Show Job Controls
Bid Cobra

DALLAS US0080 (6381-39-001)

Items: 96

County: DALLAS
Length: N/A
Highway: US0080
District: DALLAS
Control Number: 6381-39-001
DBE Goal: N/A
Project: RMC - 638139001
Guaranty: N/A
Time: 730 CALENDAR DAYS
Engineer's Estimate: $3,259,000.00
Date: 08/04/2021 (4 years ago)
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (4)
E
Engineer's Estimate
$3,259,000.00
$2,474,835.00
Over/Under Est: -24.06% -$784,165.00
Over/Under Est: -11.2% -$364,990.00
Amt Left: 16.94% $419,175.00
Over/Under Est: 4.54% $147,946.00
Amt Left: 37.66% $932,111.00
Delta: -17.72% -$512,936.00
Over/Under Est: 21.35% $695,818.31
Amt Left: 59.8% $1,479,983.31
Delta: -16.08% -$547,872.31

Bid Items & Bid Tabulations

96 Total 0 of 96
DALLAS  |  US0080  |  DALLAS  |  6381-39-001  |  08/04/2021  |  $3,259,000.00  |  RMC - 638139001  |  METAL BEAM GUARD FENCE REPAIR  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FIREMAN EXCAVATING, INC.
SOUTHEAST HIGHWAY GUARDRAIL & ATTENUATORS, LLC
ELITE CASTLE RESOURCES LLC
ROY JORGENSEN ASSOCIATES, INC.
RIPRAP (MOW STRIP)(4 IN)
CY 25.000 $325.000 $500.000 $200.000 $250.000 $437.000
MOBILIZATION (CALLOUT)
EA 208.000 $320.000 $1.000 $2,000.000 $2.000 $2,000.000
MTL W-BEAM GD FEN (TIM POST)
LF 6,500.000 $23.000 $20.000 $31.000 $26.000 $24.500
MTL W-BEAM GD FEN (STEEL POST)
LF 100.000 $25.000 $35.000 $60.000 $39.000 $27.000
TERMINAL ANCHOR SECTION
EA 10.000 $200.000 $10.000 $1.000 $150.000 $24.600
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 10.000 $1,100.000 $2,000.000 $1,500.000 $2,000.000 $1,350.000
MTL BEAM GD FEN TRANS (TL2)
EA 15.000 $200.000 $500.000 $1,000.000 $800.000 $500.000
MTL W-BEAM GD FEN ADJUSTMENT
LF 25.000 $15.000 $1.000 $100.000 $20.000 $5.000
SHORT RADIUS
LF 600.000 $45.000 $20.000 $40.000 $20.000 $32.000
DOWNSTREAM ANCHOR TERMINAL SECT (TY IV)
EA 50.000 $1,000.000 $800.000 $1,500.000 $1,000.000 $800.000
REMOVE METAL BEAM GUARD FENCE
LF 6,000.000 $3.000 $1.000 $2.000 $1.000 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 35.000 $100.000 $300.000 $300.000 $150.000 $500.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 2.000 $20.000 $1.000 $2,000.000 $250.000 $95.200
GUARDRAIL END TREATMENT (INSTALL)
EA 35.000 $2,500.000 $3,000.000 $3,500.000 $3,600.000 $3,100.000
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 10.000 $900.000 $1.000 $500.000 $500.000 $250.000
GUARDRAIL END TREATMENT (REMOVE)
EA 35.000 $100.000 $100.000 $300.000 $1.000 $250.000
CRASH CUSH ATTEN (REMOVE)
EA 10.000 $1,150.000 $500.000 $300.000 $10,000.000 $25,000.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL2)
EA 2.000 $15,000.000 $1,000.000 $100.000 $1,000.000 $1.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 18.000 $16,000.000 $1,000.000 $100.000 $1,000.000 $2,000.000
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
EA 5.000 $20,000.000 $1,000.000 $3,000.000 $1,000.000 $7,500.000
CRASH CUSH ATTEN (INSTL)(R)(N)(TL2)
EA 2.000 $15,000.000 $1,000.000 $500.000 $1,000.000 $1.000
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
EA 10.000 $20,000.000 $1,000.000 $1,000.000 $1,000.000 $2,500.000
CHAIN LINK FENCE (INSTALL) (6')
LF 500.000 $6.000 $3.000 $18.000 $10.000 $15.000
CHAIN LINK FENCE (REPAIR) (6')
LF 1,500.000 $15.000 $3.000 $5.000 $12.000 $12.000
