Show Job Controls
Bid Cobra

DALLAS W SPINE RD (0918-47-360)

Items: 50

County: DALLAS
Length: 0.0000 MILES
Highway: W SPINE RD
District: DALLAS
Control Number: 0918-47-360
DBE Goal: 0.0%
Project: C 918-47-360
Guaranty: $67,000.00
Time: 253 WORKING DAYS
Engineer's Estimate: $3,361,319.55
Date: 09/06/2024 (1 year ago)
Contract Number: 9243225
Type: RECONSTRUCT EXISTING ROADWAY
Project ID: A00178241
Project Description: RECONSTRUCTION OF THE EXISTING ROADS IN CAMP LOOPS
Mail/Deliver Bids To: N/A
NATHAN PETTER
DUNG NGUYEN
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$3,361,319.55
$3,669,509.03
Over/Under Est: 9.17% $308,189.48
$4,129,565.50
Over/Under Est: 22.86% $768,245.95
Amt Left: 12.54% $460,056.47
Over/Under Est: 25.9% $870,566.50
Amt Left: 15.33% $562,377.02
Delta: -2.48% -$102,320.55
$4,860,493.00
Over/Under Est: 44.6% $1,499,173.45
Amt Left: 32.46% $1,190,983.97
Delta: -14.85% -$628,606.95
Subcontractor Percentage Amount
J. H. ODEN CONTRACTING COMPANY 5.16% $190,491.17
PEACHTREE CONSTRUCTION, LTD. 4.97% $183,476.96
ODUM SERVICES, LLC 1.06% $39,131.91
ELITE STRIPING, LLC 0.88% $32,486.87
JR WEST TEXAS CONCRETE LLC 0.77% $28,426.01
TEX OP CONSTRUCTION, LP 0.69% $25,472.66
AWP SAFETY 0.28% $10,336.73
Total: 13.81% $509,822.31

