Show Job Controls
Bid Cobra

DALLAS IH0030 (6359-94-001)

Items: 71

County: DALLAS
Length: N/A
Highway: IH0030
District: DALLAS
Control Number: 6359-94-001
DBE Goal: N/A
Project: RMC - 635994001
Guaranty: N/A
Time: 730 CALENDAR DAYS
Engineer's Estimate: $531,000.65
Date: 08/06/2020 (5 years ago)
Contract Number: N/A
Type: SIGN REPLACEMENT AND REFURBISHING
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$531,000.65
$514,950.50
Over/Under Est: -3.02% -$16,050.15
Over/Under Est: 1.55% $8,220.94
Amt Left: 4.71% $24,271.09
Over/Under Est: 23.64% $125,544.16
Amt Left: 27.5% $141,594.31
Delta: -21.76% -$117,323.22
Over/Under Est: 51.11% $271,374.85
Amt Left: 55.82% $287,425.00
Delta: -22.21% -$145,830.69

Bid Items & Bid Tabulations

71 Total 0 of 71
DALLAS  |  IH0030  |  DALLAS  |  6359-94-001  |  08/06/2020  |  $531,000.65  |  RMC - 635994001  |  SIGN REPL AND REFURBISHING  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SYNERGY SIGNS & SERVICES LLC
WG ENGINEERING & CONSTRUCTION, LLC
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC.
SELECT MAINTENANCE, L.L.C.
REMOVING CONC (FOUNDATIONS)
CY 6.000 $400.000 $7,500.000 $825.000 $1,360.000 $150.000
DRILL SHAFT (SIGN MTS) (24 IN)
LF 30.000 $200.000 $165.000 $138.000 $197.950 $250.000
DRILL SHAFT (SIGN MTS) (30 IN)
LF 30.000 $240.000 $225.000 $230.000 $298.750 $300.000
DRILL SHAFT (SIGN MTS) (36 IN)
LF 15.000 $285.000 $350.000 $239.000 $371.850 $400.000
DRILL SHAFT (SIGN MTS) (42 IN)
LF 16.000 $400.000 $375.000 $400.000 $398.830 $500.000
DRILL SHAFT (SIGN MTS) (48 IN)
LF 16.000 $450.000 $455.000 $449.000 $398.830 $550.000
DRILL SHAFT (SIGN MTS) (54 IN)
LF 51.000 $485.000 $510.000 $483.000 $557.700 $550.000
RIPRAP (MOW STRIP)(4 IN)
CY 24.000 $500.000 $450.000 $420.000 $920.000 $600.000
MOBILIZATION (CALLOUT)
EA 6.000 $5,625.000 $2,500.000 $2,550.000 $10,840.000 $1,000.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 8.000 $20.000 $20.000 $13.500 $5.440 $20.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 10.000 $2.000 $10.000 $7.950 $5.440 $2.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 40.000 $50.000 $250.000 $111.000 $188.400 $45.000
PORT CTB (DES SOURCE)(SGL SLP)(TY 3)
LF 50.000 $280.000 $25.000 $198.000 $102.000 $70.000
MTL W-BEAM GD FEN (TIM POST)
LF 360.000 $26.000 $26.000 $26.000 $26.400 $20.000
TERMINAL ANCHOR SECTION
EA 4.000 $200.000 $1,200.000 $49.250 $1,573.500 $1,245.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 1.000 $2,800.000 $1,800.000 $2,725.000 $2,430.250 $1,995.000
MTL W-BEAM GD FEN ADJUSTMENT
LF 25.000 $24.000 $25.000 $22.500 $30.790 $25.000
MTL THRIE-BEAM GD FEN ADJUSTMENT
LF 18.000 $25.000 $25.000 $40.000 $59.540 $50.000
TERMINAL ANCHOR SECTION ADJUSTMENT
EA 1.000 $400.000 $500.000 $83.000 $251.000 $100.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,300.000 $1,200.000 $1,175.000 $1,510.250 $1,195.000
REMOVE METAL BEAM GUARD FENCE
LF 187.500 $4.000 $5.000 $1.300 $7.790 $5.000
REMOVE TERMINAL ANCHOR SECTION
EA 1.000 $400.000 $350.000 $1,815.000 $538.500 $350.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 1.000 $153.000 $350.000 $148.000 $538.500 $350.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,700.000 $2,850.000 $3,755.000 $3,126.000 $2,600.000
GUARDRAIL END TREATMENT (REMOVE)
EA 1.000 $500.000 $350.000 $552.000 $538.500 $350.000
ALUMINUM SIGNS (TY A)
SF 40.000 $25.000 $22.000 $25.000 $29.960 $30.000
ALUMINUM SIGNS (TY G)
SF 180.000 $25.000 $24.000 $26.000 $31.160 $29.000
ALUMINUM SIGNS (TY O)
SF 596.000 $25.000 $22.000 $25.000 $32.540 $43.000
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 100.000 $25.000 $22.000 $24.500 $32.000 $38.000
REPLACE EXISTING ALUMINUM SIGNS(TY G)
SF 329.000 $25.000 $24.000 $25.000 $33.200 $35.000
REPLACE EXISTING ALUMINUM SIGNS(TY O)