CHAIN LINK FENCE (REMOVE)
LF 750.000 $2.000 $2.000 $7.000 $2.500 $3.000
GATE (INSTALL) (DOUBLE) (6' X 14')
EA 2.000 $1,000.000 $1,200.000 $2,000.000 $150.000 $1,200.000
GATE (REPAIR) (DOUBLE) (6' X 14')
EA 2.000 $1,000.000 $800.000 $1,000.000 $150.000 $350.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 900.000 $5.000 $5.000 $10.000 $5.000 $6.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 900.000 $5.000 $5.000 $10.000 $5.000 $6.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 200.000 $5.000 $20.000 $10.000 $1.000 $6.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 200.000 $5.000 $30.000 $10.000 $15.000 $20.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 200.000 $15.000 $10.000 $10.000 $15.000 $20.000
INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2
EA 200.000 $15.000 $1.000 $10.000 $15.000 $20.000
INSTL DEL ASSM (D-DY)SZ 1(BRF)GF2
EA 200.000 $15.000 $1.000 $10.000 $15.000 $20.000
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND
EA 200.000 $15.000 $5.000 $10.000 $15.000 $10.000
INSTL DEL ASSM (D-DY)SZ 1(YFLX)GND
EA 200.000 $15.000 $5.000 $10.000 $15.000 $10.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 20,000.000 $18.000 $10.000 $15.000 $25.000 $18.500
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 30.000 $20.000 $100.000 $200.000 $5.000 $25.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 20.000 $30.000 $100.000 $300.000 $5.000 $30.000
REM / REPL TIMBER POST W / O CONC FND
EA 1,300.000 $35.000 $35.000 $60.000 $50.000 $45.000
REM / REPL STEEL POST W / O CONC FND
EA 100.000 $35.000 $10.000 $20.000 $50.000 $20.000
REM / REPL TIMBER POST W / CONC FND
EA 250.000 $60.000 $70.000 $60.000 $50.000 $45.000
REM / REPL STEEL POST W / CONC FND
EA 100.000 $50.000 $30.000 $80.000 $50.000 $20.000
REPAIR STEEL POST WITH BASE PLATE
EA 75.000 $150.000 $25.000 $50.000 $50.000 $125.000
REALIGN POSTS
EA 2,000.000 $10.000 $10.000 $1.000 $7.000 $9.000
INSTALL BLOCKOUT (TYPE SPECIFIED)
EA 100.000 $15.000 $10.000 $30.000 $20.000 $12.000
REMOVE & REPLACE BLOCKOUT
EA 1,000.000 $20.000 $10.000 $18.000 $30.000 $20.000
REPLACE STL BLOCKOUTS W /WOOD BLOCKOUTS
EA 15.000 $5.000 $1.000 $100.000 $1.000 $1.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 12,000.000 $20.000 $80.000 $25.000 $35.000 $29.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 1,100.000 $45.000 $1.000 $50.000 $50.000 $60.000
REPLACE TERMINAL ANCHOR POSTS
EA 5.000 $5.000 $100.000 $100.000 $1.000 $38.083
REPLACE HINGED TOP SGT STEEL POST
EA 5.000 $100.000 $1,000.000 $60.000 $50.000 $75.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 50.000 $2,300.000 $1,500.000 $2,500.000 $3,000.000 $2,700.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 200.000 $1,100.000 $800.000 $1,500.000 $890.000 $1,000.000
REM & RESET SGT IMPACT HEAD
EA 100.000 $100.000 $50.000 $50.000 $100.000 $105.000
REPLACE SGT CABLE ASSEMBLY
EA 175.000 $100.000 $75.000 $35.000 $60.000 $100.000
REPLACE SGT CABLE ANCHOR
EA 175.000 $100.000 $75.000 $35.000 $65.000 $100.000
REPLACE SGT STRUT
EA 125.000 $150.000 $75.000 $35.000 $60.000 $100.000
REPLACE SGT OBJECT MARKER
EA 25.000 $30.000 $25.000 $35.000 $25.000 $1.000
REMOVE AND REPLACE LONG SPAN CRT POST
EA 10.000 $60.000 $100.000 $100.000 $100.000 $1.000
