Show Job Controls
Bid Cobra

DALLAS IH0035E (6399-97-001)

Items: 85

County: DALLAS
Length: N/A
Highway: IH0035E
District: DALLAS
Control Number: 6399-97-001
DBE Goal: N/A
Project: RMC - 639997001
Guaranty: N/A
Time: 730 CALENDAR DAYS
Engineer's Estimate: $3,397,939.24
Date: 08/03/2022 (3 years ago)
Contract Number: N/A
Type: PERFORMANCE BASED CONTRACT MANAGED LANES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$3,397,939.24
$2,943,755.15
Over/Under Est: -13.37% -$454,184.09
Over/Under Est: -2% -$68,094.40
Amt Left: 13.12% $386,089.69
Over/Under Est: 16.41% $557,633.48
Amt Left: 34.37% $1,011,817.57
Delta: -18.79% -$625,727.88
Subcontractor Percentage Amount
STRIPE-A-ZONE, LLC 0.00% $0.00
Total: 0.00% $0.00

Bid Items & Bid Tabulations

85 Total 0 of 85
DALLAS  |  IH0035E  |  DALLAS  |  6399-97-001  |  08/03/2022  |  $3,397,939.24  |  RMC - 639997001  |  PERFORMANCE BASED CONTRACT MANAGED L...  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ROY JORGENSEN ASSOCIATES, INC.
AMERICAN INFRASTRUCTURE MAINTENANCE MANAGEMENT LLC
FIREMAN EXCAVATING, INC.
FULL - DEPTH REPAIR CRCP (14")
SY 150.000 $400.000 $250.000 $500.000 $340.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 400.000 $197.570 $200.000 $59.000 $300.000
CLEANING AND SEALING EXISTING JOINTS
LF 800.000 $15.770 $20.000 $5.880 $15.000
CLEANING EXISTING JOINTS
LF 800.000 $24.000 $5.000 $5.000 $10.000
MOBILIZATION
LS 1.000 $308,903.570 $250,000.000 $330,000.000 $480,000.000
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 120.000 $5.500 $100.000 $15.000 $60.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 120.000 $17.850 $30.000 $30.000 $30.000
CONC MEDIAN
SY 170.000 $80.000 $75.000 $95.030 $280.000
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 5.000 $34.170 $100.000 $100.000 $60.000
REPLACE EXISTING ALUMINUM SIGNS(TY O)
SF 5.000 $33.000 $100.000 $100.000 $60.000
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
EA 5.000 $235.000 $1,000.000 $550.000 $700.000
IN SM RD SN SUP&AM TYS80(1)SB(T)
EA 5.000 $265.000 $1,000.000 $250.000 $700.000
IN SM RD SN SUP&AM TYTWT(1)UA(P)
EA 5.000 $407.750 $1,000.000 $250.000 $600.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 3.000 $1,804.550 $2,500.000 $900.000 $2,000.000
IN SM RD SN SUP&AM (RAIL MOUNT)
EA 3.000 $2,783.810 $2,500.000 $500.000 $500.000
REMOVE OVERHD SIGN SUP
EA 2.000 $7,200.000 $5,000.000 $2,500.000 $500.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 125.000 $6.830 $20.000 $10.000 $25.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 30.000 $5.220 $15.000 $6.000 $25.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 20.000 $35.000 $20.000 $25.000 $25.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 20.000 $21.380 $25.000 $20.000 $25.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 20.000 $34.000 $20.000 $20.000 $25.000
REFL PAV MRK TY I(W)(ENTR GORE)(060MIL)
EA 5.000 $840.480 $505.000 $556.000 $550.000
REFL PAV MRK TY I(W)(EXIT GORE)(060MIL)
EA 5.000 $672.220 $505.000 $556.000 $550.000
PAVEMENT SEALER (ENTR GORE)
EA 5.000 $145.000 $252.500 $278.000 $275.000
PAVEMENT SEALER (EXIT GORE)
EA 5.000 $275.000 $252.500 $278.000 $275.000
REFL PAV MRKR TY II-C-R
EA 540.000 $4.210 $6.060 $10.000 $15.000
REFL PAV MRKR TY II-C-C
EA 381.000 $4.300 $6.060 $10.000 $15.000
ELIM EXT PAV MRK & MRKS (4")
LF 80,952.000 $0.410 $0.470 $0.500 $0.500
ELIM EXT PAV MRK & MRKS (6")
LF 70,715.000 $0.360 $0.470 $0.500 $0.500
ELIM EXT PAV MRK & MRKS (12")
LF 1,770.000 $1.310 $2.020 $2.200 $2.200
ELIM EXT PAV MRK & MRKS (24")
LF 36.000 $2.310 $4.040 $5.000 $4.400
ELIM EXT PAV MRK & MRKS (WORD)
EA 5.000 $57.860 $50.500 $60.000 $55.000
ELIM EXT PAV MRK & MRKS (ENTR GORE)
EA 4.000 $275.000 $328.250 $362.000 $350.000
ELIM EXT PAV MRK & MRKS (EXIT GORE)
EA 4.000 $336.280 $328.250 $362.000 $350.000
PAV SURF PREP FOR MRK (4")
LF 80,952.000 $0.060 $0.010 $0.020 $0.001
PAV SURF PREP FOR MRK (6")
