County: DALLAS Highway: FD Date: 07/01/2021 (3 years ago) Engineer's Estimate: $4,405,761 Control Number: 0918-47-096
Project: C 918-47-96 District: DALLAS Time: 112 WORKING DAYS Type: GR, STR, AND BASE REPAIR

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $4,405,760.91
A. L. HELMCAMP, INC.   $4,547,348.26 1
3.21% | $141,587.35
ACCELERATED CRITICAL PATH, INC.   $4,862,312.12 2
10.36% | $456,551.21
6.93% | $314,963.86
HARRISON, WALKER AND HARPER, LLC   $5,021,030.62 3
13.97% | $615,269.71
10.42% | $473,682.36
3.26% | $158,718.50
ED BELL CONSTRUCTION COMPANY   $5,109,483.75 4
15.97% | $703,722.84
12.36% | $562,135.49
1.76% | $88,453.13
ALTUS CONSTRUCTION LLC   $5,114,097.56 5
16.08% | $708,336.65
12.46% | $566,749.30
0.09% | $4,613.81
FNH CONSTRUCTION, LLC   $5,706,030.40 6
29.51% | $1,300,269.49
25.48% | $1,158,682.14
11.57% | $591,932.84

Bid Items

Items: 64, 0 filtered
DALLAS FD  |  DALLAS  |  0918-47-096  |  07/01/2021  |  $4,405,761  |  C 918-47-96  |  GR, STR, AND BASE REPAIR  |  112 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate A. L. HELMCAMP, INC. ACCELERATED CRITICAL PATH, INC. HARRISON, WALKER AND HARPER, LLC ED BELL CONSTRUCTION COMPANY ALTUS CONSTRUCTION LLC FNH CONSTRUCTION, LLC
100 6002 PREPARING ROW STA 151.000 $1,200.000 $500.000 $540.000 $581.850 $525.000 $1,199.390 $2,908.000
104 6001 REMOVING CONC (PAV) SY 68.000 $12.140 $90.000 $35.000 $16.500 $21.000 $23.990 $20.000
104 6009 REMOVING CONC (RIPRAP) SY 101.000 $7.740 $50.000 $12.000 $11.300 $25.000 $11.990 $20.000
104 6022 REMOVING CONC (CURB AND GUTTER) LF 1,203.000 $20.640 $5.000 $7.000 $7.900 $7.000 $6.730 $20.000
105 6026 REMOVE STAB BASE & ASPH PAV (13"-18") SY 38,709.000 $8.000 $10.000 $6.000 $5.150 $5.000 $6.310 $6.000
110 6001 EXCAVATION (ROADWAY) CY 36,673.000 $8.500 $14.000 $15.000 $16.750 $18.500 $19.450 $15.000
132 6006 EMBANKMENT (FINAL)(DENS CONT)(TY C) CY 34,265.000 $20.000 $14.000 $27.000 $29.500 $28.500 $20.640 $20.000
134 6004 BACKFILL (TY A OR B) STA 142.300 $233.050 $200.000 $290.000 $356.600 $130.000 $192.170 $250.000
150 6001 BLADING STA 142.300 $212.420 $150.000 $110.000 $153.900 $130.000 $119.970 $250.000
164 6039 DRILL SEEDING (PERM) (URBAN) (CLAY) SY 14,281.000 $0.200 $0.260 $0.150 $0.250 $0.250 $0.270 $2.000
164 6051 DRILL SEED (TEMP)(WARM OR COOL) SY 14,281.000 $0.180 $0.250 $0.150 $0.250 $0.170 $0.200 $2.000
168 6001 VEGETATIVE WATERING MG 4,249.000 $2.020 $2.000 $10.000 $3.600 $1.050 $1.200 $20.000
247 6041 FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS) CY 15,679.000 $54.000 $60.000 $59.000 $49.750 $63.000 $48.990 $55.000
314 6021 EMULS ASPH (PRIME)(MS-2 OR SS-1) GAL 8,893.000 $4.350 $5.500 $4.000 $4.450 $6.740 $5.100 $10.000
316 6024 ASPH (CRS-2P) GAL 7,353.000 $4.000 $4.000 $4.000 $4.050 $4.100 $4.680 $6.000