Bid Items & Bid Tabulations

50 Total 0 of 50
DALLAS  |  W SPINE RD  |  DALLAS  |  0918-47-360  |  09/06/2024  |  $3,361,319.55  |  C 918-47-360  |  RECON EXIST ROADWAY  |  253 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
EUROVIA ATLANTIC COAST LLC
CK NEWBERRY, LLC
ED BELL CONSTRUCTION COMPANY
FNH CONSTRUCTION, LLC
PREPARING ROW
STA 118.800 $3,000.000 $500.000 $1,000.000 $2,100.000 $3,500.000
RMV (12"-30") TRT/UNTRT BASE & ASPH PAV
SY 18,346.000 $15.000 $6.800 $15.000 $15.250 $25.000
EXCAV (ROADWAY)
CY 16,475.000 $15.000 $32.000 $25.000 $12.500 $30.000
EMBANK (FNL)(DC)(TY C)
CY 6,793.000 $30.000 $51.000 $40.000 $47.250 $60.000
BACKFILL (TY A OR B)
STA 49.700 $140.000 $875.000 $325.000 $600.000 $450.000
COMPOST MANUF TOPSOIL (4")
SY 8,191.000 $3.000 $3.000 $4.000 $5.000 $10.000
DRILL SEED (PERM_RURAL_CLAY)
SY 8,191.000 $0.400 $0.300 $0.500 $0.400 $3.000
DRILL SEED (TEMP_WARM_COOL)
SY 8,191.000 $0.400 $0.300 $0.500 $0.390 $3.000
VEGETATIVE WATERING
TGL 2,440.000 $8.000 $1.000 $35.000 $3.000 $30.000
RDSIDE AMENITY (WHEEL STOP)
EA 61.000 $140.000 $210.000 $185.000 $200.000 $500.000
RDSIDE AMENITY (REMOV)
EA 61.000 $50.000 $140.000 $70.000 $60.000 $250.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 3,232.000 $70.000 $127.000 $120.000 $150.000 $85.000
FL BS (RDWY DEL)(TY A GR 1-2)(FNAL POS)
CY 3,232.000 $90.000 $97.000 $110.000 $115.000 $85.000
CEMENT
TON 99.000 $325.000 $215.000 $300.000 $525.000 $350.000
CEMENT TRT (NEW BASE)(6")
SY 19,374.000 $8.000 $9.000 $5.500 $10.000 $12.000
ASPH (CRS-2P)
GAL 3,040.000 $7.000 $7.250 $4.250 $9.750 $6.000
ASPH (RC-250)
GAL 1,705.000 $4.000 $10.750 $5.500 $12.500 $6.000
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
GAL 2,557.000 $4.600 $8.200 $4.000 $11.250 $6.000
AGGR (TY-B, GR-3)(SAC-B)
CY 117.000 $84.000 $618.000 $480.000 $900.000 $350.000
AGGR (TY-B, GR-5)(SAC-B)
CY 51.000 $150.000 $645.000 $300.000 $1,150.000 $350.000
SP MIXES SP-C SAC-B PG64-22
TON 3,616.000 $120.000 $167.000 $180.000 $171.000 $170.000
TACK COAT
GAL 1,495.000 $3.750 $3.000 $9.000 $7.880 $6.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 2,550.000 $85.000 $84.000 $105.000 $120.000 $85.000
PLANE ASPH CONC PAV(0" TO 2")
SY 13,349.000 $6.000 $4.000 $5.000 $4.000 $12.000
RIPRAP (MOW STRIP)(4 IN)
CY 19.500 $680.000 $1,500.000 $750.000 $1,500.000 $550.000
MOBILIZATION
LS 1.000 $293,211.000 $228,000.000 $400,000.000 $425,000.000 $400,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 16.000 $8,500.000 $1,725.000 $10,000.000 $5,250.000 $8,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 970.000 $34.000 $40.000 $50.000 $31.500 $40.000
ROCK FILTER DAMS (REMOVE)
LF 970.000 $15.000 $15.000 $20.000 $15.750 $20.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 103.000 $40.000 $40.000 $50.000 $34.650 $40.000
CONSTRUCTION EXITS (REMOVE)
SY 103.000 $15.000 $12.000 $20.000 $12.600 $20.000
CONSTRUCTION PERIMETER FENCE
LF 3,213.000 $5.000 $6.000 $10.000 $6.300 $20.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 11,115.000 $4.000 $4.000 $5.000 $3.410 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 11,115.000 $2.000 $1.000 $2.500 $1.050 $2.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 210.000 $8.000 $5.000 $10.000 $5.250 $18.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 210.000 $2.000 $1.000 $5.000 $1.310 $9.000
MTL W-BEAM GD FEN (TIM POST)
LF 300.000 $30.000 $26.750 $30.000 $23.630 $30.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,850.000 $1,610.000 $2,500.000 $1,260.000 $1,850.000
TL-3 31" SHORT RADIUS (COMPLETE)
EA 1.000 $29,250.000 $21,843.000 $25,000.000 $590.630 $15,000.000
REMOVE METAL BEAM GUARD FENCE
LF 125.000 $6.000 $10.000 $5.000 $3.150 $5.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,400.000 $2,932.000 $3,750.000 $3,021.380 $3,850.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $350.000 $350.000 $400.000 $262.500 $1,500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 12.000 $850.000 $685.000 $800.000 $729.750 $1,500.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 11.000 $40.000 $25.000 $35.000 $26.250 $100.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 24.000 $70.000 $72.500 $70.000 $63.000 $100.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 158.000 $8.000 $5.550 $7.000 $7.930 $20.000
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 16,851.000 $0.950 $0.990 $1.250 $0.740 $1.500
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 23,741.000 $0.850 $0.990 $1.250 $0.740 $1.500
REFL PAV MRKR TY II-A-A
EA 596.000 $5.000 $5.000 $7.000 $5.250 $6.000
FULL - WIDTH MOWING
CYC 6.000 $5,000.000 $6,600.000 $5,000.000 $3,150.000 $3,000.000
Totals: $3,361,319.550 $3,669,509.030 $4,129,565.500 $4,231,886.050 $4,860,493.000