DALLAS SL 12 (0581-02-151)

Items: 61

County: DALLAS
Length: N/A
Highway: SL 12
District: DALLAS
Control Number: 0581-02-151
DBE Goal: N/A
Project: C 581-2-151
Guaranty: N/A
Time: 106 WORKING DAYS
Engineer's Estimate: $5,522,096.52
Date: 07/01/2021 (4 years ago)
Contract Number: N/A
Type: PLANING, CONCRETE FDR, OVERLAY & PAVEMENT MRKS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (5)
E
Engineer's Estimate
$5,522,096.52
$4,659,680.71
Over/Under Est: -15.62% -$862,415.81
Over/Under Est: -6.11% -$337,430.73
Amt Left: 11.27% $524,985.08
Over/Under Est: -2.24% -$123,629.87
Amt Left: 15.85% $738,785.94
Delta: -4.12% -$213,800.86
$5,508,737.70
Over/Under Est: -0.24% -$13,358.82
Amt Left: 18.22% $849,056.99
Delta: -2.04% -$110,271.05
Over/Under Est: -0.07% -$3,833.37
Amt Left: 18.43% $858,582.44
Delta: -0.17% -$9,525.45

Bid Items & Bid Tabulations

61 Total 0 of 61
DALLAS  |  SL 12  |  DALLAS  |  0581-02-151  |  07/01/2021  |  $5,522,096.52  |  C 581-2-151  |  PLANING, CONC FDR, OVERLAY & PAVMT M...  |  106 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
AUSTIN BRIDGE & ROAD SERVICES, LP
PEACHTREE CONSTRUCTION, LTD.
JAGOE-PUBLIC COMPANY
FOUTSCO PAVING COMPANY, LLC
REMOVING CONC (CURB)
LF 759.000 $5.120 $4.500 $30.000 $5.000 $17.000 $6.000
STONE-MTRX-ASPH SMA-C SAC-A PG76-22
TON 21,220.000 $112.000 $108.000 $112.000 $116.400 $113.000 $149.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 1,613.000 $75.000 $82.000 $100.000 $82.100 $95.000 $85.000
PLAN ASPH CONC PAV(0" TO 2.25")
SY 171,471.000 $2.250 $0.880 $1.140 $1.650 $1.500 $0.500
PAV JT UNDERSEAL (24")
LF 1,473.000 $28.000 $19.000 $18.000 $48.000 $48.000 $13.000
FULL - DEPTH REPAIR CPJR (8")
SY 3,189.000 $200.000 $203.000 $200.000 $205.000 $286.000 $150.000
CL K CONC (CAP) (EXTEND)
CY 13.500 $8,000.000 $9,250.000 $6,600.000 $4,050.000 $7,000.000 $3,500.000
CONC STR REPAIR(RAPID DECK REP(PRT DPT)
SF 600.000 $185.000 $145.000 $63.000 $65.500 $67.000 $135.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 600.000 $225.000 $165.000 $240.000 $258.000 $255.000 $160.000
RIPRAP (MOW STRIP)(4 IN)
CY 22.000 $635.390 $650.000 $681.150 $635.000 $635.000 $350.000
CLEANING AND SEALING EXIST JOINTS(CL3)
LF 1,473.000 $50.000 $15.000 $16.000 $69.000 $74.000 $14.000
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 479.000 $50.000 $38.000 $38.000 $66.000 $70.000 $20.000
RAISING EXIST STRUCT
LS 1.000 $25,000.000 $63,000.000 $48,000.000 $48,000.000 $51,000.000 $73,000.000
MOBILIZATION
LS 1.000 $485,876.960 $409,127.000 $509,400.000 $450,000.000 $225,000.000 $500,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $11,500.000 $14,600.000 $15,000.000 $10,500.000 $20,000.000 $2,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,000.000 $2.660 $2.000 $2.250 $2.300 $2.000 $2.250
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,000.000 $0.600 $1.000 $0.650 $0.700 $0.700 $0.650
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 1,000.000 $6.180 $5.000 $6.000 $6.500 $6.000 $6.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,000.000 $1.500 $1.000 $1.100 $1.200 $1.000 $1.100
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 810.000 $18.180 $40.000 $10.000 $38.000 $38.000 $60.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 400.000 $10.000 $9.000 $6.480 $17.000 $16.000 $10.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 810.000 $4.360 $16.500 $10.000 $27.000 $27.000 $10.000
CONC CURB (TY I)
LF 200.000 $15.000 $14.500 $36.000 $15.000 $20.000 $15.000
CONC CURB (TY III)
LF 559.000 $14.570 $21.000 $36.000 $21.000 $22.000 $20.000
MTL W-BEAM GD FEN (TIM POST)