316 6029 ASPH (RC-250) GAL 4,118.000 $4.500 $5.000 $4.000 $5.400 $5.410 $6.180 $6.000
316 6403 AGGR (TY-B GR-5 OR TY-L GR-5) CY 118.000 $135.000 $180.000 $190.000 $208.600 $210.000 $239.880 $6.000
316 6419 ASPH (AC-15P, AC-20-5TR OR AC-20XP) GAL 6,177.000 $4.000 $4.000 $4.000 $4.050 $4.100 $4.680 $6.000
316 6440 AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B) CY 280.000 $144.830 $170.000 $190.000 $196.050 $197.400 $225.490 $200.000
354 6021 PLANE ASPH CONC PAV(0" TO 2") SY 30,938.000 $2.140 $1.500 $2.000 $1.850 $1.860 $2.810 $5.000
360 6002 CONC PVMT (CONT REINF - CRCP) (8") SY 1,023.000 $46.080 $100.000 $89.000 $101.000 $105.000 $100.400 $100.000
432 6001 RIPRAP (CONC)(4 IN) CY 8.600 $448.500 $630.000 $850.000 $1,101.600 $1,000.000 $479.350 $650.000
464 6017 RC PIPE (CL IV)(18 IN) LF 355.000 $68.230 $55.000 $70.000 $64.700 $75.000 $60.370 $100.000
464 6018 RC PIPE (CL IV)(24 IN) LF 44.000 $106.860 $75.000 $90.000 $170.200 $105.000 $179.090 $125.000
464 6019 RC PIPE (CL IV)(30 IN) LF 33.000 $111.910 $110.000 $130.000 $232.500 $140.000 $197.870 $150.000
465 6160 INLET(COMPL)(PAZD)(FG)(4FTX4FT-4FTX4FT) EA 1.000 $10,500.000 $5,300.000 $5,500.000 $9,307.000 $6,000.000 $10,036.500 $10,000.000
466 6132 HEADWALL (CH - PW - S) (DIA= 30 IN) EA 2.000 $12,000.000 $5,700.000 $5,000.000 $7,678.250 $6,000.000 $6,235.600 $6,500.000
467 6356 SET (TY II) (18 IN) (RCP) (3: 1) (C) EA 10.000 $816.440 $670.000 $750.000 $1,066.300 $1,500.000 $1,541.220 $1,850.000
467 6389 SET (TY II) (24 IN) (RCP) (3: 1) (P) EA 1.000 $1,386.240 $820.000 $900.000 $4,905.500 $2,100.000 $1,665.950 $2,500.000
496 6002 REMOV STR (INLET) EA 2.000 $650.000 $500.000 $900.000 $476.650 $1,000.000 $880.920 $2,500.000
496 6004 REMOV STR (SET) EA 10.000 $192.500 $190.000 $400.000 $187.750 $300.000 $629.620 $2,500.000
496 6006 REMOV STR (HEADWALL) EA 2.000 $800.000 $790.000 $900.000 $782.250 $2,750.000 $1,210.150 $2,500.000
496 6007 REMOV STR (PIPE) LF 457.000 $12.200 $10.000 $15.000 $9.400 $21.000 $15.290 $30.000
500 6001 MOBILIZATION LS 1.000 $393,535.530 $370,000.000 $530,000.000 $495,500.000 $500,000.000 $503,744.070 $500,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 6.000 $9,000.000 $7,500.000 $5,900.000 $11,102.900 $11,550.000 $11,993.910 $8,500.000
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 234.000 $25.800 $15.000 $29.000 $26.800 $21.000 $22.280 $30.000
506 6024 CONSTRUCTION EXITS (REMOVE) SY 234.000 $8.560 $5.000 $9.000 $8.300 $10.500 $7.600 $15.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 26,207.000 $2.320 $2.300 $3.000 $2.300 $1.470 $2.340 $4.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 26,207.000 $0.600 $0.480 $0.800 $0.450 $0.110 $0.770 $2.000
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 1,830.000 $4.670 $3.950 $7.000 $3.900 $2.630 $4.130 $18.000
