Show Job Controls
Bid Cobra

DALLAS SL 12 (0353-05-121)

Items: 48

County: DALLAS
Length: N/A
Highway: SL 12
District: DALLAS
Control Number: 0353-05-121
DBE Goal: N/A
Project: STP 2019(865)HES
Guaranty: N/A
Time: 135 WORKING DAYS
Engineer's Estimate: $4,252,869.50
Date: 06/04/2019 (7 years ago)
Contract Number: N/A
Type: SIGS, CHEV, BR RAIL, GRDRL, MRKS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$4,252,869.50
$4,663,152.50
Over/Under Est: 9.65% $410,283.00
Over/Under Est: 16.59% $705,670.50
Amt Left: 6.33% $295,387.50
Over/Under Est: 21.78% $926,324.86
Amt Left: 11.07% $516,041.86
Delta: -4.45% -$220,654.36
$5,269,656.73
Over/Under Est: 23.91% $1,016,787.23
Amt Left: 13.01% $606,504.23
Delta: -1.75% -$90,462.37

Bid Items & Bid Tabulations

48 Total 0 of 48
DALLAS  |  SL 12  |  DALLAS  |  0353-05-121  |  06/04/2019  |  $4,252,869.50  |  STP 2019(865)HES  |  SIGS, CHEV, BR RAIL, GRDRL, MRKS  |  135 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
GHB EQUIPMENT COMPANY, L.L.C.
RAGLE CONSTRUCTION, INC.
ED BELL CONSTRUCTION COMPANY
ALTUS CONSTRUCTION LLC
REMOVING CONCRETE(MOW STRIP)
LF 6,072.000 $7.500 $30.000 $5.000 $10.000 $16.500
REMOVING STAB BASE & ASPH PAV (6" - 8")
SY 367.000 $15.000 $30.000 $10.000 $20.000 $21.570
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 2,300.000 $14.000 $70.000 $50.000 $55.000 $28.760
SUPERPAVE MIXTURES SP-D SAC-B PG64-22
TON 135.000 $100.000 $250.000 $190.000 $150.000 $217.130
PLANE ASPH CONC PAV(0" TO 2")
SY 1,222.000 $5.000 $25.000 $5.000 $10.000 $6.810
CONC PVMT (CONT REINF - CRCP) (8")
SY 367.000 $50.000 $175.000 $80.000 $125.000 $150.000
RIPRAP (MOW STRIP)(4 IN)
CY 2,008.000 $450.000 $390.000 $600.000 $525.000 $405.000
RETROFIT RAIL (TY T1W)
LF 1,032.000 $225.000 $170.000 $230.000 $286.000 $315.930
RETROFIT RAIL (TY T551)
LF 890.000 $180.000 $110.000 $230.000 $135.000 $260.410
RETROFIT RAIL (TY T631)
LF 568.000 $100.000 $130.000 $130.000 $63.000 $150.860
RETROFIT RAIL (TY C221)
LF 663.500 $260.000 $120.000 $250.000 $212.000 $366.800
MOBILIZATION
LS 1.000 $374,786.000 $450,000.000 $480,000.000 $591,000.000 $525,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $10,500.000 $5,000.000 $50,000.000 $42,000.000 $50,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 500.000 $2.000 $7.000 $2.500 $5.250 $3.510
TEMP SEDMT CONT FENCE (REMOVE)
LF 500.000 $0.500 $2.000 $0.500 $1.050 $0.810
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 800.000 $4.000 $17.000 $5.000 $10.500 $5.180
BIODEG EROSN CONT LOGS (REMOVE)
LF 800.000 $1.000 $4.000 $1.000 $1.050 $1.460
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 2,200.000 $30.000 $50.000 $40.000 $31.500 $24.500
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 2,200.000 $7.000 $7.000 $10.000 $1.050 $5.790
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 2,200.000 $7.000 $11.000 $12.000 $11.550 $10.540
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 1,100.000 $75.000 $130.000 $84.000 $75.000 $85.070
RUMBLE STRIPS (SHOULDER)
LF 1,100.000 $1.000 $12.000 $3.950 $5.250 $8.760
MTL W-BEAM GD FEN (TIM POST)
LF 32,950.000 $21.000 $20.000 $16.750 $21.910 $21.250
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 94.000 $1,150.000 $1,300.000 $925.000 $1,043.300 $1,173.740
MTL THRIE-BEAM GD FEN (TIM POST)
EA 88.000 $1,550.000 $1,600.000 $1,300.000 $1,949.080 $2,473.390
REMOVE METAL BEAM GUARD FENCE
LF 33,225.000 $3.000 $7.000 $1.500 $3.650 $1.900
REMOVE TERMINAL ANCHOR SECTION
EA 94.000 $240.000 $1,000.000 $100.000 $130.410 $337.580
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 2.000 $163.000 $1,000.000 $100.000 $871.310 $580.280
GUARDRAIL END TREATMENT (INSTALL)
EA 152.000 $2,500.000 $2,600.000 $2,300.000 $2,686.500 $2,918.490
GUARDRAIL END TREATMENT (REMOVE)
EA 153.000 $282.000 $1,000.000 $200.000 $260.830 $330.330
CRASH CUSH ATTEN (MOVE & RESET)
EA 14.000 $1,500.000 $1,000.000 $1,000.000 $945.000 $1,903.720
CRASH CUSH ATTEN (REMOVE)
EA 11.000 $671.000 $700.000 $500.000 $630.000 $1,379.490
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 11.000 $20,000.000 $10,000.000 $27,500.000 $27,500.000 $20,540.000
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
EA 1.000 $29,500.000 $10,000.000 $38,000.000 $27,500.000 $45,932.130
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $7,500.000 $10,000.000 $7,500.000 $9,450.000 $11,913.130
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 2.000 $500.000 $600.000 $500.000 $735.000 $665.010
IN SM RD SN SUP&AM (RAIL MOUNT)
EA 17.000 $3,500.000 $800.000 $3,000.000 $2,950.000 $1,270.980
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 66.000 $15.000 $30.000 $20.000 $24.000 $46.110
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 691.000 $30.000 $35.000 $22.500 $29.210 $39.640
INSTL DEL ASSM (D-DY)SZ 1(BRF)GF2
EA 41.000 $35.000 $35.000 $22.500 $29.210 $30.550
PAVEMENT SEALER 4"
LF 3,085.000 $0.200 $1.500 $1.000 $1.150 $1.520
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
LF 1,685.000 $1.000 $2.500 $5.000 $5.250 $0.680
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
LF 1,400.000 $1.000 $2.500 $5.000 $5.250 $0.700
ELIM EXT PAV MRK & MRKS (4")
LF 3,085.000 $0.500 $7.000 $1.000 $1.150 $0.680
PAV SURF PREP FOR MRK (4")
LF 3,085.000 $0.200 $1.500 $1.000 $1.150 $0.150
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $17,000.000 $10,000.000 $10,500.000 $11,837.680
TMA (STATIONARY)
EA 6.000 $11,494.000 $6,000.000 $5,000.000 $10,500.000 $20,000.000
TMA (MOBILE OPERATION)
DAY 60.000 $140.000 $700.000 $500.000 $102.000 $225.930
Totals: $4,252,869.500 $4,663,152.500 $4,958,540.000 $5,179,194.360 $5,269,656.730