Job Info for 0918-00-305

County: DALLAS Highway: VA Date: 07/08/2020 (4 years ago) Engineer's Estimate: $3,849,255 Control Number: 0918-00-305
Project: NH 2B20(032) District: DALLAS Time: 367 WORKING DAYS Type: INSTALL CABLE BARRIERS

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $3,849,255.07
ALTUS CONSTRUCTION LLC   $4,220,769.77 1
9.65% | $371,514.70
MASSANA, INC.   $4,807,383.00 2
24.89% | $958,127.93
13.9% | $586,613.23
CROSS PLUS CONSTRUCTION, LLC   $4,849,967.36 3
26% | $1,000,712.29
14.91% | $629,197.59
0.89% | $42,584.36
SCR CIVIL CONSTRUCTION, LLC   $5,196,964.98 4
35.01% | $1,347,709.91
23.13% | $976,195.21
7.15% | $346,997.62
GRATIOT CONSTRUCTION, LTD.   $5,997,191.43 5
55.8% | $2,147,936.36
42.09% | $1,776,421.66
15.40% | $800,226.45
FNH CONSTRUCTION, LLC   $6,326,076.50 6
64.35% | $2,476,821.43
49.88% | $2,105,306.73
5.48% | $328,885.07
TEXAS-REYES GROUP LTD.   $8,089,641.34 7
110.16% | $4,240,386.27
91.66% | $3,868,871.57
27.88% | $1,763,564.84
VANN/ELLI, INC.   $9,712,484.23 8
152.32% | $5,863,229.16
130.11% | $5,491,714.46
20.06% | $1,622,842.89

Bid Items

Items: 22, 0 filtered
DALLAS VA  |  DALLAS  |  0918-00-305  |  07/08/2020  |  $3,849,255  |  NH 2B20(032)  |  INSTL CABLE BARRIERS  |  367 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate ALTUS CONSTRUCTION LLC MASSANA, INC. CROSS PLUS CONSTRUCTION, LLC SCR CIVIL CONSTRUCTION, LLC GRATIOT CONSTRUCTION, LTD. FNH CONSTRUCTION, LLC TEXAS-REYES GROUP LTD. VANN/ELLI, INC.
110 6001 EXCAVATION (ROADWAY) CY 1,563.000 $11.450 $32.840 $75.000 $55.000 $75.000 $25.000 $30.000 $105.000 $65.000
132 6003 EMBANKMENT (FINAL)(ORD COMP)(TY B) CY 521.000 $18.860 $65.680 $75.000 $35.000 $100.000 $33.130 $35.000 $40.000 $50.000
161 6017 COMPOST MANUF TOPSOIL (4") SY 339,806.000 $1.220 $1.310 $1.170 $5.000 $1.100 $1.740 $3.000 $1.800 $5.600
164 6035 DRILL SEEDING (PERM) (RURAL) (CLAY) SY 339,806.000 $0.150 $0.260 $0.130 $0.530 $0.130 $0.120 $0.250 $0.350 $0.260
164 6051 DRILL SEED (TEMP)(WARM OR COOL) SY 339,806.000 $0.130 $0.260 $0.100 $0.530 $0.100 $0.120 $0.250 $0.300 $0.220
168 6001 VEGETATIVE WATERING MG 101,088.000 $11.320 $2.630 $18.000 $1.000 $11.000 $24.860 $26.000 $50.680 $46.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 1,563.000 $497.300 $656.820 $291.000 $500.000 $922.000 $659.260 $450.000 $335.000 $525.000
500 6001 MOBILIZATION LS 1.000 $371,744.600 $420,361.860 $1,001,087.600 $350,000.000 $519,600.000 $717,286.510 $650,000.000 $200,000.000 $800,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 18.000 $12,148.170 $10,509.050 $15,000.000 $12,000.000 $28,000.000 $9,293.460 $8,500.000 $3,500.000 $8,500.000
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 800.000 $24.740 $32.840 $35.000 $25.000 $38.000 $37.500 $30.000 $36.500 $30.000
506 6024 CONSTRUCTION EXITS (REMOVE) SY 800.000 $9.410 $10.510 $9.000 $21.000 $9.000 $15.890 $15.000 $16.000 $12.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 10,940.000 $2.460 $3.940 $3.000 $5.000 $3.100 $2.690 $4.000 $2.300 $6.500
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 10,940.000 $0.760 $1.310 $0.500 $2.000 $0.500 $1.250 $2.000 $0.650 $1.000
506 6042 BIODEG EROSN CONT LOGS (INSTL) (18") LF 7,000.000 $5.640 $7.880 $4.500 $18.000 $5.000 $5.000 $9.000 $5.650 $7.000
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 7,000.000 $1.520 $2.630 $1.000 $8.000 $1.000 $1.380 $5.000 $1.400 $1.000
543 6001 CABLE BARRIER SYSTEM (TL-3) LF 7,765.000 $10.190 $18.390 $11.000 $15.000 $20.000 $9.740 $8.500 $14.500 $12.550
543 6002 CABLE BARRIER SYSTEM (TL-4) LF 31,400.000 $9.310 $18.390 $7.000 $15.000 $10.500 $9.020 $8.500 $14.400 $12.550
543 6019 CABLE BARRIER TERMINAL SECTION (TL-3) EA 14.000 $2,897.170 $4,597.710 $1,680.000 $2,800.000 $5,500.000 $2,976.800 $3,000.000 $2,650.000 $3,200.000
543 6020 CABLE BARRIER TERMINAL SECTION (TL-4) EA 40.000 $2,750.140 $3,940.890 $1,490.000 $2,500.000 $2,550.000 $2,976.800 $3,000.000 $2,500.000 $3,200.000
730 6107 FULL - WIDTH MOWING CYC 3.000 $3,800.000 $7,881.780 $15,000.000 $10,000.000 $10,000.000 $21,000.000 $5,000.000 $13,112.000 $25,000.000
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 6.000 $12,828.850 $19,704.460 $9,500.000 $400.000 $20,000.000 $7,500.000 $16,500.000 $32,780.050 $20,000.000
6185 6002 TMA (STATIONARY) DAY 367.000 $209.130 $985.220 $75.000 $500.000 $180.000 $223.210 $350.000 $275.000 $175.000
Totals: $3,849,255.07 $4,220,769.77 $4,807,383.00 $4,849,967.36 $5,196,964.98 $5,997,191.43 $6,326,076.50 $8,089,641.34 $9,712,484.23