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 1,830.000 $1.510 $0.540 $1.500 $0.550 $1.050 $1.200 $9.000
510 6003 ONE-WAY TRAF CONT (PORT TRAF SIG) MO 2.000 $4,000.000 $10,000.000 $6,900.000 $5,215.050 $7,350.000 $4,703.260 $8,500.000
529 6008 CONC CURB & GUTTER (TY II) LF 1,193.000 $50.000 $30.000 $29.000 $29.200 $50.000 $25.120 $45.000
530 6005 DRIVEWAYS (ACP) SY 1,677.000 $48.000 $50.000 $24.000 $42.750 $23.330 $51.110 $45.000
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 1,182.000 $20.000 $23.000 $23.000 $22.950 $23.100 $17.840 $25.000
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 11.000 $1,000.000 $1,155.000 $1,200.000 $1,147.300 $1,155.000 $1,407.490 $1,850.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 1,182.000 $2.370 $2.750 $3.000 $2.600 $2.630 $2.750 $3.000
542 6003 REMOVE DOWNSTREAM ANCHOR TERMINAL EA 11.000 $125.000 $160.000 $200.000 $156.450 $157.500 $430.670 $650.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 11.000 $2,634.250 $2,700.000 $2,600.000 $2,685.750 $2,703.750 $2,491.940 $2,850.000
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 11.000 $240.000 $250.000 $300.000 $260.750 $262.500 $293.240 $1,500.000
644 6068 RELOCATE SM RD SN SUP&AM TY 10BWG EA 52.000 $397.870 $420.000 $500.000 $756.200 $761.250 $869.560 $850.000
658 6047 INSTL OM ASSM (OM-2Y)(WC)GND EA 30.000 $53.300 $42.000 $40.000 $41.700 $42.000 $113.940 $100.000
662 6109 WK ZN PAV MRK SHT TERM (TAB)TY W EA 1,485.000 $1.050 $1.000 $1.000 $1.750 $1.500 $1.070 $5.000
666 6048 REFL PAV MRK TY I (W)24"(SLD)(100MIL) LF 228.000 $13.710 $8.950 $8.000 $8.350 $8.400 $9.600 $20.000
666 6303 RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) LF 38,925.200 $0.400 $0.540 $0.500 $0.450 $0.470 $0.540 $1.000
666 6315 RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) LF 35,611.000 $0.390 $0.450 $0.500 $0.400 $0.400 $0.460 $1.000
672 6009 REFL PAV MRKR TY II-A-A EA 890.280 $3.640 $3.920 $4.000 $3.650 $3.680 $4.200 $15.000
760 6001 DITCH CLEANING AND RESHAPING (FOOT) LF 200.000 $6.640 $16.000 $19.000 $9.700 $21.000 $4.670 $20.000
3077 6013 SP MIXES SP-C SAC-B PG64-22 TON 7,891.000 $90.000 $100.000 $79.000 $96.650 $88.000 $111.120 $95.000
3077 6075 TACK COAT GAL 5,645.000 $0.150 $4.950 $5.000 $2.800 $2.750 $3.240 $6.000
5072 6001 REMOVE PRECAST CONCRETE WHEEL STOPS EA 249.000 $25.000 $18.000 $35.000 $36.500 $40.000 $41.980 $50.000
5072 6002 FRNISH & INSTAL PRECST CONC WHEEL STOPS EA 249.000 $75.000 $75.000 $50.000 $52.150 $60.000 $83.960 $100.000
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 2.000 $11,790.380 $10,000.000 $3,900.000 $15,750.000 $4,500.000 $5,996.950 $16,500.000
6185 6002 TMA (STATIONARY) DAY 45.000 $283.750 $300.000 $160.000 $225.000 $157.500 $299.850 $350.000
Totals: $4,405,760.91 $4,547,348.28 $4,862,312.12 $5,021,030.62 $5,109,483.75 $5,114,097.58 $5,706,030.40