Show Job Controls
Bid Cobra

DALLAS FD (0918-47-096)

Items: 64

County: DALLAS
Length: N/A
Highway: FD
District: DALLAS
Control Number: 0918-47-096
DBE Goal: N/A
Project: C 918-47-96
Guaranty: N/A
Time: 112 WORKING DAYS
Engineer's Estimate: $4,405,760.91
Date: 07/01/2021 (4 years ago)
Contract Number: N/A
Type: GR, STR, AND BASE REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (6)
E
Engineer's Estimate
$4,405,760.91
$4,547,348.26
Over/Under Est: 3.21% $141,587.35
Over/Under Est: 10.36% $456,551.21
Amt Left: 6.93% $314,963.86
Over/Under Est: 13.97% $615,269.71
Amt Left: 10.42% $473,682.36
Delta: -3.26% -$158,718.50
Over/Under Est: 15.97% $703,722.84
Amt Left: 12.36% $562,135.49
Delta: -1.76% -$88,453.13
$5,114,097.56
Over/Under Est: 16.08% $708,336.65
Amt Left: 12.46% $566,749.30
Delta: -0.09% -$4,613.81
$5,706,030.40
Over/Under Est: 29.51% $1,300,269.49
Amt Left: 25.48% $1,158,682.14
Delta: -11.57% -$591,932.84