LF 225.000 $17.670 $22.000 $20.000 $27.000 $21.000 $20.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $2,035.000 $1,700.000 $1,600.000 $1,850.000 $1,700.000 $1,600.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,350.000 $1,200.000 $1,100.000 $1,350.000 $1,200.000 $1,100.000
REMOVE METAL BEAM GUARD FENCE
LF 232.000 $3.000 $5.300 $5.000 $5.300 $5.500 $5.000
REMOVE TERMINAL ANCHOR SECTION
EA 1.000 $220.000 $212.000 $200.000 $215.000 $210.000 $200.000
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $2,600.000 $2,700.000 $2,550.000 $3,050.000 $2,700.000 $2,550.000
GUARDRAIL END TREATMENT (REMOVE)
EA 3.000 $275.000 $345.000 $325.000 $238.000 $340.000 $325.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,200.000 $765.000 $750.000 $825.000 $790.000 $750.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $7,900.000 $7,800.000 $7,400.000 $9,750.000 $7,800.000 $7,400.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 7.000 $37.000 $26.000 $25.000 $26.500 $27.000 $25.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 4,437.000 $1.050 $1.000 $0.400 $2.100 $0.650 $0.750
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
LF 702.000 $2.750 $1.700 $1.650 $1.750 $3.750 $1.650
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 1,245.000 $3.020 $3.500 $3.400 $3.600 $3.750 $3.400
REFL PAV MRK TY I (W)(NUMBER)(100MIL)
EA 5.000 $175.000 $305.000 $300.000 $325.000 $260.000 $300.000
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
EA 5.000 $750.000 $825.000 $800.000 $860.000 $530.000 $800.000
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
EA 5.000 $789.000 $825.000 $800.000 $860.000 $1,100.000 $800.000
PAVEMENT SEALER 4"
LF 11,800.000 $0.190 $0.112 $0.110 $0.120 $0.160 $0.110
PAVEMENT SEALER 6"
LF 4,440.000 $0.190 $0.142 $0.140 $0.150 $0.260 $0.140
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 30,900.000 $0.400 $0.390 $0.380 $0.400 $0.450 $0.380
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 18,350.000 $0.600 $0.410 $0.400 $0.420 $0.650 $0.400
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 30,900.000 $0.350 $0.390 $0.380 $0.400 $0.450 $0.380
REFL PAV MRKR TY II-C-R
EA 1,093.000 $4.000 $3.600 $3.500 $3.700 $4.000 $3.500
ELIM EXT PAV MRK & MRKS (4")
LF 11,800.000 $0.350 $0.360 $0.350 $0.360 $0.550 $0.350
ELIM EXT PAV MRK & MRKS (6")
LF 4,440.000 $0.670 $0.360 $0.350 $0.360 $0.650 $0.350
PAV SURF PREP FOR MRK (4")
LF 11,800.000 $0.060 $0.102 $0.100 $0.110 $0.050 $0.100
PAV SURF PREP FOR MRK (6")
LF 4,440.000 $0.070 $0.102 $0.100 $0.110 $0.050 $0.100
REPAIR (STEEL RAIL)
LF 150.000 $150.000 $225.000 $325.000 $345.000 $350.000 $125.000
CONCRETE RAIL REPAIR (IN-KIND)
LF 150.000 $600.000 $485.000 $640.000 $680.000 $675.000 $325.000
CONCRETE RAIL REPAIR (MISC)
LF 10.000 $883.330 $435.000 $640.000 $680.000 $675.000 $625.000
BRIDGE JOINT REPLACEMENT (ARMOR)
LF 689.000 $650.000 $138.000 $465.000 $495.000 $530.000 $500.000
CONCRETE BEAM REPAIR
EA 3.000 $18,000.000 $1,950.000 $1,000.000 $1,050.000 $1,100.000 $10,000.000
CONCRETE BEAM REP(STRAND SPLICE & CFRP)
EA 1.000 $18,000.000 $28,500.000 $17,500.000 $18,750.000 $18,600.000 $27,500.000
TACK COAT
GAL 18,862.000 $0.510 $0.010 $2.500 $1.000 $2.500 $3.250
REPLACE ELASTOMERIC BEARING PADS
EA 3.000 $10,000.000 $5,100.000 $6,850.000 $7,300.000 $7,300.000 $4,800.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $12,000.000 $7,000.000 $19,485.000 $12,500.000 $10,000.000 $10,000.000
TMA (STATIONARY)
DAY 80.000 $282.000 $265.000 $293.500 $175.000 $75.000 $250.000
TMA (MOBILE OPERATION)
DAY 35.000 $600.000 $0.010 $0.010 $400.000 $75.000 $250.000
Totals: $5,522,096.520 $4,659,680.710 $5,184,665.790 $5,398,466.650 $5,508,737.700 $5,518,263.150