SF 700.000 $26.000 $22.000 $25.000 $32.540 $50.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 4.000 $700.000 $570.000 $726.000 $760.970 $400.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 2.000 $700.000 $650.000 $775.420 $822.240 $500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 4.000 $600.000 $655.000 $756.000 $801.920 $460.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
EA 1.000 $655.000 $710.000 $798.000 $854.300 $560.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $900.000 $750.000 $814.000 $868.290 $500.000
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 1.000 $650.000 $635.000 $765.000 $805.430 $400.000
IN SM RD SN SUP&AM TY10BWG(1)SB(P-BM)
EA 1.000 $700.000 $695.000 $808.000 $866.700 $400.000
IN SM RD SN SUP&AM TY10BWG(2)SA(P-EXAL)
EA 1.000 $1,500.000 $1,250.000 $1,253.000 $1,262.870 $1,200.000
IN SM RD SN SUP&AM TY10BWG(2)SB(P-EXAL)
EA 1.000 $1,500.000 $1,350.000 $1,322.000 $1,351.780 $1,200.000
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 1.000 $600.000 $975.000 $1,048.000 $1,195.790 $600.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 2.000 $630.000 $975.000 $1,048.000 $1,106.910 $590.000
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
EA 1.000 $600.000 $975.000 $1,058.000 $1,226.030 $620.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 2.000 $770.000 $975.000 $1,149.000 $1,173.820 $620.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 2.000 $835.000 $1,100.000 $1,156.000 $1,229.510 $650.000
IN SM RD SN SUP&AM TYS80(1)SB(U-BM)
EA 1.000 $835.000 $1,100.000 $1,136.000 $1,273.970 $700.000
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
EA 1.000 $1,650.000 $1,650.000 $1,722.000 $1,873.930 $2,000.000
IN SM RD SN SUP&AM TYS80(2)SB(P-EXAL)
EA 1.000 $1,650.000 $1,650.000 $1,590.000 $1,962.840 $2,000.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 1.000 $2,341.000 $2,000.000 $1,941.000 $2,428.000 $2,000.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
EA 1.000 $23,050.000 $2,000.000 $1,960.000 $2,512.000 $2,500.000
REMOVE SM RD SN SUP&AM
EA 20.000 $75.000 $75.000 $750.000 $272.000 $300.000
REMOVE BRDG MNT CLEARANCE SIGN ASSM
EA 2.000 $470.000 $750.000 $1,250.000 $1,360.000 $75.000
INSTALL LRSS (STRUCT STEEL)
LB 800.000 $4.750 $5.250 $5.800 $16.480 $10.000
REMOVE LRSA
EA 4.000 $800.000 $1,500.000 $965.000 $1,360.000 $3,000.000
INS OH SN SUP(15 FT BAL TEE)
EA 1.000 $14,870.650 $13,500.000 $14,120.000 $13,412.000 $20,000.000
INS OH SN SUP(30 FT CANT)
EA 1.000 $21,766.000 $17,500.000 $19,262.000 $17,576.000 $40,000.000
INS OH SN SUP(40 FT CANT)
EA 1.000 $25,795.000 $22,000.000 $22,897.000 $22,856.000 $46,000.000
INS OH SN SUP(70 FT BRDG)
EA 1.000 $30,250.000 $30,500.000 $37,765.000 $34,738.000 $60,000.000
INS OH SN SUP(80 FT BRDG)
EA 1.000 $33,250.000 $33,500.000 $39,931.000 $37,860.000 $65,000.000
INS OH SN SUP(90 FT BRDG)
EA 1.000 $39,750.000 $39,000.000 $43,565.000 $43,983.000 $70,000.000
INS OH SN SUP(100 FT BRDG)
EA 1.000 $43,950.000 $44,000.000 $48,096.000 $49,847.000 $75,000.000
INS OH SN SUP(110 FT BRDG)
EA 1.000 $49,500.000 $45,000.000 $49,661.000 $52,975.000 $85,000.000
REMOVE OVERHD SIGN SUP
EA 1.000 $7,500.000 $7,500.000 $4,908.000 $7,060.000 $20,000.000
REMOVE SIGN WALKWAY
EA 2.000 $1,500.000 $1,000.000 $1,578.000 $3,660.000 $2,000.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 10.000 $22.000 $20.000 $19.500 $139.600 $25.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 10.000 $22.000 $20.000 $19.000 $139.600 $24.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 10.000 $20.000 $20.000 $19.000 $139.600 $32.000
SHIFT OVERHEAD SIGN PANELS
EA 1.000 $750.000 $750.000 $745.000 $3,660.000 $10,000.000
REMOVE OVERHEAD SIGN PANELS
EA 3.000 $500.000 $500.000 $1,975.000 $3,660.000 $8,000.000
INSTALL ST SUPPLY GRND MNTD SIGN PANEL
SF 304.000 $15.000 $20.000 $55.000 $34.000 $100.000
TMA (STATIONARY)
DAY 10.000 $240.000 $150.000 $395.000 $1,561.250 $250.000
Totals: $531,000.650 $514,950.500 $539,221.590 $656,544.815 $802,375.500