|
|
REMOVING CONC (FOUNDATIONS)
|
CY
|
2.000
|
$296.250
|
$1,000.000
|
$150.000
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
35.000
|
$166.000
|
$145.000
|
$180.000
|
|
|
DRILL SHAFT (SIGN MTS) (30 IN)
|
LF
|
35.000
|
$228.000
|
$225.000
|
$190.000
|
|
|
DRILL SHAFT (SIGN MTS) (36 IN)
|
LF
|
12.000
|
$229.500
|
$235.000
|
$200.000
|
|
|
DRILL SHAFT (SIGN MTS) (42 IN)
|
LF
|
12.000
|
$338.000
|
$400.000
|
$500.000
|
|
|
DRILL SHAFT (SIGN MTS) (48 IN)
|
LF
|
12.000
|
$395.750
|
$450.000
|
$600.000
|
|
|
DRILL SHAFT (SIGN MTS) (54 IN)
|
LF
|
12.000
|
$487.000
|
$485.000
|
$700.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
5.000
|
$422.500
|
$550.000
|
$450.000
|
|
|
MOBILIZATION (CALLOUT)
|
EA
|
15.000
|
$3,500.000
|
$5,000.000
|
$1,500.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
10.000
|
$5.400
|
$10.000
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
10.000
|
$0.960
|
$10.000
|
$2.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
400.000
|
$21.500
|
$24.000
|
$35.000
|
|
|
TERMINAL ANCHOR SECTION
|
EA
|
1.000
|
$145.000
|
$1,500.000
|
$2,000.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$1,176.500
|
$1,650.000
|
$2,500.000
|
|
|
MTL W-BEAM GD FEN ADJUSTMENT
|
LF
|
50.000
|
$7.750
|
$20.000
|
$50.000
|
|
|
MTL THRIE-BEAM GD FEN ADJUSTMENT
|
LF
|
36.000
|
$5.000
|
$25.000
|
$50.000
|
|
|
TERMINAL ANCHOR SECTION ADJUSTMENT
|
EA
|
1.000
|
$81.000
|
$400.000
|
$500.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$1,032.250
|
$1,250.000
|
$2,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
200.000
|
$2.500
|
$4.000
|
$5.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
1.000
|
$135.500
|
$250.000
|
$250.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
1.000
|
$66.500
|
$150.000
|
$250.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$2,489.000
|
$2,850.000
|
$3,600.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
1.000
|
$196.000
|
$250.000
|
$500.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
50.000
|
$18.500
|
$24.000
|
$25.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
200.000
|
$25.500
|
$24.000
|
$25.000
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
1,000.000
|
$28.750
|
$24.000
|
$26.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY A)
|
SF
|
100.000
|
$25.500
|
$24.000
|
$26.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY G)
|
SF
|
300.000
|
$23.000
|
$24.000
|
$26.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY O)
|
SF
|
1,000.000
|
$28.750
|
$24.000
|
$26.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
12.000
|
$501.750
|
$590.000
|
$1,400.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
|
EA
|
1.000
|
$835.870
|
$655.000
|
$1,700.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
10.000
|
$578.750
|
$630.000
|
$1,700.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
5.000
|
$600.500
|
$770.000
|
$1,700.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
5.000
|
$1,227.750
|
$835.000
|
$1,700.000
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
|
EA
|
2.000
|
$1,490.000
|
$1,650.000
|
$1,700.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
1.000
|
$1,481.000
|
$2,000.000
|
$1,700.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
|
EA
|
1.000
|
$1,487.500
|
$2,000.000
|
$1,700.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
20.000
|
$274.000
|
$75.000
|
$250.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
800.000
|
$5.500
|
$4.750
|
$10.000
|
|
|
REMOVE LRSA
|
EA
|
5.000
|
$704.000
|
$800.000
|
$500.000
|
|
|
INS OH SN SUP(15 FT BAL TEE)
|
EA
|
1.000
|
$9,476.650
|
$14,875.000
|
$19,200.000
|
|
|
INS OH SN SUP(20 FT CANT)
|
EA
|
1.000
|
$10,731.300
|
$17,737.000
|
$21,000.000
|
|
|
INS OH SN SUP(30 FT CANT)
|
EA
|
3.000
|
$20,200.000
|
$21,766.000
|
$25,100.000
|
|
|
INS OH SN SUP(40 FT CANT)
|
EA
|
5.000
|
$20,775.000
|
$25,795.000
|
$29,700.000
|
|
|
INS OH SN SUP(70 FT BRDG)
|
EA
|
1.000
|
$32,620.010
|
$30,250.000
|
$35,000.000
|
|
|
INS OH SN SUP(80 FT BRDG)
|
EA
|
1.000
|
$34,325.000
|
$33,250.000
|
$39,000.000
|
|
|
INS OH SN SUP(90 FT BRDG)
|
EA
|
1.000
|
$32,991.770
|
$39,750.000
|
$43,000.000
|
|
|
INS OH SN SUP(100 FT BRDG)
|
EA
|
1.000
|
$37,024.250
|
$43,950.000
|
$45,000.000
|
|
|
INS OH SN SUP(110 FT BRDG)
|
EA
|
1.000
|
$43,274.050
|
$49,500.000
|
$48,500.000
|
|
|
REMOVE OVERHD SIGN SUP
|
EA
|
1.000
|
$5,953.500
|
$7,500.000
|
$4,000.000
|
|
|
REMOVE SIGN WALKWAY
|
EA
|
1.000
|
$3,150.000
|
$1,500.000
|
$1,650.000
|
|
|
SHIFT OVERHEAD SIGN PANELS
|
EA
|
2.000
|
$1,680.000
|
$750.000
|
$500.000
|
|
|
REMOVE OVERHEAD SIGN PANELS
|
EA
|
5.000
|
$1,260.000
|
$500.000
|
$250.000
|
|
|
INST LRG GRND MNT AND OVRHD SIGN(STATE)
|
SF
|
500.000
|
$20.000
|
$15.000
|
$12.000
|
|
Totals: |
$612,907.000
|
$683,185.000
|
$730,890.000
|