOWNSTREAM ANCHOR TERMINAL
EA 2.000 $1,760.149 $50.000 $928.000
REALIGN EXISTING RAIL
LF 100.000 $11.001 $5.000 $6.000
REPLACE (SMTC) NARROW
EA 10.000 $26,718.000 $2,500.000 $27,148.000
REPAIR (SMTC) NARROW
LF 150.000 $228.000 $50.000 $520.000
REPLACE CRASH CUSH ATTEN (L)(N)(TL3)
EA 7.000 $19,762.500 $1,000.000 $23,730.000
BRIDGE JOINT REPAIR (SEJ)
LF 25.000 $227.000 $350.000 $818.000
PARTIAL ABG REPLACEMENTS
LF 200.000 $425.000 $750.000 $1,510.000
COMPLETE ABG REPLACEMENTS
EA 6.000 $25,000.000 $17,500.000 $21,400.000
REPLACE VAB SYSTEMS-NETS
EA 4.000 $30,768.000 $18,000.000 $31,080.000
REPLACE VAB SYSTEMS-TAPES
EA 16.000 $5,600.000 $500.000 $5,180.000
PERF BASED OPER & MAINT MANAGED LANES
MO 24.000 $54,875.000 $66,000.000 $85,686.000
Totals: $3,077,247.175 $2,424,621.710 $3,989,583.100