REMOVING CONC (RIPRAP)
|
SY
|
19.500
|
$50.000
|
$32.000
|
$35.000
|
$200.000
|
$536.800
|
$100.000
|
$100.000
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
54.000
|
$50.000
|
$32.000
|
$35.000
|
$200.000
|
$141.540
|
$50.000
|
$100.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
3,694.000
|
$25.000
|
$8.000
|
$8.800
|
$25.000
|
$10.000
|
$10.000
|
$20.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
360.000
|
$5.000
|
$14.000
|
$36.000
|
$15.000
|
$14.000
|
$50.000
|
$10.000
|
|
|
BLOCK SODDING
|
SY
|
360.000
|
$10.000
|
$9.000
|
$21.000
|
$13.000
|
$9.000
|
$30.000
|
$10.000
|
|
|
VEGETATIVE WATERING
|
MG
|
55.000
|
$15.000
|
$0.010
|
$70.000
|
$200.000
|
$210.000
|
$100.000
|
$50.000
|
|
|
PLANE ASPH CONC PAV(0" TO 3")
|
SY
|
241,909.000
|
$3.000
|
$2.000
|
$4.650
|
$6.000
|
$5.110
|
$3.300
|
$6.000
|
|
|
FULL - DEPTH REPAIR CPCD (10")
|
SY
|
2,700.000
|
$370.000
|
$100.000
|
$325.000
|
$400.000
|
$311.150
|
$350.000
|
$550.000
|
|
|
FULL-DPTH REP(BR APPROACH SLAB)(9"-13")
|
SY
|
8.000
|
$700.000
|
$5,000.000
|
$1,200.000
|
$750.000
|
$2,450.000
|
$1,500.000
|
$1,500.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
40.500
|
$450.000
|
$375.000
|
$400.000
|
$500.000
|
$1,397.800
|
$490.000
|
$350.000
|
|
|
SHEET PILING
|
SF
|
2,000.000
|
$100.000
|
$100.000
|
$81.000
|
$250.000
|
$97.650
|
$70.000
|
$85.000
|
|
|
CL C CONC (COPING)
|
CY
|
16.000
|
$5,000.000
|
$1,550.000
|
$1,900.000
|
$1,000.000
|
$1,928.330
|
$2,000.000
|
$3,500.000
|
|
|
PENETRATING CONCRETE SURFACE TREATMENT
|
SY
|
756.000
|
$15.000
|
$18.000
|
$19.000
|
$16.000
|
$13.000
|
$18.000
|
$30.000
|
|
|
CONC STR REPAIR(CLEAN & COAT WTH EPOXY)
|
SF
|
8.000
|
$200.000
|
$300.000
|
$310.000
|
$256.000
|
$205.000
|
$300.000
|
$400.000
|
|
|
CONC STR REPAIR(RAPID DECK REP(PRT DPT)
|
SF
|
1,989.000
|
$165.000
|
$84.000
|
$88.000
|
$160.000
|
$128.000
|
$80.000
|
$400.000
|
|
|
CONC STR REPR(RAPID DECK REP(FULL DPT))
|
SF
|
319.000
|
$265.000
|
$205.000
|
$215.000
|
$345.000
|
$283.000
|
$240.000
|
$350.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
612.000
|
$200.000
|
$220.000
|
$234.000
|
$277.000
|
$224.000
|
$208.000
|
$300.000
|
|
|
CONC STR REPAIR (STANDARD)
|
SF
|
86.000
|
$500.000
|
$200.000
|
$215.000
|
$485.000
|
$389.000
|
$400.000
|
$300.000
|
|
|
RIPRAP (CONC)(CL B)(RR8&RR9)
|
CY
|
22.500
|
$650.000
|
$675.000
|
$725.000
|
$1,500.000
|
$1,856.350
|
$1,200.000
|
$650.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
12.000
|
$200.000
|
$500.000
|
$420.000
|
$400.000
|
$605.370
|
$373.000
|
$185.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
33.000
|
$650.000
|
$700.000
|
$735.000
|
$1,500.000
|
$1,177.680
|
$771.000
|
$550.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL3)
|
LF
|
1,794.000
|
$20.000
|
$15.000
|
$20.000
|
$40.000
|
$32.000
|
$15.000
|
$60.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL7)
|
LF
|
4,462.000
|
$25.000
|
$30.000
