DALLAS FM 1382 (1047-03-076)

Items: 41

County: DALLAS
Length: N/A
Highway: FM 1382
District: DALLAS
Control Number: 1047-03-076
DBE Goal: N/A
Project: STP 2023(439)HES
Guaranty: N/A
Time: 97 WORKING DAYS
Engineer's Estimate: $3,762,219.32
Date: 02/02/2023 (3 years ago)
Contract Number: N/A
Type: DRAINAGE IMPROVEMENTS & INSTALL MEDIAN BARRIER
Mail/Deliver Bids To: N/A
AMANDA MOSER
NATHAN PETTER
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$3,762,219.32
$4,000,858.20
Over/Under Est: 6.34% $238,638.88
Over/Under Est: 16.35% $615,053.36
Amt Left: 9.41% $376,414.48
Over/Under Est: 36.04% $1,355,893.88
Amt Left: 27.93% $1,117,255.00
Delta: -16.92% -$740,840.52

Bid Items & Bid Tabulations

41 Total 0 of 41
DALLAS  |  FM 1382  |  DALLAS  |  1047-03-076  |  02/02/2023  |  $3,762,219.32  |  STP 2023(439)HES  |  DRAINAGE IMPRVS & INSTL MEDIAN BARRI...  |  97 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FNH CONSTRUCTION, LLC
RAGLE CONSTRUCTION, INC.
ED BELL CONSTRUCTION COMPANY
EXCAVATION (ROADWAY)
CY 4,943.000 $30.000 $20.000 $53.000 $52.500
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 109.000 $65.000 $50.000 $45.250 $105.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 540.000 $40.000 $50.000 $40.400 $42.000
COMPOST MANUF TOPSOIL (4")
SY 37,007.000 $1.500 $5.000 $1.210 $1.000
BLOCK SODDING
SY 5,258.000 $4.750 $8.000 $8.960 $5.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 31,749.000 $0.250 $0.500 $0.290 $0.300
DRILL SEED (TEMP)(WARM OR COOL)
SY 37,007.000 $0.200 $0.500 $0.230 $0.300
VEGETATIVE WATERING
MG 11,012.000 $8.000 $18.000 $1.000 $1.000
CEM STABIL BKFL
CY 84.000 $250.000 $350.000 $166.000 $250.000
FLOWABLE BACKFILL
CY 359.000 $250.000 $300.000 $250.000 $359.000
TRENCH EXCAVATION PROTECTION
LF 10.000 $10.000 $10.000 $5,000.000 $73.500
TEMPORARY SPL SHORING
SF 9,831.000 $30.000 $55.000 $90.000 $66.000
RIPRAP (STONE COMMON)(GROUT)(12 IN)
CY 37.000 $200.000 $180.000 $345.000 $420.000
RIPRAP (MOW STRIP)(4 IN)
CY 326.000 $500.000 $500.000 $1,000.000 $945.000
RC PIPE (CL IV)(18 IN)
LF 35.000 $75.000 $95.000 $290.000 $750.000
RC PIPE (CL V)(42 IN)
LF 1,049.000 $250.000 $400.000 $470.000 $850.000
INLET (COMPL)(POD)(SFG)(4FTX4FT)
EA 2.000 $8,000.000 $12,500.000 $6,550.000 $6,300.000
HEADWALL (CH - PW - 0) (DIA= 42 IN)
EA 3.000 $8,000.000 $12,000.000 $19,050.000 $21,000.000
HEADWALL (CH - PW - S) (DIA= 42 IN)
EA 1.000 $10,000.000 $12,000.000 $22,000.000 $21,000.000
JACK BOR OR TUN PIPE(42 IN)(RC)(CL V)
LF 830.000 $2,000.000 $1,200.000 $1,175.000 $1,785.000
MOBILIZATION
LS 1.000 $390,442.670 $400,000.000 $420,000.000 $464,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $10,000.000 $8,500.000 $24,079.000 $31,500.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 360.000 $52.000 $30.000 $62.000 $60.000
ROCK FILTER DAMS (REMOVE)
LF 360.000 $10.000 $15.000 $30.000 $10.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 1,229.000 $20.000 $40.000 $19.520 $10.000
CONSTRUCTION EXITS (REMOVE)
SY 1,229.000 $7.000 $20.000 $8.500 $5.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,625.000 $3.500 $4.000 $2.320 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,625.000 $1.500 $2.000 $1.000 $0.600
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 84.000 $1.000 $18.000 $7.800 $18.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 84.000 $1.000 $9.000 $2.000 $1.250
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 900.000 $40.000 $95.000 $61.500 $31.500
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 300.000 $20.000 $20.000 $7.500 $1.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 900.000 $25.000 $20.000 $10.500 $21.000
CABLE BARRIER SYSTEM (TL-4)
LF 8,792.000 $15.000 $21.600 $15.750 $25.200
CABLE BARRIER TERMINAL SECTION (TL-4)
EA 12.000 $3,500.000 $4,500.000 $2,529.450 $3,150.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 1.000 $2,000.000 $6,500.000 $1,374.490 $525.000
CRASH CUSH ATTEN (REMOVE)
EA 3.000 $800.000 $2,500.000 $807.840 $1,050.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 3.000 $8,500.000 $21,000.000 $10,642.090 $9,450.000
FULL - WIDTH MOWING
CYC 3.000 $4,000.000 $5,000.000 $5,500.000 $6,300.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $12,500.000 $10,825.000 $6,300.000
TMA (STATIONARY)
DAY 205.000 $150.000 $200.000 $335.000 $157.500
Totals: $3,762,219.320 $4,000,858.200 $4,377,272.680 $5,118,113.200