Show Job Controls
Bid Cobra

DALLAS IH0030 (6340-63-001)

Items: 54

County: DALLAS
Length: N/A
Highway: IH0030
District: DALLAS
Control Number: 6340-63-001
DBE Goal: N/A
Project: RMC - 634063001
Guaranty: N/A
Time: 730 CALENDAR DAYS
Engineer's Estimate: $612,907.00
Date: 05/07/2019 (7 years ago)
Contract Number: N/A
Type: SIGN REPLACEMENT AND REFURBISHING
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$612,907.00
$683,185.00
Over/Under Est: 11.47% $70,278.00
Over/Under Est: 19.25% $117,983.00
Amt Left: 6.98% $47,705.00

Bid Items & Bid Tabulations

54 Total 0 of 54
DALLAS  |  IH0030  |  DALLAS  |  6340-63-001  |  05/07/2019  |  $612,907.00  |  RMC - 634063001  |  SIGN REPL AND REFURBISHING  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SYNERGY SIGNS & SERVICES LLC
CREATIVE DESIGN CONCEPTS, LLC
REMOVING CONC (FOUNDATIONS)
CY 2.000 $296.250 $1,000.000 $150.000
DRILL SHAFT (SIGN MTS) (24 IN)
LF 35.000 $166.000 $145.000 $180.000
DRILL SHAFT (SIGN MTS) (30 IN)
LF 35.000 $228.000 $225.000 $190.000
DRILL SHAFT (SIGN MTS) (36 IN)
LF 12.000 $229.500 $235.000 $200.000
DRILL SHAFT (SIGN MTS) (42 IN)
LF 12.000 $338.000 $400.000 $500.000
DRILL SHAFT (SIGN MTS) (48 IN)
LF 12.000 $395.750 $450.000 $600.000
DRILL SHAFT (SIGN MTS) (54 IN)
LF 12.000 $487.000 $485.000 $700.000
RIPRAP (MOW STRIP)(4 IN)
CY 5.000 $422.500 $550.000 $450.000
MOBILIZATION (CALLOUT)
EA 15.000 $3,500.000 $5,000.000 $1,500.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 10.000 $5.400 $10.000 $2.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 10.000 $0.960 $10.000 $2.000
MTL W-BEAM GD FEN (TIM POST)
LF 400.000 $21.500 $24.000 $35.000
TERMINAL ANCHOR SECTION
EA 1.000 $145.000 $1,500.000 $2,000.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $1,176.500 $1,650.000 $2,500.000
MTL W-BEAM GD FEN ADJUSTMENT
LF 50.000 $7.750 $20.000 $50.000
MTL THRIE-BEAM GD FEN ADJUSTMENT
LF 36.000 $5.000 $25.000 $50.000
TERMINAL ANCHOR SECTION ADJUSTMENT
EA 1.000 $81.000 $400.000 $500.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,032.250 $1,250.000 $2,000.000
REMOVE METAL BEAM GUARD FENCE
LF 200.000 $2.500 $4.000 $5.000
REMOVE TERMINAL ANCHOR SECTION
EA 1.000 $135.500 $250.000 $250.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 1.000 $66.500 $150.000 $250.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $2,489.000 $2,850.000 $3,600.000
GUARDRAIL END TREATMENT (REMOVE)
EA 1.000 $196.000 $250.000 $500.000
ALUMINUM SIGNS (TY A)
SF 50.000 $18.500 $24.000 $25.000
ALUMINUM SIGNS (TY G)
SF 200.000 $25.500 $24.000 $25.000
ALUMINUM SIGNS (TY O)
SF 1,000.000 $28.750 $24.000 $26.000
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 100.000 $25.500 $24.000 $26.000
REPLACE EXISTING ALUMINUM SIGNS(TY G)
SF 300.000 $23.000 $24.000 $26.000
REPLACE EXISTING ALUMINUM SIGNS(TY O)
SF 1,000.000 $28.750 $24.000 $26.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 12.000 $501.750 $590.000 $1,400.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
EA 1.000 $835.870 $655.000 $1,700.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 10.000 $578.750 $630.000 $1,700.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 5.000 $600.500 $770.000 $1,700.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 5.000 $1,227.750 $835.000 $1,700.000
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
EA 2.000 $1,490.000 $1,650.000 $1,700.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 1.000 $1,481.000 $2,000.000 $1,700.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
EA 1.000 $1,487.500 $2,000.000 $1,700.000
REMOVE SM RD SN SUP&AM
EA 20.000 $274.000 $75.000 $250.000
INSTALL LRSS (STRUCT STEEL)
LB 800.000 $5.500 $4.750 $10.000
REMOVE LRSA
EA 5.000 $704.000 $800.000 $500.000
INS OH SN SUP(15 FT BAL TEE)
EA 1.000 $9,476.650 $14,875.000 $19,200.000
INS OH SN SUP(20 FT CANT)
EA 1.000 $10,731.300 $17,737.000 $21,000.000
INS OH SN SUP(30 FT CANT)
EA 3.000 $20,200.000 $21,766.000 $25,100.000
INS OH SN SUP(40 FT CANT)
EA 5.000 $20,775.000 $25,795.000 $29,700.000
INS OH SN SUP(70 FT BRDG)
EA 1.000 $32,620.010 $30,250.000 $35,000.000
INS OH SN SUP(80 FT BRDG)
EA 1.000 $34,325.000 $33,250.000 $39,000.000
INS OH SN SUP(90 FT BRDG)
EA 1.000 $32,991.770 $39,750.000 $43,000.000
INS OH SN SUP(100 FT BRDG)
EA 1.000 $37,024.250 $43,950.000 $45,000.000
INS OH SN SUP(110 FT BRDG)
EA 1.000 $43,274.050 $49,500.000 $48,500.000
REMOVE OVERHD SIGN SUP
EA 1.000 $5,953.500 $7,500.000 $4,000.000
REMOVE SIGN WALKWAY
EA 1.000 $3,150.000 $1,500.000 $1,650.000
SHIFT OVERHEAD SIGN PANELS
EA 2.000 $1,680.000 $750.000 $500.000
REMOVE OVERHEAD SIGN PANELS
EA 5.000 $1,260.000 $500.000 $250.000
INST LRG GRND MNT AND OVRHD SIGN(STATE)
SF 500.000 $20.000 $15.000 $12.000
Totals: $612,907.000 $683,185.000 $730,890.000