|
$43.000
|
$46.000
|
$37.000
|
$30.000
|
$60.000
|
|
|
CLEANING EXISTING JOINTS
|
LF
|
222.000
|
$20.000
|
$10.000
|
$30.000
|
$25.000
|
$20.000
|
$10.000
|
$60.000
|
|
|
CLEANING AND SEALING JOINTS (FOAM)
|
LF
|
15.000
|
$70.000
|
$150.000
|
$88.000
|
$200.000
|
$160.000
|
$150.000
|
$500.000
|
|
|
CLEANING AND SEALING EXIST JOINTS (SEJ)
|
LF
|
681.000
|
$150.000
|
$87.000
|
$91.000
|
$183.000
|
$145.000
|
$85.760
|
$100.000
|
|
|
CLEAN & PAINT EXIST STR (SYSTEM II)
|
LS
|
1.000
|
$800,000.000
|
$1,742,000.000
|
$1,100,000.000
|
$1,250,000.000
|
$975,000.000
|
$2,887,000.000
|
$1,350,000.000
|
|
|
RETROFIT RAIL (TY SSTR)
|
LF
|
416.000
|
$275.000
|
$185.000
|
$195.000
|
$600.000
|
$556.670
|
$231.000
|
$250.000
|
|
|
RETROFIT RAIL (CONC PARAPET)
|
LF
|
16.000
|
$850.000
|
$2,850.000
|
$485.000
|
$400.000
|
$1,481.160
|
$382.000
|
$4,000.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
1.000
|
$10,000.000
|
$50,000.000
|
$41,000.000
|
$50,000.000
|
$43,862.130
|
$90,000.000
|
$100,000.000
|
|
|
ADJUST STL SHOES
|
EA
|
8.000
|
$5,000.000
|
$12,800.000
|
$14,000.000
|
$9,500.000
|
$7,900.000
|
$30,000.000
|
$15,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,269,422.800
|
$1,400,000.000
|
$1,540,518.000
|
$1,650,000.000
|
$1,847,861.430
|
$1,780,000.000
|
$1,750,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
16.000
|
$44,000.000
|
$200,000.000
|
$45,565.000
|
$5,000.000
|
$75,000.000
|
$61,300.000
|
$12,500.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
5,500.000
|
$5.000
|
$0.010
|
$5.250
|
$4.000
|
$3.100
|
$3.100
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
5,500.000
|
$1.000
|
$0.010
|
$1.320
|
$2.500
|
$1.000
|
$1.000
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
5,500.000
|
$6.000
|
$0.010
|
$7.350
|
$10.000
|
$6.250
|
$6.250
|
$18.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
5,500.000
|
$3.000
|
$0.010
|
$1.600
|
$3.000
|
$1.250
|
$1.250
|
$9.000
|
|
|
TEMP SDMT CONT FENCE (INLET PROTECTION)
|
LF
|
2,750.000
|
$7.000
|
$1.000
|
$10.300
|
$10.000
|
$8.250
|
$8.250
|
$6.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
420.000
|
$80.000
|
$100.000
|
$72.000
|
$125.000
|
$67.750
|
$25.000
|
$100.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
60.000
|
$85.000
|
$100.000
|
$105.000
|
$125.000
|
$77.370
|
$25.000
|
$100.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
420.000
|
$28.000
|
$50.000
|
$36.000
|
$25.000
|
$29.580
|
$15.000
|
$30.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
60.000
|
$42.000
|
$100.000
|
$103.000
|
$25.000
|
$43.810
|
$15.000
|
$30.000
|
|
|
CONC CURB (TY I)
|
LF
|
1,600.000
|
$20.000
|
$20.000
|
$20.000
|
$40.000
|
$60.000
|
$20.000
|
$65.000
|
|
|
CONC CURB (TY II)
|
LF
|
1,919.000
|
$45.000
|
$20.000
|
$20.000
|
$45.000
|
$61.000
|
$20.000
|
$65.000
|
|
|
CONC CURB (TY IV)
|
LF
|
350.000
|
$15.000
|
$32.000
|
$35.000
|
$50.000
|
$60.000
|
$20.000
|
