Show Job Controls
Bid Cobra

DALLAS IH 20 (2374-04-090)

Items: 59

County: DALLAS
Length: N/A
Highway: IH 20
District: DALLAS
Control Number: 2374-04-090
DBE Goal: N/A
Project: F 2023(261)
Guaranty: N/A
Time: 150 WORKING DAYS
Engineer's Estimate: $4,817,194.24
Date: 12/02/2022 (3 years ago)
Contract Number: N/A
Type: REHABILITATE BRIDGE
Mail/Deliver Bids To: N/A
AMANDA MOSER
NATHAN PETTER
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$4,817,194.24
$4,350,740.31
Over/Under Est: -9.68% -$466,453.93
Over/Under Est: -6.92% -$333,320.37
Amt Left: 3.06% $133,133.56
Over/Under Est: 6.79% $326,882.46
Amt Left: 18.23% $793,336.39
Delta: -14.72% -$660,202.83

Bid Items & Bid Tabulations

59 Total 0 of 59
DALLAS  |  IH 20  |  DALLAS  |  2374-04-090  |  12/02/2022  |  $4,817,194.24  |  F 2023(261)  |  REHAB BRIDGE  |  150 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
GIBSON & ASSOCIATES, INC.
RAGLE CONSTRUCTION, INC.
SILVER CREEK CONSTRUCTION, INC.
COMPOST MANUF TOPSOIL (4")
SY 300.000 $1.210 $2.200 $2.000 $2.000
BLOCK SODDING
SY 300.000 $4.500 $7.700 $10.000 $7.000
VEGETATIVE WATERING
MG 45.000 $3.190 $220.000 $75.000 $200.000
STRUCT EXCAV
CY 85.000 $10.000 $102.000 $35.000 $220.000
CEM STABIL BKFL
CY 85.000 $209.470 $100.000 $115.000 $220.000
CUT & RESTORING PAV
SY 8.000 $104.500 $1,180.000 $500.000 $500.000
FLOWABLE BACKFILL
CY 2.000 $275.000 $1,000.000 $750.000 $500.000
APPROACH SLAB (HPC)
CY 23.100 $633.230 $1,450.000 $850.000 $2,000.000
PENETRATING CONCRETE SURFACE TREATMENT
SY 17,683.000 $9.000 $6.550 $4.500 $7.250
CONC STR REPAIR(RAPID DECK REP(PRT DPT)
SF 59.000 $550.000 $162.000 $110.000 $500.000
CONC STR REPR(RAPID DECK REP(FULL DPT))
SF 1,872.000 $226.550 $158.000 $125.000 $200.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 268.100 $253.000 $154.000 $100.000 $300.000
CONC STR REPR(REMOV AND REPL BACKWALL)
CY 3.700 $2,800.000 $8,800.000 $4,500.000 $25,000.000
RIPRAP (CONC)(4 IN)
CY 1.000 $459.040 $10,000.000 $1,500.000 $500.000
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 94.000 $180.420 $400.000 $190.000 $300.000
RIPRAP (CONC)(FLUME)
CY 1.000 $828.880 $10,000.000 $1,800.000 $500.000
CLEANING AND SEALING JOINTS (CL 7)
LF 810.000 $24.150 $35.200 $40.000 $30.000
CLEANING EXISTING JOINTS
LF 400.000 $23.890 $16.000 $12.000 $26.000
CONCRETE OVERLAY (2.5 IN)
SY 9,984.000 $82.000 $69.750 $100.000 $100.000
SPOT CLEAN & PAINT EXT STR(SPL PRT SYS)
LS 1.000 $132,000.000 $376,000.000 $250,000.000 $341,000.000
MILLING CONCRETE SLAB (1 IN)
SY 9,984.000 $4.040 $6.000 $6.500 $12.000
HYDRO-DEMOLITION (1 1/2 IN)
SY 9,984.000 $70.380 $77.000 $80.000 $65.000
RAISING EXIST STRUCT
LS 1.000 $407,000.000 $138,000.000 $90,000.000 $140,000.000
REMOVE STR (CONC)
EA 2.000 $6,451.610 $7,250.000 $1,300.000 $250.000
REMOV STR (APPROACH SLAB)
