DALLAS SS0408 (6378-82-001)

Items: 19

County: DALLAS
Length: N/A
Highway: SS0408
District: DALLAS
Control Number: 6378-82-001
DBE Goal: N/A
Project: RMC - 637882001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $692,319.20
Date: 07/01/2021 (4 years ago)
Contract Number: N/A
Type: FLEXIBLE PAVEMENT STRUCTURE REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (3)
E
Engineer's Estimate
$692,319.20
$649,951.95
Over/Under Est: -6.12% -$42,367.25
Over/Under Est: 4.61% $31,921.10
Amt Left: 11.43% $74,288.35
Over/Under Est: 73.25% $507,145.85
Amt Left: 84.55% $549,513.10
Delta: -65.62% -$475,224.75

Bid Items & Bid Tabulations

19 Total 0 of 19
DALLAS  |  SS0408  |  DALLAS  |  6378-82-001  |  07/01/2021  |  $692,319.20  |  RMC - 637882001  |  FLEXIBLE PAVMT STRUCT REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FOUTSCO PAVING COMPANY, LLC
PEACHTREE CONSTRUCTION, LTD.
TEXAS MATERIALS GROUP, INC.
FLEXIBLE PAV STR REPAIR 12"-TYPICAL A
SY 1,012.000 $120.000 $85.000 $86.000 $94.750
PLANE ASPH CONC PAV(0" TO 3")
SY 27,343.000 $2.000 $1.000 $2.250 $1.150
MOBILIZATION (CALLOUT)
EA 7.000 $7,500.000 $100.000 $5,500.000 $16,500.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 750.000 $1.750 $2.000 $2.500 $0.700
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,014.000 $1.200 $1.000 $2.150 $1.150
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 600.000 $2.650 $3.500 $7.500 $4.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 3,545.000 $0.500 $1.000 $1.550 $1.150
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 1,950.000 $1.000 $1.000 $1.750 $1.150
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 3,914.000 $0.500 $1.000 $1.550 $1.150
REFL PAV MRKR TY II-C-R
EA 110.000 $5.000 $4.000 $5.500 $4.600
PAV SURF PREP FOR MRK (4")
LF 7,459.000 $0.100 $0.050 $0.550 $0.050
PAV SURF PREP FOR MRK (6")
LF 1,950.000 $0.200 $0.100 $0.650 $0.100
PAV SURF PREP FOR MRK (8")
LF 1,014.000 $0.250 $0.500 $0.950 $0.550
PAV SURF PREP FOR MRK (12")
LF 600.000 $0.600 $1.000 $1.250 $1.150
SP MIXES SP-C PG70-22
TON 4,513.000 $95.000 $112.000 $107.250 $198.500
TACK COAT
GAL 2,840.000 $4.000 $5.000 $2.500 $3.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 40.000 $75.000 $1.000 $65.000 $220.000
TMA (STATIONARY)
DAY 50.000 $150.000 $1.000 $200.000 $275.000
TMA (MOBILE OPERATION)
DAY 5.000 $200.000 $1.000 $450.000 $2,500.000
Totals: $692,319.200 $649,951.950 $724,240.300 $1,199,465.050