$85.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
44.000
|
$120.000
|
$120.000
|
$106.000
|
$125.000
|
$165.870
|
$115.000
|
$200.000
|
|
|
CONC SIDEWALKS (6")
|
SY
|
10.000
|
$150.000
|
$150.000
|
$106.000
|
$150.000
|
$400.460
|
$160.000
|
$200.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
475.000
|
$27.000
|
$30.000
|
$25.000
|
$25.000
|
$22.500
|
$24.000
|
$30.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$2,300.000
|
$2,500.000
|
$2,300.000
|
$2,100.000
|
$4,078.810
|
$2,669.860
|
$1,850.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$1,200.000
|
$2,000.000
|
$1,600.000
|
$1,300.000
|
$1,400.000
|
$1,250.000
|
$1,850.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
425.000
|
$5.000
|
$3.000
|
$2.850
|
$3.000
|
$2.500
|
$2.500
|
$3.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
1.000
|
$200.000
|
$200.000
|
$170.000
|
$200.000
|
$150.000
|
$250.000
|
$500.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
3.000
|
$3,250.000
|
$4,000.000
|
$3,300.000
|
$3,500.000
|
$2,875.000
|
$3,100.000
|
$3,250.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
3.000
|
$500.000
|
$300.000
|
$280.000
|
$500.000
|
$250.000
|
$250.000
|
$1,500.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
12.000
|
$50.000
|
$25.000
|
$28.000
|
$60.000
|
$25.000
|
$22.000
|
$100.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
|
LF
|
46,080.000
|
$0.850
|
$0.300
|
$0.330
|
$0.600
|
$0.460
|
$0.320
|
$0.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
57,375.000
|
$0.850
|
$0.300
|
$0.320
|
$0.550
|
$0.430
|
$0.300
|
$0.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
2,600.000
|
$1.200
|
$0.600
|
$0.620
|
$0.650
|
$0.510
|
$0.590
|
$0.650
|
|
|
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
|
LF
|
2,800.000
|
$2.500
|
$1.800
|
$1.880
|
$1.000
|
$0.730
|
$1.780
|
$0.750
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
1,000.000
|
$5.000
|
$4.000
|
$4.210
|
$5.000
|
$4.000
|
$4.000
|
$6.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
57,378.000
|
$0.850
|
$0.300
|
$0.320
|
$0.550
|
$0.430
|
$0.300
|
$0.650
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
11,880.000
|
$2.000
|
$1.000
|
$1.150
|
$0.010
|
$0.500
|
$2.500
|
$6.000
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
794.000
|
$3.000
|
$1.100
|
$1.150
|
$3.000
|
$2.300
|
$1.100
|
$3.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
5,962.000
|
$1.500
|
$0.850
|
$0.900
|
$3.000
|
$2.200
|
$0.850
|
$3.000
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
9,749.000
|
$5.000
|
$3.400
|
$3.580
|
$3.000
|
$2.580
|
$3.400
|
$3.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
3,229.000
|
$10.000
|
$6.750
|
$7.110
|
$6.000
|
$4.950
|
$6.750
|
$20.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
67.000
|
$200.000
|
$145.000
|
$153.000
|
$200.000
|
$155.000
|
$145.000
|
$250.000
|
|
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
|
EA