LF 70,715.000 $0.050 $0.010 $0.020 $0.001
PAV SURF PREP FOR MRK (12")
LF 1,770.000 $0.500 $0.010 $1.100 $0.001
PAV SURF PREP FOR MRK (24")
LF 36.000 $0.480 $0.010 $5.000 $0.001
PAV SURF PREP FOR MRK (WORD)
EA 5.000 $13.040 $45.450 $50.000 $1.100
PAV SURF PREP FOR MRK (ENTR GORE)
EA 4.000 $54.470 $100.000 $306.000 $1.100
PAV SURF PREP FOR MRK (EXIT GORE)
EA 4.000 $54.490 $100.000 $306.000 $1.100
SPALLING REPAIR (HYDRAULIC CEMENT)
CF 150.000 $204.170 $100.000 $89.000 $50.000
FIBER REINFORCED POLYMER PATCHING MATLS
LB 500.000 $3.350 $3.500 $3.000 $4.000
FULL - WIDTH MOWING
AC 202.000 $37.510 $100.000 $45.000 $200.000
BROADCAST APPLICATION
MI 68.000 $756.000 $350.000 $550.000 $70.000
PAVEMENT EDGES, STRUCTURES & FIXTURES
MI 2.000 $400.000 $1,000.000 $1,000.000 $1,000.000
LITTER REMOVAL
AC 240.000 $17.040 $25.000 $15.000 $40.000
GRAFFITI REMOVAL (PAINTING)
SF 200.000 $0.630 $7.000 $25.000 $50.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 600.000 $22.900 $19.000 $25.000 $50.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 38.000 $250.000 $25.000 $200.000 $35.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 25.000 $200.000 $35.000 $30.000 $35.000
REALIGN EXISTING RAIL
LF 600.000 $0.950 $10.000 $11.000 $4.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 96.000 $43.150 $50.000 $80.000 $100.000
REALIGN POSTS
EA 96.000 $100.000 $10.000 $100.000 $50.000
REMOVE & REPLACE BLOCKOUT
EA 96.000 $15.820 $10.000 $82.000 $25.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 250.000 $40.190 $32.000 $54.000 $80.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 12.000 $33.200 $65.000 $85.000 $100.000
REPLACE TERMINAL ANCHOR POSTS
EA 12.000 $55.000 $80.000 $40.000 $25.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 4.000 $2,500.000 $3,300.000 $3,000.000 $4,500.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 4.000 $1,000.000 $1,200.000 $1,500.000 $1,200.000
REM & RESET SGT IMPACT HEAD
EA 4.000 $76.660 $200.000 $130.000 $500.000
REPAIR SINGLE GUARDRAIL TERMINAL
EA 4.000 $800.000 $2,000.000 $1,000.000 $4,000.000
REMOVE AND REPLACE DAT
EA 2.000 $1,600.000 $1,600.000 $1,800.000 $3,000.000
REMOVE AND REPLACE (SMTC) (N)
EA 6.000 $14,000.000 $28,000.000 $25,000.000 $30,000.000
REPAIR (TRACC) (BAY)
EA 6.000 $181.820 $500.000 $5,000.000 $1,500.000
REPAIR (SMTC) (N)
LF 150.000 $230.000 $475.000 $150.000 $300.000
CONCRETE RAIL REPAIR (MISC)
LF 400.000 $200.000 $150.000 $206.000 $275.000
BRIDGE JOINT REPAIR (CONCRETE)
LF 400.000 $730.000 $75.000 $118.000 $100.000
RAISING AND UNDERSEALING CONCRETE SLAB
LB 1,000.000 $5.480 $8.000 $10.000 $14.000
MULTIPOLYMER PAV MRK (W)(4")(SLD)
LF 69,612.000 $0.400 $0.530 $0.550 $0.560
MULTIPOLYMER PAV MRK (W)(6")(SLD)
LF 69,612.000 $0.540 $0.750 $0.800 $0.770
MULTIPOLYMER PAV MRK (W)(6")(BRK)
LF 485.000 $0.550 $1.010 $1.100 $1.100
MULTIPOLYMER PAV MRK (W)(6")(DOT)
LF 618.000 $2.110 $2.020 $2.200 $2.200
MULTIPOLYMER PAV MRK (W)(8")(SLD)
LF 11,336.000 $0.880 $1.010 $1.100 $1.100
MULTIPOLYMER PAV MRK (W)(12")(SLD)
LF 1,770.000 $2.650 $2.525 $2.800 $2.600
MULTIPOLYMER PAV MRK (W)(24")(SLD)
LF 36.000 $8.510 $10.100 $15.000 $15.000
MULTIPOLYMER PAV MRK (Y)(4")(SLD)
LF 11,340.000 $0.410 $0.515 $0.550 $0.560
MULTIPOLYMER PAV MRK (Y)(8")(SLD)
LF 400.000 $0.950 $1.263 $1.400 $1.500
MULTIPOLYMER PAV MRK (W) (WORD)
EA 5.000 $296.000 $500.000 $320.000 $300.000
TMA (STATIONARY)
DAY 60.000 $200.550 $750.000 $150.000 $500.000
PARTIAL ABG REPLACEMENTS
LF 36.000 $250.000 $4,000.000 $500.000 $4,000.000
COMPLETE ABG REPLACEMENTS
EA 6.000 $14,000.000 $30,000.000 $12,000.000 $8,000.000
REPLACE VAB SYSTEMS- NETS
EA 4.000 $20,000.000 $33,000.000 $26,000.000 $20,000.000
REPLACE VAB SYSTEMS- TAPES
EA 16.000 $2,250.000 $6,000.000 $4,700.000 $10,000.000
PERF BASED OPER & MAINT MANAGED LANES
MO 24.000 $75,000.000 $50,000.000 $76,400.000 $80,000.000
Totals: $3,397,939.240 $2,943,755.150 $3,329,844.840 $3,955,572.733