Job Info for 2374-02-164

County: DALLAS Highway: IH 635 Date: 08/02/2023 (1 year ago) Engineer's Estimate: $3,792,217 Control Number: 2374-02-164
Project: STP 2B23(111)HES District: DALLAS Time: 125 WORKING DAYS Type: HAZARD ELIMINATION & SAFETY
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $3,792,217.17
WEBBER, LLC   $4,193,300.00 1
10.58% | $401,082.83
FNH CONSTRUCTION, LLC   $4,780,610.00 2
26.06% | $988,392.83
14.01% | $587,310.00
RAGLE CONSTRUCTION, INC.   $4,929,687.95 3
29.99% | $1,137,470.78
17.56% | $736,387.95
3.12% | $149,077.95
SCR CIVIL CONSTRUCTION, LLC   $5,694,674.80 4
50.17% | $1,902,457.63
35.8% | $1,501,374.80
15.52% | $764,986.85
Subcontractor Percentage Amount
ROY LEE WALKER 4.06% $170,247.98
USA SWPPP INSPECTIONS, INC.DBA USA EROSION 2.94% $123,283.02
ADRIAN CONTRACTING, INC 1.27% $53,254.91
MTAM CORPORATION 1.27% $53,254.91
BEAN ELECTRICAL, LLC 0.48% $20,127.84
SUPERIOR TRAFFIC CONTROL, LLC 0.37% $15,515.21
SOUTHERN CROSS CONTRACTORS, LLC 0.22% $9,225.26
ACT SAW CUTTING & REMOVAL 0.04% $1,677.32
Total: 10.65% $446,586.45

Bid Items

Items: 29, 0 filtered
DALLAS IH 635  |  DALLAS  |  2374-02-164  |  08/02/2023  |  $3,792,217  |  STP 2B23(111)HES  |  HAZARD ELIM & SAFETY  |  125 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate WEBBER, LLC FNH CONSTRUCTION, LLC RAGLE CONSTRUCTION, INC. SCR CIVIL CONSTRUCTION, LLC
134 6004 BACKFILL (TY A OR B) STA 214.000 $200.000 $400.000 $450.000 $438.000 $165.000
161 6017 COMPOST MANUF TOPSOIL (4") SY 11,847.000 $1.500 $1.000 $10.000 $1.110 $9.000
162 6002 BLOCK SODDING SY 11,847.000 $4.950 $5.000 $10.000 $8.300 $4.700
168 6001 VEGETATIVE WATERING MG 1,763.000 $4.000 $20.000 $30.000 $48.000 $45.000
432 6002 RIPRAP (CONC)(5 IN) CY 988.000 $550.000 $685.000 $650.000 $652.000 $789.000
500 6001 MOBILIZATION LS 1.000 $344,747.020 $410,000.000 $400,000.000 $490,000.000 $467,900.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 8.000 $45,000.000 $50,000.000 $8,500.000 $50,000.000 $5,600.000
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 468.000 $31.000 $28.500 $40.000 $37.710 $43.150
506 6024 CONSTRUCTION EXITS (REMOVE) SY 468.000 $12.000 $10.000 $20.000 $8.000 $9.150
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 840.000 $3.500 $4.000 $4.000 $4.000 $4.600
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 840.000 $0.850 $1.000 $2.000 $1.000 $1.150
506 6040 BIODEG EROSN CONT LOGS (INSTL) (8") LF 450.000 $5.000 $7.000 $18.000 $4.000 $4.600
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 450.000 $2.000 $1.000 $9.000 $1.000 $1.150
512 6005 PORT CTB (FUR & INST)(F-SHAPE)(TY 1) LF 3,420.000 $33.000 $32.000 $85.000 $26.000 $110.000
512 6029 PORT CTB (MOVE)(F-SHAPE)(TY 1) LF 18,720.000 $6.500 $11.000 $20.000 $10.000 $16.000
512 6053 PORT CTB (REMOVE)(F-SHAPE)(TY 1) LF 3,420.000 $12.000 $9.300 $20.000 $10.000 $28.000
514 6001 PERM CTB (SGL SLOPE) (TY 1) (42 ) LF 21,324.000 $85.000 $74.000 $100.000 $112.600 $131.250
542 6001 REMOVE METAL BEAM GUARD FENCE LF 1,520.000 $4.000 $7.000 $3.000 $3.800 $81.000
542 6003 REMOVE DOWNSTREAM ANCHOR TERMINAL EA 6.000 $120.000 $300.000 $500.000 $200.000 $500.000
543 6021 REMOVE CABLE BARRIER LF 21,100.000 $5.000 $16.000 $3.000 $4.500 $9.750
543 6022 REMOVE CABLE BARRIER TERMINAL SECTION EA 6.000 $500.000 $900.000 $1,000.000 $433.000 $900.000
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 6.000 $350.000 $350.000 $850.000 $433.000 $1,000.000
545 6003 CRASH CUSH ATTEN (MOVE & RESET) EA 9.000 $1,510.000 $3,500.000 $6,500.000 $400.000 $3,500.000
545 6005 CRASH CUSH ATTEN (REMOVE) EA 2.000 $1,300.000 $2,730.000 $2,500.000 $652.000 $2,000.000
545 6019 CRASH CUSH ATTEN (INSTL)(S)(N)(TL3) EA 2.000 $9,300.000 $10,280.000 $21,000.000 $12,000.000 $10,000.000
658 6027 INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI) EA 214.000 $15.500 $22.000 $100.000 $20.000 $25.000
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 2.000 $8,000.000 $19,737.500 $16,500.000 $30,000.000 $19,000.000
6185 6002 TMA (STATIONARY) DAY 250.000 $350.000 $205.000 $250.000 $301.000 $275.000
6185 6005 TMA (MOBILE OPERATION) DAY 125.000 $350.000 $425.000 $550.000 $727.000 $100.000
Totals: $3,792,217.17 $4,193,300.00 $4,780,610.00 $4,929,687.95 $5,694,674.80