|
6.000
|
$305.000
|
$175.000
|
$184.000
|
$200.000
|
$165.000
|
$175.000
|
$500.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
54.000
|
$250.000
|
$160.000
|
$168.000
|
$200.000
|
$172.000
|
$160.000
|
$500.000
|
|
|
PAVEMENT SEALER 6"
|
LF
|
89,659.000
|
$0.300
|
$0.320
|
$0.340
|
$0.550
|
$0.450
|
$0.320
|
$0.650
|
|
|
PAVEMENT SEALER 8"
|
LF
|
1,487.000
|
$0.450
|
$0.550
|
$0.580
|
$0.650
|
$0.560
|
$0.550
|
$3.000
|
|
|
PAVEMENT SEALER 12"
|
LF
|
3,218.000
|
$0.800
|
$1.200
|
$1.260
|
$2.200
|
$1.800
|
$1.200
|
$6.000
|
|
|
PAVEMENT SEALER 24"
|
LF
|
885.000
|
$5.000
|
$2.000
|
$2.110
|
$3.000
|
$2.420
|
$2.000
|
$20.000
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
22.000
|
$100.000
|
$40.000
|
$42.000
|
$125.000
|
$100.000
|
$40.000
|
$250.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
16.000
|
$45.000
|
$50.000
|
$53.000
|
$120.000
|
$95.000
|
$50.000
|
$250.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
67,953.000
|
$0.900
|
$0.600
|
$0.630
|
$1.200
|
$1.000
|
$0.600
|
$0.650
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
87,278.000
|
$0.900
|
$0.600
|
$0.600
|
$1.200
|
$0.990
|
$0.570
|
$0.650
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
87,278.000
|
$0.900
|
$0.600
|
$0.600
|
$1.200
|
$0.990
|
$0.570
|
$0.650
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
3,398.000
|
$4.850
|
$3.850
|
$4.060
|
$6.000
|
$5.000
|
$3.850
|
$6.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
81,681.000
|
$0.650
|
$0.550
|
$0.580
|
$0.500
|
$0.380
|
$0.550
|
$0.650
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
1,487.000
|
$0.850
|
$0.700
|
$0.740
|
$0.550
|
$0.400
|
$0.700
|
$3.000
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
3,218.000
|
$3.000
|
$1.900
|
$2.000
|
$0.550
|
$0.430
|
$1.900
|
$3.000
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
885.000
|
$6.000
|
$2.500
|
$2.640
|
$0.750
|
$0.610
|
$2.500
|
$20.000
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
22.000
|
$80.000
|
$60.000
|
$63.000
|
$55.000
|
$46.000
|
$60.000
|
$250.000
|
|
|
ELIM EXT PAV MRK & MRKS (DBL ARROW)
|
EA
|
3.000
|
$80.000
|
$75.000
|
$79.000
|
$60.000
|
$51.000
|
$75.000
|
$500.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
16.000
|
$70.000
|
$60.000
|
$63.000
|
$65.000
|
$55.000
|
$60.000
|
$250.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
81,681.000
|
$0.250
|
$0.180
|
$0.190
|
$0.400
|
$0.300
|
$0.180
|
$0.650
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
1,487.000
|
$0.250
|
$0.280
|
$0.300
|
$0.450
|
$0.330
|
$0.280
|
$3.000
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
3,218.000
|
$0.500
|
$0.700
|
$0.740
|
$0.450
|
$0.360
|
$0.700
|
$3.000
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
885.000
|
$2.000
|
$1.000
|
$1.000
|
$0.550
|
$0.420
|
$1.000
|
$6.000
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
22.000
|
$50.000
|
$30.000
|
$32.000
|
$35.000
|
$25.000
