Job Info for 6373-00-001

County: DALLAS Highway: IH0035E Date: 02/05/2021 (3 years ago) Engineer's Estimate: $5,537,544 Control Number: 6373-00-001
Project: RMC - 637300001 District: DALLAS Time: 730 CALENDAR DAYS Type: PERF BASED OPS & MAINT OF MANANGED LANES
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13
Plans

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $5,537,543.90
ROY JORGENSEN ASSOCIATES, INC.   $3,650,661.75 1
-34.07% | -$1,886,882.15
DBI SERVICES, LLC   $4,822,547.50 2
-12.91% | -$714,996.40
32.1% | $1,171,885.75

Bid Items

Items: 105, 0 filtered
DALLAS IH0035E  |  DALLAS  |  6373-00-001  |  02/05/2021  |  $5,537,544  |  RMC - 637300001  |  PERF BASED OPS & MAINT OF MANANGED LANES  |  730 CALENDAR DAYS
Item code Description Unit Quantity Engineer's Estimate ROY JORGENSEN ASSOCIATES, INC. DBI SERVICES, LLC
346 6002 STONE-MTRX-ASPH SMA-C SAC-A PG76-22 TON 200.000 $125.000 $85.000 $150.000
351 6009 FLEXIBLE PAVEMENT STRUCTURE REPAIR(14") SY 150.000 $190.000 $85.000 $100.000
354 6004 PLAN & TEXT ASPH CONC PAV(0" TO 4") SY 7,040.000 $5.000 $1.000 $7.000
361 6008 FULL - DEPTH REPAIR CRCP (14") SY 150.000 $325.000 $210.000 $300.000
429 6007 CONC STR REPAIR (VERTICAL & OVERHEAD) SF 600.000 $180.000 $175.000 $130.000
429 6009 CONC STR REPAIR (STANDARD) SF 150.000 $200.000 $63.000 $100.000
438 6001 CLEANING AND SEALING EXISTING JOINTS LF 555.000 $13.500 $5.000 $20.000
438 6009 CLEANING EXISTING JOINTS LF 1,500.000 $4.000 $10.000 $15.000
500 6001 MOBILIZATION LS 1.000 $300,000.000 $350,000.000 $400,000.000
512 6001 PORT CTB (FUR & INST)(SGL SLOPE)(TY 1) LF 225.000 $70.000 $140.000 $90.000
512 6025 PORT CTB (MOVE)(SGL SLP)(TY 1) LF 113.000 $20.000 $20.000 $30.000
512 6049 PORT CTB (REMOVE)(SGL SLP)(TY 1) LF 225.000 $40.000 $9.000 $50.000
512 6087 PORT CTB (ALIGNING) LF 675.000 $20.000 $25.000 $20.000
533 6003 RUMBLE STRIPS (SHOULDER) ASPHALT LF 1,000.000 $0.500 $2.000 $5.000
533 6005 RUMBLE STRIPS (SHOULDER) CONCRETE LF 1,000.000 $2.000 $2.000 $5.000
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 150.000 $30.000 $19.000 $30.000
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 2.000 $1,600.000 $1,000.000 $1,500.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 1.000 $5,000.000 $2,250.000 $4,000.000
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 1.000 $180.000 $150.000 $1,000.000
545 6005 CRASH CUSH ATTEN (REMOVE) EA 16.000 $5,000.000 $1,000.000 $1,000.000
545 6007 CRASH CUSH ATTEN (INSTL)(L)(N)(TL3) EA 16.000 $15,000.000 $23,000.000 $17,500.000
545 6012 CRASH CUSH ATTEN (INSTL)(R)(N)(TL2) EA 2.000 $17,000.000 $1,000.000 $10,000.000
636 6007 REPLACE EXISTING ALUMINUM SIGNS(TY A) SF 75.000 $25.000 $26.000 $30.000
636 6009 REPLACE EXISTING ALUMINUM SIGNS(TY O) SF 188.000 $40.000 $30.000 $30.000
644 6012 IN SM RD SN SUP&AM TY10BWG(1)SB(T) EA 4.000 $700.000 $550.000 $700.000
644 6042 IN SM RD SN SUP&AM TYS80(1)SB(T) EA 2.000 $1,000.000 $800.000 $700.000
644 6056 IN SM RD SN SUP&AM TYTWT(1)UA(P) EA 2.000 $600.000 $400.000 $700.000