EA 1.000 $5,500.000 $25,200.000 $3,000.000 $18,000.000
REMOV STR (DRAINAGE FLUME)
EA 1.000 $201.250 $7,250.000 $880.000 $200.000
ADJUST STL SHOES
EA 1.000 $5,000.000 $17,500.000 $15,000.000 $20,000.000
MOBILIZATION
LS 1.000 $450,000.000 $196,000.000 $440,000.000 $514,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $40,000.000 $31,800.000 $40,000.000 $30,000.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 400.000 $5.190 $4.680 $4.250 $4.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 400.000 $1.730 $1.100 $1.000 $1.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 4,024.000 $0.640 $2.200 $0.380 $0.380
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 794.000 $0.720 $2.200 $0.440 $0.440
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 4,024.000 $0.320 $2.200 $0.380 $0.380
PAVEMENT SEALER 4"
LF 14,588.000 $0.290 $0.280 $0.400 $0.400
PAVEMENT SEALER 6"
LF 1,622.000 $0.250 $0.550 $0.500 $0.500
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 7,294.000 $0.530 $0.940 $0.650 $0.650
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 1,622.000 $1.000 $1.380 $0.770 $0.770
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 7,294.000 $0.550 $0.880 $0.650 $0.650
REFL PAV MRKR TY II-C-R
EA 161.000 $6.100 $5.500 $3.770 $3.770
ELIM EXT PAV MRK & MRKS (4")
LF 16,210.000 $0.850 $0.720 $0.490 $0.490
PAV SURF PREP FOR MRK (4")
LF 14,588.000 $0.250 $0.220 $0.250 $0.250
PAV SURF PREP FOR MRK (6")
LF 1,622.000 $0.250 $0.440 $0.370 $0.370
DEBRIS REMOVAL (SPOT DEBRIS)
MI 2.000 $75.000 $13,500.000 $4,611.210 $1,500.000
REPAIR (ALUMINUM RAIL)
LF 10.000 $150.000 $350.000 $400.000 $250.000
CONCRETE RAIL REPAIR (IN-KIND)
LF 420.000 $76.160 $86.000 $120.000 $125.000
CONCRETE RAIL REPAIR (TYPE T502MOD)
LF 20.000 $1,000.000 $1,500.000 $500.000 $125.000
CNC CRACK REPAIR (DISCRETE)(INJECT)
LF 2,258.000 $154.000 $56.930 $35.000 $90.000
REP STL BRIDGE MEMBER (BEAM)
EA 1.000 $9,500.000 $26,500.000 $7,500.000 $26,500.000
BRIDGE JOINT REPAIR (CONCRETE)
LF 80.000 $550.000 $440.000 $350.000 $650.000
BRIDGE JOINT REPAIR (ARMOR)
LF 90.000 $586.500 $765.000 $350.000 $600.000
BRIDGE JOINT REPLACEMENT (ARMOR)
LF 30.000 $615.250 $385.000 $475.000 $950.000
CARBON FIBER REINF POLYMER STRENGTHNING
SF 6,475.000 $62.100 $90.000 $50.000 $97.000
REPLACE ELASTOMERIC BEARING PADS
EA 18.000 $3,418.720 $750.000 $15,000.000 $800.000
COMPACTION GROUTING
CF 3,000.000 $35.000 $6.600 $40.000 $10.000
DRILLED HOLES
LF 600.000 $75.000 $130.900 $60.000 $125.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $15,170.840 $13,600.000 $20,000.000 $10,000.000
TMA (STATIONARY)
DAY 150.000 $160.640 $325.000 $350.000 $500.000
TMA (MOBILE OPERATION)
HR 12.000 $36.500 $500.000 $150.000 $100.000
Totals: $4,817,194.543 $4,350,740.310 $4,483,873.870 $5,144,076.700