Show Job Controls
Bid Cobra

DALLAS US0080 (6401-80-001)

Items: 16

County: DALLAS
Length: N/A
Highway: US0080
District: DALLAS
Control Number: 6401-80-001
DBE Goal: N/A
Project: RMC - 640180001
Guaranty: N/A
Time: 730 CALENDAR DAYS
Engineer's Estimate: $4,843,400.00
Date: 08/03/2022 (3 years ago)
Contract Number: N/A
Type: FULL DEPTH CONCRETE REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (3)
E
Engineer's Estimate
$4,843,400.00
$4,550,330.00
Over/Under Est: -6.05% -$293,070.00
Over/Under Est: 4.3% $208,100.00
Amt Left: 11.01% $501,170.00
Over/Under Est: 12.89% $624,390.00
Amt Left: 20.16% $917,460.00
Delta: -8.24% -$416,290.00

Bid Items & Bid Tabulations

16 Total 0 of 16
DALLAS  |  US0080  |  DALLAS  |  6401-80-001  |  08/03/2022  |  $4,843,400.00  |  RMC - 640180001  |  FULL DEPTH CONC REPAIR  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
O. TREVINO CONSTRUCTION, LLC
ROY JORGENSEN ASSOCIATES, INC.
GIBSON & ASSOCIATES, INC.
FULL - DEPTH REPAIR CRCP (10")
SY 6,120.000 $230.000 $229.000 $260.000 $320.000
FULL - DEPTH REPAIR CRCP (13")
SY 1,400.000 $295.000 $323.000 $275.000 $362.000
FULL - DEPTH REPAIR CPCD (10")
SY 1,600.000 $260.000 $244.000 $245.000 $315.000
FULL - DEPTH REPAIR CPCD (13")
SY 400.000 $290.000 $298.000 $270.000 $344.000
FULL-DPTH REP(BR APPROACH SLAB)(9"-13")
SY 700.000 $430.000 $575.000 $430.000 $500.000
CONC STR REPAIR(DECK REP(PART DEPTH))
SF 12,000.000 $75.000 $55.000 $85.000 $79.410
CONC STR REPAIR(DECK REP (FULL DEPTH))
SF 550.000 $160.000 $155.000 $150.000 $134.000
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 5,000.000 $40.000 $28.000 $35.000 $43.500
MOBILIZATION (CALLOUT)
EA 12.000 $1,500.000 $3,000.000 $1,500.000 $1,000.000
MOBILIZATION (EMERGENCY)
EA 24.000 $2,500.000 $3,000.000 $3,000.000 $1,000.000
SPALLING REPAIR (POLYMERIC) (FLEXIBLE)
GAL 300.000 $50.000 $55.000 $60.000 $78.500
FIBER REINFORCED POLYMER PATCHING MATLS
LB 10,000.000 $6.000 $5.000 $2.250 $8.000
BRIDGE JOINT REPAIR (ARMOR)
LF 1,500.000 $400.000 $384.000 $225.000 $310.000
RAISING AND UNDERSEALING CONCRETE SLAB
LB 8,000.000 $6.500 $5.250 $4.600 $6.760
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 84.000 $200.000 $200.000 $500.000 $110.000
TMA (STATIONARY)
DAY 450.000 $400.000 $200.000 $1,000.000 $220.000
Totals: $4,843,400.000 $4,550,330.000 $5,051,500.000 $5,467,790.000