|
$30.000
|
$250.000
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
3.000
|
$40.000
|
$35.000
|
$37.000
|
$40.000
|
$30.000
|
$35.000
|
$500.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
16.000
|
$35.000
|
$40.000
|
$42.000
|
$45.000
|
$37.000
|
$40.000
|
$250.000
|
|
|
VEH LP DETECT (SAWCUT)
|
LF
|
887.000
|
$15.000
|
$41.000
|
$45.000
|
$50.000
|
$34.000
|
$30.000
|
$15.000
|
|
|
REPAIR METAL RAIL (C4)
|
LF
|
10.000
|
$150.000
|
$500.000
|
$555.000
|
$350.000
|
$250.000
|
$200.000
|
$500.000
|
|
|
CONCRETE RAIL REPAIR (IN-KIND)
|
LF
|
15.000
|
$1,500.000
|
$900.000
|
$1,000.000
|
$1,050.000
|
$835.000
|
$840.000
|
$500.000
|
|
|
CNC CRACK REPAIR (DISCRETE)(GRAVITY)
|
LF
|
1,346.000
|
$45.000
|
$32.000
|
$37.000
|
$55.000
|
$44.000
|
$40.000
|
$100.000
|
|
|
CNC CRACK REPAIR (DISCRETE)(INJECT)
|
LF
|
250.000
|
$100.000
|
$118.000
|
$135.000
|
$141.000
|
$112.000
|
$45.000
|
$150.000
|
|
|
CONC CRCK REPR(DISCRETE)(ROUT AND SEAL)
|
LF
|
30.000
|
$70.000
|
$63.000
|
$72.000
|
$70.000
|
$56.000
|
$60.000
|
$100.000
|
|
|
REP STL BRIDGE MEMBER(STRAIGHTEN MEMB)
|
EA
|
1.000
|
$20,000.000
|
$100,000.000
|
$39,000.000
|
$25,000.000
|
$18,869.000
|
$6,500.000
|
$45,000.000
|
|
|
BRIDGE JOINT REPLACEMENT (SEJ)
|
LF
|
983.000
|
$400.000
|
$500.000
|
$1,100.000
|
$600.000
|
$602.000
|
$500.000
|
$1,250.000
|
|
|
MEMBRANE UNDERSEAL
|
GAL
|
48,382.000
|
$6.000
|
$0.010
|
$4.000
|
$5.000
|
$3.960
|
$4.000
|
$6.000
|
|
|
STONE-MTRX-ASPH SMA-C SAC-A PG76-22
|
TON
|
29,847.000
|
$210.000
|
$155.000
|
$211.000
|
$212.000
|
$222.810
|
$212.000
|
$185.000
|
|
|
REPLACE ELASTOMERIC BEARING PADS
|
EA
|
14.000
|
$15,000.000
|
$7,000.000
|
$8,000.000
|
$13,000.000
|
$10,142.000
|
$9,500.000
|
$8,500.000
|
|
|
INSTALL BRIDGE IDENTIFICATION NUMBERS
|
EA
|
17.000
|
$1,500.000
|
$2,000.000
|
$1,050.000
|
$250.000
|
$1,041.350
|
$50.000
|
$1,500.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$20,000.000
|
$50,000.000
|
$17,000.000
|
$10,000.000
|
$31,200.000
|
$20,000.000
|
$18,500.000
|
|
|
CONDUIT (PREPARE)
|
LF
|
825.000
|
$5.000
|
$6.000
|
$6.600
|
$10.000
|
$33.500
|
$10.000
|
$20.000
|
|
|
GROUND BOX (PREPARE)
|
EA
|
16.000
|
$350.000
|
$600.000
|
$685.000
|
$725.000
|
$1,430.000
|
$1,000.000
|
$500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
510.000
|
$250.000
|
$1.000
|
$0.100
|
$325.000
|
$250.000
|
$771.680
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
255.000
|
$210.000
|
$1.000
|
$0.100
|
$325.000
|
$25.000
|
$350.000
|
$550.000
|
|
|
RVDS(PRESENCE DETECTION ONLY)
|
EA
|
4.000
|
$12,000.000
|
$30,000.000
|
$32,000.000
|
$33,750.000
|
$14,942.000
|
$15,000.000
|
$30,000.000
|
|
|
REML & DISPL DRIFTWOOD & DEBRIS
|
CY
|
30.000
|
$3,500.000
|
$500.000
|
$550.000
|
$500.000
|
$624.360
|
$8,900.000
|
$3,000.000
|
|
Totals: |
$14,667,651.100
|
$14,715,096.440
|
$15,472,111.660
|
$16,767,046.750
|
$16,798,740.295
|
$17,587,738.770
|
$17,944,345.700
|