644 6064 IN BRIDGE MNT CLEARANCE SGN ASSM(TY N) EA 2.000 $3,000.000 $750.000 $1,500.000
644 6066 IN SM RD SN SUP&AM (RAIL MOUNT) EA 29.000 $400.000 $390.000 $1,000.000
658 6013 INSTL DEL ASSM (D-SW)SZ (BRF)CTB EA 750.000 $6.000 $12.000 $20.000
658 6061 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2 EA 50.000 $24.000 $16.000 $30.000
658 6064 INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2 EA 50.000 $20.000 $16.000 $30.000
666 6040 REFL PAV MRK TY I (W)12"(SLD)(060MIL) LF 2,250.000 $3.090 $3.780 $5.000
666 6077 REFL PAV MRK TY I (W)(WORD)(090MIL) EA 15.000 $150.000 $265.000 $100.000
666 6080 REFL PAV MRK TY I(W)(ENTR GORE)(090MIL) EA 15.000 $640.000 $730.000 $500.000
666 6083 REFL PAV MRK TY I(W)(EXIT GORE)(090MIL) EA 15.000 $800.000 $835.000 $750.000
666 6161 RE PV MRK TY I(BLACK)6"(SHADOW)(090MIL) LF 24,670.000 $0.500 $0.800 $1.500
666 6224 PAVEMENT SEALER 4" LF 5,625.000 $0.460 $0.130 $0.500
666 6225 PAVEMENT SEALER 6" LF 22,500.000 $0.460 $0.190 $0.500
666 6228 PAVEMENT SEALER 12" LF 2,250.000 $2.000 $0.480 $1.000
666 6239 PAVEMENT SEALER (ENTR GORE) EA 11.000 $250.000 $265.000 $200.000
666 6240 PAVEMENT SEALER (EXIT GORE) EA 11.000 $350.000 $370.000 $250.000
666 6283 REF PROF PAV MRK TY I(W)4"(SLD)(090MIL) LF 26,100.000 $0.650 $0.650 $0.500
666 6301 RE PM W/RET REQ TY I (W)4"(SLD)(060MIL) LF 150,000.000 $0.400 $0.270 $0.250
666 6304 RE PM W/RET REQ TY I (W)6"(BRK)(060MIL) LF 16,875.000 $0.600 $0.550 $0.500
666 6348 REFL PAV MRK TY I (W)12"(DOT)(060MIL) LF 2,250.000 $2.500 $3.250 $3.000
672 6008 REFL PAV MRKR TY I-R EA 158.000 $10.300 $16.000 $5.000
672 6038 REFL PAV MRKR TY II-C-C EA 1,950.000 $5.150 $6.500 $3.000
677 6001 ELIM EXT PAV MRK & MRKS (4") LF 15,000.000 $0.460 $0.750 $0.500
677 6002 ELIM EXT PAV MRK & MRKS (6") LF 16,875.000 $0.520 $0.580 $0.500
677 6005 ELIM EXT PAV MRK & MRKS (12") LF 2,250.000 $1.240 $1.050 $1.000
677 6013 ELIM EXT PAV MRK & MRKS (ENTR GORE) EA 16.000 $350.000 $400.000 $300.000
677 6014 ELIM EXT PAV MRK & MRKS (EXIT GORE) EA 16.000 $550.000 $500.000 $500.000
678 6001 PAV SURF PREP FOR MRK (4") LF 5,625.000 $0.700 $0.120 $0.500
678 6002 PAV SURF PREP FOR MRK (6") LF 16,875.000 $0.700 $0.170 $0.500
678 6006 PAV SURF PREP FOR MRK (12") LF 2,250.000 $1.390 $0.480 $1.000
678 6017 PAV SURF PREP FOR MRK (ENTR GORE) EA 11.000 $150.000 $130.000 $200.000
678 6018 PAV SURF PREP FOR MRK (EXIT GORE) EA 11.000 $250.000 $210.000 $300.000
700 6001 POTHOLE REPAIR (STANDARD) SY 75.000 $105.000 $72.000 $100.000
700 6005 POTHOLE REPAIR (SAW - CUT) SY 250.000 $80.000 $60.000 $100.000
712 6009 JT / CRCK SEAL (HOT - POURED RUBBER) LF 1,500.000 $4.000 $6.000 $5.000
713 6005 CRACK CLEANING AND SEALING (JCP) LF 750.000 $8.000 $5.000 $10.000
720 6001 SPALLING REPAIR (HYDRAULIC CEMENT) CF 150.000 $250.000 $50.000 $100.000
720 6002 SPALLING REPAIR (POLYMERIC) (FLEXIBLE) GAL 1,500.000 $55.000 $30.000 $50.000
721 6002 FIBER REINFORCED POLYMER PATCHING MATLS LB 500.000 $8.000 $2.000 $10.000