REPAIR MTL BM GD FEN(LONG SPAN SYS)
LF 100.000 $40.000 $25.000 $28.000 $50.000 $1.000
REPLACE POSTS (TL-3)
EA 2,000.000 $100.000 $1.000 $100.000 $180.000 $150.000
REPLACE POSTS (TL-4)
EA 350.000 $115.000 $885.000 $100.000 $225.000 $175.000
CABLE SPLICE / TURNBUCKLE (TL-3)
EA 5.000 $100.000 $1,000.000 $200.000 $500.000 $175.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 2.000 $100.000 $1,000.000 $200.000 $500.000 $175.000
REPAIR CONCRETE FOUNDATION (TL-3)
EA 100.000 $60.000 $100.000 $200.000 $200.000 $300.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 3.000 $100.000 $100.000 $200.000 $350.000 $175.000
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
EA 15.000 $500.000 $800.000 $2,500.000 $5,000.000 $2,400.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 10.000 $600.000 $800.000 $2,500.000 $5,000.000 $2,000.000
REPLACE CABLE (TL-3)
LF 500.000 $3.000 $5.000 $6.000 $10.000 $3.000
REPLACE CABLE (TL-4)
LF 200.000 $4.000 $5.000 $6.000 $10.000 $2.000
CHECK / RE-TENSION CABLE
EA 30.000 $350.000 $1,500.000 $300.000 $500.000 $300.000
POST AND CABLE FENCE (REMOVAL)
LF 250.000 $3.000 $4.000 $10.000 $10.000 $2.000
POST AND CABLE FENCE (REMV CONC ANCHOR)
EA 5.000 $1,250.000 $100.000 $500.000 $60.000 $32.500
POST AND CABLE FENCE (NEW INSTALLATION)
LF 2,500.000 $10.000 $2.000 $30.000 $8.000 $12.000
POST AND CABLE FENCE (NEW CONC ANCHOR)
EA 100.000 $50.000 $25.000 $100.000 $20.000 $1.000
POST AND CABLE FENCE(REMV / REPL POSTS)
EA 100.000 $50.000 $50.000 $100.000 $50.000 $50.000
POST AND CABLE FENCE(RMV/REPL CNC ANCH)
EA 5.000 $100.000 $100.000 $100.000 $50.000 $105.000
POST AND CABLE FENCE (REMV/ REPL CABLE)
LF 5,000.000 $4.000 $2.000 $6.000 $3.000 $5.000
REPAIR (REACT)
EA 15.000 $1,000.000 $100.000 $500.000 $100.000 $2,000.000
REPAIR (QUAD) (W) (BAY)
EA 5.000 $1,500.000 $100.000 $100.000 $100.000 $1,250.000
REPAIR (QUAD - ELITE) NARROW (BAY)
EA 15.000 $2,700.000 $100.000 $100.000 $100.000 $2,000.000
REPAIR (QUAD - ELITE) WIDE (BAY)
EA 25.000 $1,000.000 $100.000 $100.000 $100.000 $2,000.000
REMOVE AND REPLACE (SMTC) (N)
EA 5.000 $20,000.000 $1,000.000 $3,000.000 $10,000.000 $17,500.000
REMOVE AND REPLACE (SMTC) (W)
EA 5.000 $23,000.000 $1,000.000 $3,000.000 $10,000.000 $30,000.000
REPAIR (TRACC) (BAY)
EA 17.000 $900.000 $100.000 $100.000 $100.000 $1,750.000
REPAIR (SMTC) (N)
LF 60.000 $165.000 $5.000 $100.000 $350.000 $225.000
REPAIR (SMTC) (W)
LF 60.000 $250.000 $5.000 $100.000 $350.000 $225.000
REMOVE AND REPLACE (QUADGUARD)(MASH)(N)
EA 5.000 $15,000.000 $1,000.000 $6,000.000 $10,000.000 $20,000.000
REPAIR (QUADGUARD)(MASH)(N)(BAY)
EA 20.000 $900.000 $100.000 $100.000 $100.000 $750.000
REMOVE AND REPLACE (TAU)(MASH)(N)
EA 5.000 $15,000.000 $1,000.000 $5,000.000 $10,000.000 $19,500.000
REPAIR (TAU)(MASH)(N)(BAY)
EA 20.000 $900.000 $100.000 $100.000 $100.000 $1,000.000
REM/REPLACE CURB GUIDANCE SYSTEM
EA 75.000 $140.000 $100.000 $100.000 $20.000 $100.000
REM/REPLACE DELINEATOR POST ASSEMBLY
EA 100.000 $100.000 $50.000 $50.000 $80.000 $60.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 60.000 $200.000 $50.000 $200.000 $60.000 $200.000
TMA (STATIONARY)
DAY 130.000 $200.000 $200.000 $200.000 $3,000.000 $1,750.000
Totals: $3,259,000.000 $2,474,835.000 $2,894,010.000 $3,406,946.000 $3,954,818.315