DALLAS IH 635 (2374-02-156)

Items: 72

County: DALLAS
Length: N/A
Highway: IH 635
District: DALLAS
Control Number: 2374-02-156
DBE Goal: N/A
Project: F 2021(732)
Guaranty: N/A
Time: 0 X
Engineer's Estimate: $12,749,623.67
Date: 07/02/2021 (4 years ago)
Contract Number: N/A
Type: PLANING, CFDR, OV, & PV MRKGS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (3)
E
Engineer's Estimate
$12,749,623.67
$12,024,221.60
Over/Under Est: -5.69% -$725,402.07
Over/Under Est: -5.66% -$721,419.57
Amt Left: 0.03% $3,982.50
$12,529,274.38
Over/Under Est: -1.73% -$220,349.29
Amt Left: 4.2% $505,052.78
Delta: -4.17% -$501,070.28

Bid Items & Bid Tabulations

72 Total 0 of 72
DALLAS  |  IH 635  |  DALLAS  |  2374-02-156  |  07/02/2021  |  $12,749,623.67  |  F 2021(732)  |  PLANING, CFDR, OV, & PV MRKGS  |  0 X
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
AUSTIN BRIDGE & ROAD SERVICES, LP
JAGOE-PUBLIC COMPANY
BLOCK SODDING
SY 4,697.000 $4.000 $3.500 $9.170 $3.500
VEGETATIVE WATERING
MG 699.000 $5.000 $0.010 $43.370 $31.000
STONE-MTRX-ASPH SMA-C SAC-A PG76-22
TON 62,146.000 $110.000 $111.000 $106.000 $115.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 1,959.000 $78.000 $88.000 $105.000 $100.000
PLAN ASPH CONC PAV(0" TO 2.25")
SY 502,187.000 $2.000 $0.840 $1.200 $1.500
FULL - DEPTH REPAIR CRCP (7"-8") HES
SY 3,580.000 $200.000 $175.000 $175.000 $190.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 269.000 $145.000 $180.000 $165.000 $220.000
RIPRAP (MOW STRIP)(4 IN)
CY 1,064.000 $500.000 $585.000 $516.750 $620.000
CLEANING AND SEALING EXIST JOINTS(CL3)
LF 174.000 $30.000 $17.000 $31.000 $40.000
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 1,260.000 $45.000 $39.000 $29.500 $34.000
CLEAN & PAINT EXIST STR (SYSTEM II)
LS 1.000 $45,000.000 $5,250.000 $3,700.000 $2,600.000
RETROFIT RAIL (TY SSTR)
LF 918.000 $200.000 $230.000 $191.000 $170.000
MOBILIZATION
LS 1.000 $1,090,511.240 $667,512.000 $1,118,900.000 $500,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 13.000 $15,000.000 $21,000.000 $15,000.000 $11,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,000.000 $2.000 $2.250 $6.470 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,000.000 $0.400 $0.750 $1.100 $1.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 1,000.000 $5.250 $6.000 $9.930 $8.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,000.000 $0.800 $1.550 $1.100 $2.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 720.000 $15.000 $42.000 $10.260 $64.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 270.000 $7.000 $15.000 $10.000 $14.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 720.000 $3.000 $20.000 $12.000 $19.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 143,992.000 $0.180 $0.150 $0.110 $0.100
MTL W-BEAM GD FEN (TIM POST)
LF 17,150.000 $21.100 $21.500 $21.500 $23.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 39.000 $1,800.000 $2,050.000 $1,600.000 $1,700.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 40.000 $1,000.000 $1,150.000 $1,100.000 $1,200.000
REMOVE METAL BEAM GUARD FENCE
LF 17,080.000 $2.030 $2.350 $2.000 $2.150
REMOVE TERMINAL ANCHOR SECTION
EA 30.000 $180.000 $130.000 $250.000 $260.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 10.000 $125.000 $130.000 $250.000 $260.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 8.000 $266.000 $260.000 $200.000 $210.000
GUARDRAIL END TREATMENT (INSTALL)
EA 44.000 $2,600.000 $2,600.000 $2,600.000 $2,800.000
GUARDRAIL END TREATMENT (REMOVE)
