Job Info for 6429-71-001

County: DALLAS Highway: SL0012 Date: 04/04/2023 (1 year ago) Engineer's Estimate: $2,489,825 Control Number: 6429-71-001
Project: RMC - 642971001 District: DALLAS Time: 730 CALENDAR DAYS Type: METAL BEAM GUARD FENCE REPAIR
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8
Plans: Plans | Revision | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $2,489,825.00
FIREMAN EXCAVATING, INC.   $1,490,697.00 1
-40.13% | -$999,128.00
TALBRAN ENTERPRISES LLC   $2,566,590.00 2
3.08% | $76,765.00
72.17% | $1,075,893.00
ROY JORGENSEN ASSOCIATES, INC.   $4,569,499.00 3
83.53% | $2,079,674.00
206.53% | $3,078,802.00
78.04% | $2,002,909.00

Bid Items

Items: 39, 0 filtered
DALLAS SL0012  |  DALLAS  |  6429-71-001  |  04/04/2023  |  $2,489,825  |  RMC - 642971001  |  METAL BEAM GUARD FENCE REPAIR  |  730 CALENDAR DAYS
Item code Description Unit Quantity Engineer's Estimate FIREMAN EXCAVATING, INC. TALBRAN ENTERPRISES LLC ROY JORGENSEN ASSOCIATES, INC.
500 6033 MOBILIZATION (CALLOUT) EA 104.000 $600.000 $1.000 $10.000 $1.000
540 6014 SHORT RADIUS LF 600.000 $30.000 $20.000 $49.000 $30.000
550 6002 CHAIN LINK FENCE (REPAIR) (6') LF 1,500.000 $8.000 $1.000 $4.000 $7.000
550 6005 GATE (REPAIR) (DOUBLE) (6' X 14') EA 2.000 $600.000 $250.000 $550.000 $1,000.000
658 6013 INSTL DEL ASSM (D-SW)SZ (BRF)CTB EA 1,500.000 $8.000 $0.010 $6.000 $4.000
658 6026 INSTL DEL ASSM (D-SY)SZ (BRF)CTB EA 1,500.000 $8.000 $0.010 $6.000 $4.000
658 6061 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2 EA 200.000 $10.000 $6.000 $12.000 $20.000
658 6064 INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2 EA 200.000 $15.000 $0.010 $2.000 $20.000
658 6068 INSTL DEL ASSM (D-DY)SZ 1(BRF)GF2 EA 200.000 $25.000 $0.010 $2.000 $20.000
658 6092 INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND EA 200.000 $10.000 $0.010 $6.000 $25.000
658 6095 INSTL DEL ASSM (D-DY)SZ 1(YFLX)GND EA 200.000 $10.000 $0.010 $2.000 $25.000
770 6001 REPAIR RAIL ELEMENT (W - BEAM) LF 20,000.000 $17.000 $11.000 $22.000 $50.000
770 6002 REPAIR RAIL ELEMENT (THRIE - BEAM) LF 30.000 $25.000 $3,500.000 $6.000 $35.000
770 6003 REP RAIL ELMNT(THRIE-BM TRANS TO W -BM) LF 20.000 $40.000 $2,100.000 $6.000 $35.000
770 6012 REM / REPL TIMBER POST W / O CONC FND EA 1,600.000 $40.000 $20.000 $110.000 $125.000
770 6013 REM / REPL STEEL POST W / O CONC FND EA 1,600.000 $30.000 $1.000 $2.000 $200.000
770 6017 REALIGN POSTS EA 2,000.000 $15.000 $1.000 $12.000 $15.000
770 6019 REMOVE & REPLACE BLOCKOUT EA 3,200.000 $15.000 $1.000 $2.000 $40.000
770 6020 REPLACE STL BLOCKOUTS W /WOOD BLOCKOUTS EA 15.000 $20.000 $1.000 $2.000 $30.000
770 6027 REMOVE GDRAIL END TRT / REPL WITH SGT EA 400.000 $2,000.000 $2,250.000 $2,200.000 $3,450.000
770 6033 REPLACE SGT OBJECT MARKER EA 100.000 $50.000 $25.000 $2.000 $30.000
770 6060 REMOVE AND REPLACE DAT EA 50.000 $1,000.000 $400.000 $1,100.000 $1,500.000
771 6001 REPLACE POSTS (TL-3) EA 2,000.000 $200.000 $1.000 $400.000 $340.000
771 6002 REPLACE POSTS (TL-4) EA 1,500.000 $225.000 $1.000 $2.000 $350.000
771 6003 CABLE SPLICE / TURNBUCKLE (TL-3) EA 60.000 $50.000 $1.000 $5.000 $250.000
771 6004 CABLE SPLICE / TURNBUCKLE (TL-4) EA 30.000 $100.000 $1.000 $5.000 $250.000
771 6005 REPAIR CONCRETE FOUNDATION (TL-3) EA 50.000 $100.000 $1.000 $110.000 $500.000
771 6006 REPAIR CONCRETE FOUNDATION (TL-4) EA 3.000 $500.000 $1,000.000 $4,400.000 $500.000
771 6007 REPR OR REPLC CABLE BARR TERM SEC(TL-3) EA 15.000 $1,200.000 $100.000 $1,100.000 $1,000.000
771 6008 REPR OR REPLC CABLE BARR TERM SEC(TL-4) EA 10.000 $1,000.000 $10,000.000 $550.000 $1,000.000
771 6011 CHECK / RE-TENSION CABLE EA 75.000 $125.000 $500.000 $825.000 $500.000
772 6001 POST AND CABLE FENCE (REMOVAL) LF 250.000 $4.000 $1.000 $5.000 $50.000
772 6002 POST AND CABLE FENCE (REMV CONC ANCHOR) EA 5.000 $200.000 $1.000 $110.000 $15.000
772 6004 POST AND CABLE FENCE (NEW CONC ANCHOR) EA 100.000 $100.000 $1.000 $2.000 $50.000
772 6005 POST AND CABLE FENCE(REMV / REPL POSTS) EA 100.000 $60.000 $1.000 $28.000 $80.000
5047 6001 REM/REPLACE CURB GUIDANCE SYSTEM EA 75.000 $100.000 $1.000 $55.000 $120.000
5047 6005 REM/REPLACE DELINEATOR POST ASSEMBLY EA 250.000 $50.000 $1.000 $7.000 $60.000
6001 6001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 60.000 $100.000 $1.000 $55.000 $1.000
6185 6002 TMA (STATIONARY) DAY 560.000 $250.000 $1.000 $2.000 $1.000
Totals: $2,489,825.00 $1,490,697.00 $2,566,590.00 $4,569,499.00