Show Job Controls
Bid Cobra

DALLAS SL0012 (6429-71-001)

Items: 39

County: DALLAS
Length: N/A
Highway: SL0012
District: DALLAS
Control Number: 6429-71-001
DBE Goal: N/A
Project: RMC - 642971001
Guaranty: N/A
Time: 730 CALENDAR DAYS
Engineer's Estimate: $2,489,825.00
Date: 04/04/2023 (3 years ago)
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
NATHAN PETTER
TERRY BLOCKER
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$2,489,825.00
$1,490,697.00
Over/Under Est: -40.13% -$999,128.00
Over/Under Est: 3.08% $76,765.00
Amt Left: 72.17% $1,075,893.00
Over/Under Est: 83.53% $2,079,674.00
Amt Left: 206.53% $3,078,802.00
Delta: -78.04% -$2,002,909.00

Bid Items & Bid Tabulations

39 Total 0 of 39
DALLAS  |  SL0012  |  DALLAS  |  6429-71-001  |  04/04/2023  |  $2,489,825.00  |  RMC - 642971001  |  METAL BEAM GUARD FENCE REPAIR  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FIREMAN EXCAVATING, INC.
TALBRAN ENTERPRISES LLC
ROY JORGENSEN ASSOCIATES, INC.
MOBILIZATION (CALLOUT)
EA 104.000 $600.000 $1.000 $10.000 $1.000
SHORT RADIUS
LF 600.000 $30.000 $20.000 $49.000 $30.000
CHAIN LINK FENCE (REPAIR) (6')
LF 1,500.000 $8.000 $1.000 $4.000 $7.000
GATE (REPAIR) (DOUBLE) (6' X 14')
EA 2.000 $600.000 $250.000 $550.000 $1,000.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 1,500.000 $8.000 $0.010 $6.000 $4.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 1,500.000 $8.000 $0.010 $6.000 $4.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 200.000 $10.000 $6.000 $12.000 $20.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 200.000 $15.000 $0.010 $2.000 $20.000
INSTL DEL ASSM (D-DY)SZ 1(BRF)GF2
EA 200.000 $25.000 $0.010 $2.000 $20.000
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND
EA 200.000 $10.000 $0.010 $6.000 $25.000
INSTL DEL ASSM (D-DY)SZ 1(YFLX)GND
EA 200.000 $10.000 $0.010 $2.000 $25.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 20,000.000 $17.000 $11.000 $22.000 $50.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 30.000 $25.000 $3,500.000 $6.000 $35.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 20.000 $40.000 $2,100.000 $6.000 $35.000
REM / REPL TIMBER POST W / O CONC FND
EA 1,600.000 $40.000 $20.000 $110.000 $125.000
REM / REPL STEEL POST W / O CONC FND
EA 1,600.000 $30.000 $1.000 $2.000 $200.000
REALIGN POSTS
EA 2,000.000 $15.000 $1.000 $12.000 $15.000
REMOVE & REPLACE BLOCKOUT
EA 3,200.000 $15.000 $1.000 $2.000 $40.000
REPLACE STL BLOCKOUTS W /WOOD BLOCKOUTS
EA 15.000 $20.000 $1.000 $2.000 $30.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 400.000 $2,000.000 $2,250.000 $2,200.000 $3,450.000
REPLACE SGT OBJECT MARKER
EA 100.000 $50.000 $25.000 $2.000 $30.000
REMOVE AND REPLACE DAT
EA 50.000 $1,000.000 $400.000 $1,100.000 $1,500.000
REPLACE POSTS (TL-3)
EA 2,000.000 $200.000 $1.000 $400.000 $340.000
REPLACE POSTS (TL-4)
EA 1,500.000 $225.000 $1.000 $2.000 $350.000
CABLE SPLICE / TURNBUCKLE (TL-3)
EA 60.000 $50.000 $1.000 $5.000 $250.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 30.000 $100.000 $1.000 $5.000 $250.000
REPAIR CONCRETE FOUNDATION (TL-3)
EA 50.000 $100.000 $1.000 $110.000 $500.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 3.000 $500.000 $1,000.000 $4,400.000 $500.000
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
EA 15.000 $1,200.000 $100.000 $1,100.000 $1,000.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 10.000 $1,000.000 $10,000.000 $550.000 $1,000.000
CHECK / RE-TENSION CABLE
EA 75.000 $125.000 $500.000 $825.000 $500.000
POST AND CABLE FENCE (REMOVAL)
LF 250.000 $4.000 $1.000 $5.000 $50.000
POST AND CABLE FENCE (REMV CONC ANCHOR)
EA 5.000 $200.000 $1.000 $110.000 $15.000
POST AND CABLE FENCE (NEW CONC ANCHOR)
EA 100.000 $100.000 $1.000 $2.000 $50.000
POST AND CABLE FENCE(REMV / REPL POSTS)
EA 100.000 $60.000 $1.000 $28.000 $80.000
REM/REPLACE CURB GUIDANCE SYSTEM
EA 75.000 $100.000 $1.000 $55.000 $120.000
REM/REPLACE DELINEATOR POST ASSEMBLY
EA 250.000 $50.000 $1.000 $7.000 $60.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 60.000 $100.000 $1.000 $55.000 $1.000
TMA (STATIONARY)
DAY 560.000 $250.000 $1.000 $2.000 $1.000
Totals: $2,489,825.000 $1,490,697.000 $2,566,590.000 $4,569,499.000