Bid Items & Bid Tabulations

64 Total 0 of 64
DALLAS  |  FD  |  DALLAS  |  0918-47-096  |  07/01/2021  |  $4,405,760.91  |  C 918-47-96  |  GR, STR, AND BASE REPAIR  |  112 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
A. L. HELMCAMP, INC.
ACCELERATED CRITICAL PATH, INC.
HARRISON, WALKER AND HARPER, LLC
ED BELL CONSTRUCTION COMPANY
ALTUS CONSTRUCTION LLC
FNH CONSTRUCTION, LLC
PREPARING ROW
STA 151.000 $1,200.000 $500.000 $540.000 $581.850 $525.000 $1,199.390 $2,908.000
REMOVING CONC (PAV)
SY 68.000 $12.140 $90.000 $35.000 $16.500 $21.000 $23.990 $20.000
REMOVING CONC (RIPRAP)
SY 101.000 $7.740 $50.000 $12.000 $11.300 $25.000 $11.990 $20.000
REMOVING CONC (CURB AND GUTTER)
LF 1,203.000 $20.640 $5.000 $7.000 $7.900 $7.000 $6.730 $20.000
REMOVE STAB BASE & ASPH PAV (13"-18")
SY 38,709.000 $8.000 $10.000 $6.000 $5.150 $5.000 $6.310 $6.000
EXCAVATION (ROADWAY)
CY 36,673.000 $8.500 $14.000 $15.000 $16.750 $18.500 $19.450 $15.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 34,265.000 $20.000 $14.000 $27.000 $29.500 $28.500 $20.640 $20.000
BACKFILL (TY A OR B)
STA 142.300 $233.050 $200.000 $290.000 $356.600 $130.000 $192.170 $250.000
BLADING
STA 142.300 $212.420 $150.000 $110.000 $153.900 $130.000 $119.970 $250.000
DRILL SEEDING (PERM) (URBAN) (CLAY)
SY 14,281.000 $0.200 $0.260 $0.150 $0.250 $0.250 $0.270 $2.000
DRILL SEED (TEMP)(WARM OR COOL)
SY 14,281.000 $0.180 $0.250 $0.150 $0.250 $0.170 $0.200 $2.000
VEGETATIVE WATERING
MG 4,249.000 $2.020 $2.000 $10.000 $3.600 $1.050 $1.200 $20.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 15,679.000 $54.000 $60.000 $59.000 $49.750 $63.000 $48.990 $55.000
EMULS ASPH (PRIME)(MS-2 OR SS-1)
GAL 8,893.000 $4.350 $5.500 $4.000 $4.450 $6.740 $5.100 $10.000
ASPH (CRS-2P)
GAL 7,353.000 $4.000 $4.000 $4.000 $4.050 $4.100 $4.680 $6.000
ASPH (RC-250)
GAL 4,118.000 $4.500 $5.000 $4.000 $5.400 $5.410 $6.180 $6.000
AGGR (TY-B GR-5 OR TY-L GR-5)
CY 118.000 $135.000 $180.000 $190.000 $208.600 $210.000 $239.880 $6.000
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
GAL 6,177.000 $4.000 $4.000 $4.000 $4.050 $4.100 $4.680 $6.000
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
CY 280.000 $144.830 $170.000 $190.000 $196.050 $197.400 $225.490 $200.000
PLANE ASPH CONC PAV(0" TO 2")
SY 30,938.000 $2.140 $1.500 $2.000 $1.850 $1.860 $2.810 $5.000
CONC PVMT (CONT REINF - CRCP) (8")
SY 1,023.000 $46.080 $100.000 $89.000 $101.000 $105.000 $100.400 $100.000
RIPRAP (CONC)(4 IN)
CY 8.600 $448.500 $630.000 $850.000 $1,101.600 $1,000.000 $479.350 $650.000
RC PIPE (CL IV)(18 IN)
LF 355.000 $68.230 $55.000 $70.000 $64.700 $75.000 $60.370 $100.000
RC PIPE (CL IV)(24 IN)
LF 44.000 $106.860 $75.000 $90.000 $170.200 $105.000 $179.090 $125.000
RC PIPE (CL IV)(30 IN)
LF 33.000 $111.910 $110.000 $130.000 $232.500 $140.000 $197.870 $150.000
INLET(COMPL)(PAZD)(FG)(4FTX4FT-4FTX4FT)
EA 1.000 $10,500.000 $5,300.000 $5,500.000 $9,307.000 $6,000.000 $10,036.500 $10,000.000
HEADWALL (CH - PW - S) (DIA= 30 IN)
EA 2.000 $12,000.000 $5,700.000 $5,000.000 $7,678.250 $6,000.000 $6,235.600 $6,500.000
SET (TY II) (18 IN) (RCP) (3: 1) (C)
EA 10.000 $816.440 $670.000 $750.000 $1,066.300 $1,500.000 $1,541.220 $1,850.000
SET (TY II) (24 IN) (RCP) (3: 1) (P)
EA 1.000 $1,386.240 $820.000 $900.000 $4,905.500 $2,100.000 $1,665.950 $2,500.000
REMOV STR (INLET)
EA 2.000 $650.000 $500.000 $900.000 $476.650 $1,000.000 $880.920 $2,500.000
REMOV STR (SET)
EA 10.000 $192.500 $190.000 $400.000 $187.750 $300.000 $629.620 $2,500.000
REMOV STR (HEADWALL)
EA 2.000 $800.000 $790.000 $900.000 $782.250 $2,750.000 $1,210.150 $2,500.000
REMOV STR (PIPE)
LF 457.000 $12.200 $10.000 $15.000 $9.400 $21.000 $15.290 $30.000
MOBILIZATION
LS 1.000 $393,535.530 $370,000.000 $530,000.000 $495,500.000 $500,000.000 $503,744.070 $500,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $9,000.000 $7,500.000 $5,900.000 $11,102.900 $11,550.000 $11,993.910 $8,500.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 234.000 $25.800 $15.000 $29.000 $26.800 $21.000 $22.280 $30.000
CONSTRUCTION EXITS (REMOVE)
SY 234.000 $8.560 $5.000 $9.000 $8.300 $10.500 $7.600 $15.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 26,207.000 $2.320 $2.300 $3.000 $2.300 $1.470 $2.340 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 26,207.000 $0.600 $0.480 $0.800 $0.450 $0.110 $0.770 $2.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,830.000 $4.670 $3.950 $7.000 $3.900 $2.630 $4.130 $18.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,830.000 $1.510 $0.540 $1.500 $0.550 $1.050 $1.200 $9.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 2.000 $4,000.000 $10,000.000 $6,900.000 $5,215.050 $7,350.000 $4,703.260 $8,500.000
CONC CURB & GUTTER (TY II)
LF 1,193.000 $50.000 $30.000 $29.000 $29.200 $50.000 $25.120 $45.000
DRIVEWAYS (ACP)
SY 1,677.000 $48.000 $50.000 $24.000 $42.750 $23.330 $51.110 $45.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,182.000 $20.000 $23.000 $23.000 $22.950 $23.100 $17.840 $25.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 11.000 $1,000.000 $1,155.000 $1,200.000 $1,147.300 $1,155.000 $1,407.490 $1,850.000
REMOVE METAL BEAM GUARD FENCE
LF 1,182.000 $2.370 $2.750 $3.000 $2.600 $2.630 $2.750 $3.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 11.000 $125.000 $160.000 $200.000 $156.450 $157.500 $430.670 $650.000
GUARDRAIL END TREATMENT (INSTALL)
EA 11.000 $2,634.250 $2,700.000 $2,600.000 $2,685.750 $2,703.750 $2,491.940 $2,850.000
GUARDRAIL END TREATMENT (REMOVE)
EA 11.000 $240.000 $250.000 $300.000 $260.750 $262.500 $293.240 $1,500.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 52.000 $397.870 $420.000 $500.000 $756.200 $761.250 $869.560 $850.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 30.000 $53.300 $42.000 $40.000 $41.700 $42.000 $113.940 $100.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 1,485.000 $1.050 $1.000 $1.000 $1.750 $1.500 $1.070 $5.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 228.000 $13.710 $8.950 $8.000 $8.350 $8.400 $9.600 $20.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 38,925.200 $0.400 $0.540 $0.500 $0.450 $0.470 $0.540 $1.000
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 35,611.000 $0.390 $0.450 $0.500 $0.400 $0.400 $0.460 $1.000
REFL PAV MRKR TY II-A-A
EA 890.280 $3.640 $3.920 $4.000 $3.650 $3.680 $4.200 $15.000
DITCH CLEANING AND RESHAPING (FOOT)
LF 200.000 $6.640 $16.000 $19.000 $9.700 $21.000 $4.670 $20.000
SP MIXES SP-C SAC-B PG64-22
TON 7,891.000 $90.000 $100.000 $79.000 $96.650 $88.000 $111.120 $95.000
TACK COAT
GAL 5,645.000 $0.150 $4.950 $5.000 $2.800 $2.750 $3.240 $6.000
REMOVE PRECAST CONCRETE WHEEL STOPS
EA 249.000 $25.000 $18.000 $35.000 $36.500 $40.000 $41.980 $50.000
FRNISH & INSTAL PRECST CONC WHEEL STOPS
EA 249.000 $75.000 $75.000 $50.000 $52.150 $60.000 $83.960 $100.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $11,790.380 $10,000.000 $3,900.000 $15,750.000 $4,500.000 $5,996.950 $16,500.000
TMA (STATIONARY)
DAY 45.000 $283.750 $300.000 $160.000 $225.000 $157.500 $299.850 $350.000
Totals: $4,405,760.910 $4,547,348.276 $4,862,312.120 $5,021,030.622 $5,109,483.754 $5,114,097.576 $5,706,030.400