EA 44.000 $300.000 $260.000 $250.000 $260.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 1.000 $1,300.000 $2,050.000 $1,500.000 $790.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $700.000 $1,550.000 $850.000 $790.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $7,500.000 $8,250.000 $9,950.000 $15,000.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 383.000 $27.000 $21.000 $31.740 $17.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 63.000 $27.000 $21.000 $31.740 $17.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 63,396.000 $0.370 $0.290 $0.260 $0.300
WK ZN PAV MRK NON-REMOV (W)4"(LNDP)
LF 777.000 $1.000 $1.050 $0.240 $1.050
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 2,457.000 $0.190 $0.290 $0.240 $0.300
WK ZN PAV MRK NON-REMOV (W)(ENTR GORE)
EA 11.000 $250.000 $520.000 $410.000 $530.000
WK ZN PAV MRK NON-REMOV (W)(EXIT GORE)
EA 11.000 $250.000 $775.000 $410.000 $790.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 330.000 $0.620 $6.350 $3.000 $5.300
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 14,463.000 $1.150 $1.000 $0.400 $1.500
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
LF 692.000 $2.570 $3.650 $3.000 $3.750
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 952.000 $3.300 $3.650 $3.000 $3.750
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 5.000 $140.000 $145.000 $160.000 $150.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 5.000 $140.000 $165.000 $160.000 $170.000
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
EA 19.000 $600.000 $725.000 $850.000 $740.000
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
EA 18.000 $550.000 $1,200.000 $950.000 $1,200.000
PAVEMENT SEALER 4"
LF 17,324.000 $0.120 $0.210 $0.240 $0.210
PAVEMENT SEALER 6"
LF 8,282.000 $0.150 $0.360 $0.280 $0.400
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 71,996.000 $0.270 $0.410 $0.340 $0.400
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 55,523.000 $0.450 $0.570 $0.400 $0.600
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 71,996.000 $0.280 $0.420 $0.340 $0.420
REFL PAV MRKR TY II-C-R
EA 2,776.000 $3.320 $3.850 $3.450 $4.000
ELIM EXT PAV MRK & MRKS (4")
LF 17,324.000 $0.350 $0.540 $0.450 $0.500
ELIM EXT PAV MRK & MRKS (6")
LF 8,282.000 $0.410 $0.740 $0.650 $0.700
PAV SURF PREP FOR MRK (4")
LF 17,324.000 $0.050 $0.052 $0.050 $0.050
PAV SURF PREP FOR MRK (6")
LF 8,282.000 $0.030 $0.104 $0.050 $0.110
PAV SURF PREP FOR MRK (12")
LF 914.000 $0.150 $1.040 $0.750 $1.050
CONCRETE RAIL REPAIR (MISC)
LF 44.000 $700.000 $625.000 $580.000 $400.000
CNC CRACK REPAIR (DISCRETE)(INJECT)
LF 91.000 $120.000 $88.000 $135.000 $130.000
REP STL BRIDGE MEMBER (DIAPHRAGM)
EA 1.000 $5,000.000 $2,600.000 $1,675.000 $2,600.000
REP STL BRDG MEMB (ANCHOR BOLT NUT)
EA 1.000 $2,000.000 $775.000 $500.000 $530.000
REP STL BRDG MEMB (WELD REPAIR)
EA 1.000 $3,000.000 $7,750.000 $4,000.000 $2,600.000
BRIDGE JOINT REPAIR (HEADER)
LF 40.000 $220.000 $315.000 $250.000 $280.000
BRIDGE JOINT REPAIR (PARTIAL DEPTH)
LF 160.000 $90.000 $260.000 $265.000 $300.000
NO. OF WORKING DAYS
$/D 2,600.000 $215.000 $194.000 $162.000 $215.000
MEMBRANE UNDERSEAL
GAL 100,437.000 $2.800 $3.050 $3.000 $3.250
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $12,200.000 $19,500.000 $35,000.000
TMA (STATIONARY)
DAY 255.000 $172.000 $285.000 $126.520 $125.000
TMA (MOBILE OPERATION)
DAY 75.000 $100.000 $0.010 $10.000 $125.000
Totals: $12,749,623.670 $12,024,221.616 $12,028,204.100 $12,529,274.380