County: DALLAS Highway: IH 20 Date: 06/01/2023 (1 year ago) Engineer's Estimate: $17,263,457 Control Number: 2374-03-098
Project: C 2374-3-98 District: DALLAS Time: 219 WORKING DAYS Type: REHABILITATE EXISTING ROADWAY
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $17,263,456.82
FNH CONSTRUCTION, LLC   $20,222,498.00 1
17.14% | $2,959,041.18
TEXAS MATERIALS GROUP, INC.   $20,304,430.57 2
17.62% | $3,040,973.75
0.41% | $81,932.57
AUSTIN BRIDGE & ROAD SERVICES, LP   $21,218,109.20 3
22.91% | $3,954,652.38
4.92% | $995,611.20
4.50% | $913,678.63
Subcontractor Percentage Amount
GIBSON & ASSOCIATES, INC. 4.81% $972,702.15
DIIBS SPECIALISTS, LLC 3.88% $784,632.92
DUSTROL, INC. 3.55% $717,898.68
LINEAR TRAFFIC MARKINGS LLC 1.53% $309,404.22
MACIAS SPECIALTY CONTRACTING LLC 0.44% $88,978.99
AWP SAFETY 0.13% $26,289.25
PENHALL COMPANY 0.12% $24,267.00
ACT SAW CUTTING & REMOVAL 0.12% $24,267.00
RELIABLE CONCRETE CUTTING LLC 0.12% $24,267.00
KING GEORGE TRAFFIC SOLUTIONS LLC 0.09% $18,200.25
C. GREEN SCAPING, L.P. 0.06% $12,133.50
Total: 14.85% $3,003,040.96

Bid Items

Items: 73, 0 filtered
DALLAS IH 20  |  DALLAS  |  2374-03-098  |  06/01/2023  |  $17,263,457  |  C 2374-3-98  |  REHAB EXIST ROADWAY  |  219 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate FNH CONSTRUCTION, LLC TEXAS MATERIALS GROUP, INC. AUSTIN BRIDGE & ROAD SERVICES, LP
104 6009 REMOVING CONC (RIPRAP) SY 503.000 $25.000 $50.000 $42.000 $25.000
161 6017 COMPOST MANUF TOPSOIL (4") SY 1,550.000 $2.300 $10.000 $2.700 $4.180
162 6002 BLOCK SODDING SY 1,550.000 $7.000 $10.000 $6.850 $7.390
168 6001 VEGETATIVE WATERING MG 231.000 $13.750 $50.000 $45.000 $65.000
351 6005 FLEXIBLE PAVEMENT STRUCTURE REPAIR(9") SY 1,766.000 $85.000 $90.000 $91.000 $105.440
354 6067 PLAN ASPH CONC PAV(0" TO 2.25") SY 489,540.000 $2.000 $3.000 $2.900 $4.000
361 6003 FULL - DEPTH REPAIR CRCP (9") SY 3,134.000 $310.000 $300.000 $388.000 $351.000
401 6001 FLOWABLE BACKFILL CY 49.000 $400.000 $350.000 $525.000 $350.000
429 6007 CONC STR REPAIR (VERTICAL & OVERHEAD) SF 588.000 $190.000 $200.000 $182.000 $220.000
429 6009 CONC STR REPAIR (STANDARD) SF 10.000 $500.000 $500.000 $222.000 $254.000
432 6008 RIPRAP (CONC)(CL B)(RR8&RR9) CY 99.000 $624.000 $650.000 $740.000 $823.040
432 6033 RIPRAP (STONE PROTECTION)(18 IN) CY 84.000 $184.000 $185.000 $345.000 $338.800
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 1,113.000 $525.000 $500.000 $700.000 $904.180
438 6008 CLEANING AND SEALING JOINTS (CL 7) LF 1,511.000 $35.000 $90.000 $51.000 $30.000
451 6024 RETROFIT RAIL (TY SSTR) LF 2,218.000 $205.000 $125.000 $185.000 $347.500
454 6008 HEADER TYPE EXPANSION JOINT CF 460.000 $400.000 $650.000 $475.000 $429.590
454 6009 JOINT SEALANT LF 2,740.000 $40.000 $60.000 $39.000 $19.000
495 6001 RAISING EXIST STRUCT LS 1.000 $85,000.000 $35,000.000 $33,000.000 $108,675.000
500 6001 MOBILIZATION LS 1.000 $1,569,405.170 $1,800,000.000 $919,804.000 $2,121,810.920
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 13.000 $40,000.000 $8,500.000 $38,918.000 $75,000.000
506 6003 ROCK FILTER DAMS (INSTALL) (TY 3) LF 330.000 $69.000 $50.000 $69.000 $98.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 330.000 $16.000 $15.000 $21.000 $15.000
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 468.000 $35.000 $40.000 $37.570 $42.560
506 6024 CONSTRUCTION EXITS (REMOVE) SY 468.000 $14.000 $20.000 $16.000 $15.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 3,000.000 $5.500 $4.000 $3.750 $4.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 3,000.000 $2.100 $2.000 $0.950 $0.790
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 1,000.000 $5.780 $18.000 $4.200 $4.150
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 1,000.000 $2.100 $9.000 $1.600 $0.790
512 6094 PTB (FUR & INST)(STEEL) LF 500.000 $50.000 $100.000 $31.000 $28.860
512 6095 PTB (MOVE)(STEEL) LF 1,800.000 $25.000 $20.000 $26.000 $1.000
