Job Info for 6412-33-001

County: DALLAS Highway: IH0030 Date: 03/08/2023 (1 year ago) Engineer's Estimate: $2,014,372 Control Number: 6412-33-001
Project: RMC - 641233001 District: DALLAS Time: 730 CALENDAR DAYS Type: LARGE SIGN REPLACEMENT
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13
Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $2,014,372.30
MICA CORPORATION   $2,430,722.00 1
20.67% | $416,349.70
SYNERGY SIGNS & SERVICES LLC   $3,046,766.00 2
51.25% | $1,032,393.70
25.34% | $616,044.00

Bid Items

Items: 50, 0 filtered
DALLAS IH0030  |  DALLAS  |  6412-33-001  |  03/08/2023  |  $2,014,372  |  RMC - 641233001  |  LARGE SIGN REPL  |  730 CALENDAR DAYS
Item code Description Unit Quantity Engineer's Estimate MICA CORPORATION SYNERGY SIGNS & SERVICES LLC
104 6009 REMOVING CONC (RIPRAP) SY 20.000 $46.000 $440.000 $500.000
104 6014 REMOVING CONC (FOUNDATIONS) CY 12.000 $368.000 $1,180.000 $1,000.000
416 6018 DRILL SHAFT (SIGN MTS) (24 IN) LF 180.000 $380.000 $350.000 $250.000
416 6019 DRILL SHAFT (SIGN MTS) (30 IN) LF 240.000 $370.000 $400.000 $350.000
416 6020 DRILL SHAFT (SIGN MTS) (36 IN) LF 120.000 $370.000 $450.000 $400.000
416 6021 DRILL SHAFT (SIGN MTS) (42 IN) LF 16.000 $668.000 $750.000 $500.000
416 6022 DRILL SHAFT (SIGN MTS) (48 IN) LF 32.000 $760.000 $820.000 $600.000
416 6023 DRILL SHAFT (SIGN MTS) (54 IN) LF 129.000 $764.000 $850.000 $650.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 30.000 $631.000 $1,515.000 $750.000
500 6033 MOBILIZATION (CALLOUT) EA 20.000 $7,500.000 $13,150.000 $25,000.000
506 6042 BIODEG EROSN CONT LOGS (INSTL) (18") LF 40.000 $6.420 $18.000 $20.000
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 40.000 $1.720 $9.000 $10.000
540 6002 MTL W-BEAM GD FEN (STEEL POST) LF 600.000 $30.500 $54.000 $35.000
540 6005 TERMINAL ANCHOR SECTION EA 4.000 $400.000 $1,650.000 $1,500.000
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 1.000 $2,000.000 $3,800.000 $35.000
540 6010 MTL W-BEAM GD FEN ADJUSTMENT LF 25.000 $22.000 $51.000 $25.000
540 6011 MTL THRIE-BEAM GD FEN ADJUSTMENT LF 25.000 $9.450 $62.000 $350.000
540 6012 TERMINAL ANCHOR SECTION ADJUSTMENT EA 1.000 $469.200 $1,300.000 $750.000
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 4.000 $1,200.000 $1,950.000 $1,800.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 200.000 $3.310 $9.000 $25.000
542 6002 REMOVE TERMINAL ANCHOR SECTION EA 2.000 $297.000 $660.000 $300.000
542 6003 REMOVE DOWNSTREAM ANCHOR TERMINAL EA 2.000 $212.000 $775.000 $300.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 4.000 $3,335.000 $4,500.000 $3,650.000
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 1.000 $336.680 $1,550.000 $300.000
636 6001 ALUMINUM SIGNS (TY A) SF 350.000 $43.000 $49.000 $35.000
636 6002 ALUMINUM SIGNS (TY G) SF 4,200.000 $43.000 $39.000 $35.000
636 6003 ALUMINUM SIGNS (TY O) SF 2,000.000 $32.500 $45.000 $35.000
636 6007 REPLACE EXISTING ALUMINUM SIGNS(TY A) SF 300.000 $43.000 $59.000 $37.000
636 6008 REPLACE EXISTING ALUMINUM SIGNS(TY G) SF 120.000 $31.460 $62.000 $37.000
636 6009 REPLACE EXISTING ALUMINUM SIGNS(TY O) SF 1,900.000 $48.000 $70.000 $37.000
647 6001 INSTALL LRSS (STRUCT STEEL) LB 16,440.000 $7.460 $9.750 $5.750
647 6003 REMOVE LRSA EA 8.000 $999.500 $1,515.000 $5,000.000
650 6021 INS OH SN SUP(25 FT BAL TEE) EA 1.000 $28,000.000 $38,280.000 $52,000.000
650 6032 INS OH SN SUP(30 FT CANT) EA 1.000 $33,942.000 $41,700.000 $52,000.000
650 6038 INS OH SN SUP(35 FT CANT) EA 2.000 $52,223.000 $48,500.000 $62,000.000
650 6045 INS OH SN SUP(40 FT CANT) EA 4.000 $43,500.000 $55,020.000 $72,000.000
650 6079 INS OH SN SUP(70 FT BRDG) EA 1.000 $47,000.000 $67,500.000 $150,000.000
650 6089 INS OH SN SUP(80 FT BRDG) EA 1.000 $86,000.000 $73,600.000 $160,000.000
650 6099 INS OH SN SUP(90 FT BRDG) EA 1.000 $89,000.000 $88,100.000 $170,000.000
650 6109 INS OH SN SUP(100 FT BRDG) EA 1.000 $90,000.000 $98,500.000 $180,000.000
650 6119 INS OH SN SUP(110 FT BRDG) EA 1.000 $102,700.000 $108,200.000 $190,000.000
650 6129 INS OH SN SUP(120 FT BRDG) EA 1.000 $102,700.000 $124,900.000 $200,000.000
650 6204 REMOVE OVERHD SIGN SUP EA 3.000 $9,600.000 $9,999.000 $20,000.000
654 6007 REMOVE SIGN WALKWAY EA 8.000 $1,890.000 $1,515.000 $2,500.000
658 6061 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2 EA 12.000 $21.230 $60.000 $28.000
6001 6001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 20.000 $124.030 $505.000 $500.000
6053 6001 SHIFT OVERHEAD SIGN PANELS EA 1.000 $1,283.110 $4,100.000 $2,000.000
6053 6002 REMOVE OVERHEAD SIGN PANELS EA 2.000 $1,322.250 $1,700.000 $2,000.000
6185 6002 TMA (STATIONARY) DAY 50.000 $292.200 $260.000 $200.000
6277 6001 INST LRG GRND MNT AND OVRHD SIGN(STATE) SF 800.000 $48.950 $32.000 $32.000
Totals: $2,014,372.30 $2,430,722.00 $3,046,766.00