731 6007 PAVEMENT EDGES, STRUCTURES & FIXTURES MI 60.000 $275.000 $200.000 $100.000
740 6002 GRAFFITI REMOVAL (PAINTING) SF 150.000 $5.000 $7.500 $10.000
770 6001 REPAIR RAIL ELEMENT (W - BEAM) LF 375.000 $50.000 $9.000 $20.000
770 6002 REPAIR RAIL ELEMENT (THRIE - BEAM) LF 75.000 $35.000 $12.000 $20.000
770 6003 REP RAIL ELMNT(THRIE-BM TRANS TO W -BM) LF 18.000 $25.000 $17.000 $150.000
770 6008 REALIGN EXISTING RAIL LF 375.000 $10.000 $4.000 $5.000
770 6010 REM / REPL TIMBER/STL POST W/O CONC FND EA 450.000 $55.000 $25.000 $40.000
770 6011 REM / REPL TIMBER / STL POST W/CONC FND EA 30.000 $40.000 $40.000 $55.000
770 6016 REPAIR STEEL POST WITH BASE PLATE EA 19.000 $130.000 $50.000 $200.000
770 6017 REALIGN POSTS EA 19.000 $25.000 $5.000 $200.000
770 6019 REMOVE & REPLACE BLOCKOUT EA 188.000 $20.000 $12.000 $20.000
770 6021 REPLACE SINGLE GDRAIL TERMINAL RAIL LF 2,775.000 $25.000 $15.000 $20.000
770 6022 REPLACE SINGLE GDRAIL TERMINAL POST EA 278.000 $55.000 $40.000 $40.000
770 6024 REPLACE TERMINAL ANCHOR POSTS EA 1.000 $40.000 $45.000 $1,000.000
770 6027 REMOVE GDRAIL END TRT / REPL WITH SGT EA 3.000 $3,100.000 $1,750.000 $2,000.000
770 6028 REPL SINGLE GDRAIL TERM IMPACT HEAD EA 8.000 $1,250.000 $1,000.000 $1,500.000
770 6029 REM & RESET SGT IMPACT HEAD EA 30.000 $110.000 $150.000 $500.000
770 6030 REPLACE SGT CABLE ASSEMBLY EA 62.000 $45.000 $70.000 $100.000
770 6031 REPLACE SGT CABLE ANCHOR EA 31.000 $40.000 $68.000 $100.000
770 6032 REPLACE SGT STRUT EA 38.000 $38.000 $57.000 $100.000
770 6033 REPLACE SGT OBJECT MARKER EA 11.000 $30.000 $20.000 $150.000
770 6055 REPAIR SINGLE GUARDRAIL TERMINAL EA 7.500 $1,000.000 $500.000 $500.000
774 6044 REMOVE AND REPLACE (SMTC) (N) EA 15.000 $25,000.000 $23,000.000 $17,500.000
774 6046 REMOVE AND REPLACE (SMTC) (W) EA 4.000 $29,700.000 $5,000.000 $15,000.000
774 6068 REPAIR (SMTC) (N) LF 2,322.000 $200.000 $125.000 $100.000
774 6103 REACT DECAL EA 38.000 $425.000 $1.000 $400.000
774 6104 REACT CABLE 350 (9 BAY) EA 8.000 $1,600.000 $1.000 $1,000.000
774 6105 CABLE RELEASE POST EA 8.000 $650.000 $1.000 $750.000
774 6106 ANCHOR POST EA 75.000 $880.000 $1.000 $550.000
774 6107 REACT 350 CABLE HOLDERS EA 180.000 $400.000 $1.000 $350.000
774 6108 FAST TRACK CENTER PANELS EA 8.000 $1,300.000 $1.000 $1,500.000
774 6109 REPAIR (NARROW REACT 350) EA 8.000 $500.000 $1.000 $3,500.000
774 6110 REPAIR (QUAD - ELITE) WIDE EA 8.000 $500.000 $300.000 $750.000
774 6111 REPAIR (SMTC)(W) (BAY) EA 180.000 $100.000 $1.000 $500.000
774 6112 REPAIR (SMTC) (W) LF 200.000 $185.000 $1.000 $150.000
5047 6001 REM/REPLACE CURB GUIDANCE SYSTEM EA 50.000 $200.000 $100.000 $200.000
5047 6005 REM/REPLACE DELINEATOR POST ASSEMBLY EA 3,000.000 $50.000 $34.000 $40.000
6001 6001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 113.000 $200.000 $1.000 $100.000
6185 6002 TMA (STATIONARY) DAY 250.000 $500.000 $1.000 $100.000
7119 6001 PERF BASED OPER & MAINT MANAGED LANES MO 24.000 $100,000.000 $60,000.000 $90,000.000
Totals: $5,537,543.90 $3,650,661.75 $4,822,547.50