512 6096 PTB (REMOVE)(STEEL) LF 500.000 $12.000 $20.000 $26.000 $5.490
529 6036 CONCRETE CURB (SPECIAL) LF 200.000 $50.000 $80.000 $44.000 $100.000
533 6003 RUMBLE STRIPS (SHOULDER) ASPHALT LF 120,124.000 $0.200 $0.500 $0.160 $0.110
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 20,718.000 $22.000 $23.000 $22.000 $20.500
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 47.000 $1,925.000 $2,000.000 $2,200.000 $1,775.000
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 35.000 $1,320.000 $2,000.000 $1,100.000 $1,000.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 22,149.000 $2.000 $5.000 $2.200 $2.000
542 6002 REMOVE TERMINAL ANCHOR SECTION EA 16.000 $125.000 $850.000 $133.000 $125.000
542 6003 REMOVE DOWNSTREAM ANCHOR TERMINAL EA 19.000 $125.000 $850.000 $80.000 $75.000
542 6004 RM MTL BM GD FENCE TRANS (THRIE-BEAM) EA 7.000 $245.000 $850.000 $215.000 $200.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 39.000 $3,000.000 $3,250.000 $2,900.000 $2,775.000
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 41.000 $225.000 $850.000 $210.000 $200.000
545 6003 CRASH CUSH ATTEN (MOVE & RESET) EA 3.000 $2,100.000 $3,500.000 $1,050.000 $25.000
545 6005 CRASH CUSH ATTEN (REMOVE) EA 2.000 $1,300.000 $2,500.000 $777.000 $953.650
545 6010 CRASH CUSH ATTEN (INSTL)(L)(W)(TL3) EA 1.000 $45,000.000 $50,000.000 $38,000.000 $27,960.070
545 6019 CRASH CUSH ATTEN (INSTL)(S)(N)(TL3) EA 1.000 $9,300.000 $21,000.000 $8,000.000 $7,597.230
658 6013 INSTL DEL ASSM (D-SW)SZ (BRF)CTB EA 100.000 $20.000 $100.000 $21.000 $20.000
658 6026 INSTL DEL ASSM (D-SY)SZ (BRF)CTB EA 100.000 $20.000 $100.000 $21.000 $20.000
658 6061 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2 EA 452.000 $30.000 $100.000 $26.500 $25.000
662 6109 WK ZN PAV MRK SHT TERM (TAB)TY W EA 26,892.000 $1.200 $3.000 $1.050 $1.250
666 6081 REFL PAV MRK TY I(W)(ENTR GORE)(100MIL) EA 12.000 $850.000 $1,250.000 $600.000 $550.000
666 6084 REFL PAV MRK TY I(W)(EXIT GORE)(100MIL) EA 13.000 $1,500.000 $2,000.000 $1,000.000 $925.000
666 6162 RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL) LF 52,020.000 $0.850 $1.250 $0.660 $0.630
666 6225 PAVEMENT SEALER 6" LF 31,760.000 $0.200 $0.500 $0.260 $0.240
666 6306 RE PM W/RET REQ TY I (W)6"(BRK)(100MIL) LF 52,020.000 $0.650 $1.000 $0.640 $0.610
666 6309 RE PM W/RET REQ TY I (W)6"(SLD)(100MIL) LF 69,286.000 $0.750 $1.000 $0.640 $0.610
666 6321 RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL) LF 69,286.000 $0.750 $1.000 $0.640 $0.610
668 6115 PREFAB PAV MRK TY C (MULTI) (SHIELD) EA 9.000 $6,000.000 $5,000.000 $2,200.000 $2,065.000
672 6010 REFL PAV MRKR TY II-C-R EA 2,598.000 $5.400 $6.000 $4.000 $3.700
677 6001 ELIM EXT PAV MRK & MRKS (4") LF 18,080.000 $0.660 $1.000 $0.620 $0.590
677 6002 ELIM EXT PAV MRK & MRKS (6") LF 13,680.000 $0.730 $1.000 $0.730 $0.690
678 6002 PAV SURF PREP FOR MRK (6") LF 31,760.000 $0.230 $1.000 $0.140 $0.130
721 6002 FIBER REINFORCED POLYMER PATCHING MATLS LB 14,558.000 $4.500 $12.000 $13.500 $13.000
780 6004 CONC CRCK REPR(DISCRETE)(ROUT AND SEAL) LF 35.000 $98.000 $1,000.000 $80.000 $120.000
785 6004 BRIDGE JOINT REPAIR (ARMOR) LF 354.000 $500.000 $1,000.000 $475.000 $421.000
785 6010 BRIDGE JOINT REPLACEMENT (ARMOR) LF 82.000 $615.000 $1,000.000 $800.000 $567.000
3002 6001 MEMBRANE UNDERSEAL GAL 97,908.000 $4.000 $5.000 $3.850 $3.800
3080 6001 STONE-MTRX-ASPH SMA-C SAC-A PG76-22 TON 66,639.000 $135.000 $160.000 $178.000 $155.000
4171 6001 INSTALL BRIDGE IDENTIFICATION NUMBERS EA 2.000 $410.000 $1,500.000 $310.000 $2,116.960
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 2.000 $20,000.000 $16,500.000 $14,000.000 $16,250.000
6185 6002 TMA (STATIONARY) DAY 438.000 $350.000 $250.000 $370.000 $160.000
6185 6005 TMA (MOBILE OPERATION) DAY 219.000 $350.000 $350.000 $0.010 $5.120
7000 6002 REML & DISPL DRIFTWOOD & DEBRIS LS 1.000 $15,000.000 $85,000.000 $24,500.000 $35,000.000
Totals: $17,263,456.82 $20,222,498.00 $20,304,430.57 $21,218,109.20